SC-Lee E2-CS 890717AGENDA RE ;:iF M
ITEM CAPTION:
STATUS REPORT ON THE INSTALLATION OF CROSSWALKS ON SANDY LAKE ROAD AT SAMUEL
BLVD. AND MEADOW RUN.
//~Dtrect6r'
STAFF REP.:
RU~nn R. DOYLE, P.E.
OFFICER KELLY
THE CISD HAS REQUESTED TWO (2) CROSS WALKS ON
FROM THE NORTHSIDE OF SANDY LAKE ROAD TO ~ ~-SC, H6K~L::.~ ~KI~RI; L~NB.
~L~T HEIXmST ~ZLL R~UIRE THE ZNS~ammTION O~ TmU'~'zc-
AS SIDEWALKS ALONG SAMUEL BLVD AND SANDY LAKE ROAD.
THE CITY OF COPPELL STAFF HAS BEEN WORKING WITH CISD ~0 ACCOMPLISH THAT REQUEST.
A STATUS REPORT WILL BE GIVEN DURING THIS JOINT MEETING.
BUDGET AMT
COMMENTS
AMT. ESTIMATED:
AMT.
FINANCIAL REVI~
0588DS
June 29, 1989
MEMORANDUM
TO:
FROM:
RE:
Mr. Alan Ratliff,
City Manager
Russel 1 Doyle~/~
City Enginee~J/
~o~os~.o ~ ~o~ ~ ~o~ c~s~c~ ~.~
Mutual Training-Bo has this and it is part of the High School Final
Plat approval.
2. Sandy Lake Sidewalks/Crosswalks/ School Zones/ Crossing Guards/
While Officer Kelly has been the Liason on this, Steve Goram and I have
worked with Office Kelley on the situation. Steve Goram is developing
costs for the sidewalks and I'm investigating the needs and/or doing the
Traffic engineering on the matter.
RRD/ch
Steve Goram
Officer Kelley