St Ann Catholic-LR000816REPORT OF DRILLE PIER INSPECTION a division 'of 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/07/2000 Report No.: 0020498 Report Date 08/16/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. Upon arrival to the jobsite, HBC's technician was told by the general contractor that reinforcing steel for the pier holes had not arrived and no pier drilling would began until the reinforcing steel arrived. HBC's technician was notified by the general contractor that pier drilling would begin on the next day. Technician Time: 6:00 a.m. to 11:00 a.m. erlnTechnician: Ervin Fards ' ' g, Inc. Report Distribution: (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppcll Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of thc client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Pa~e 1 of 1 CONCRETE COMPI SSIVE STRENGTH F a division of'l~ll 8901 Carpenter Frwy., Suite gl0 Dallas, Texas 7524' Date of Service: 08/08/2000 Report No.: 0020640 Report Date 08/16/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMEN~r DATE: 08/08/2000 BATCH TIME: I l:39am PLANT: 41 TIME SAMPLED: 1:00pm BY: Ervin Fan-is SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 89 F CONCRETE: 90 F SLt~IP: 5-7" TRUCK NO: 641 TICKET NO: 2704052 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METitOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report #0020639 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: F.5-4.9 REPORT OF TESTS ACCUM-IJLATIVE YARDS: 10 CYLLNDER MEASURED IYL~XIMUM COMPRESSIVE MARKED SLU311~ DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.50 08/15/2000 7 78450 2770 I 2 6.50 08/15/2000 7 84810 3000 Average 2890 1 3 6.50 09/05/2000 28 I 4 6.50 09/05/2000 28 Technician: Ervin Farris Started: Finished: H~ n~ Report Distribution: E ' (1) st. Ann's Catholic Community (1) Datum Engineering, Inc. ,~ (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 01LL Page I of 1 CONCRETE COMPRi. SSIVE STRENGTH TE . I' a division 8901 Carpenter Frwy., Suite #10~ Dallas, Texas 7524' Date of Service: 07/18/2000 Report No.: 0018668 Report Date 08/16/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard I80 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/18/2000 BATCH TIME: 9:23am PLANT: 41 TIME SAMPLED: 10:30m BY: Ervin Fan-is SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 96 F CONCRETE: 91 F SLU3,iP: 5.0" Max TRUCK NO: 453 TICKET NO: 2685351 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report gOO 18667 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: K- 15 REPORT OF TESTS ACCUhIULATIVE YARDS: l0 CYLINDER MEASURED MAX D,'I-U31 COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 7.00 07/25/2000 7 83120 2940 I 2 7.00 07/25/2000 7 86910 3070 Average 3010 I 3 7.00 08/15/2000 28 103280 3650 1 4 7.00 08/15/2000 28 103460 3660 Average 3660 Technician: Ervin Farris Started: Finished: ~ ngin~~ Report Distribution: E c. (1) st. Ann's Catholic Community (I) Datum Engineering, Inc. ~ (I) Centex Construction (I) City of Coppcll Eric $. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 01LL Page 1 of I CONCRETE COMPK. SSIVE STRENGTH r a divL;ion of ]~'-~ 8901 Carpenter Frwy., Suite #1( Dallas, Texas 7524 Date of Service: 07/17/2000 Report No.: 0018563 Report Date 08/16/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTILA. CTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/17/2000 BATCH TIME: 8:36am PLANT: 41 TIME SAMPLED: 9:25am BY: Ervin Farris SPECIHCATION REQUIREMENTS WEATIIER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)-AIR 87 F CONCRETE: 90 F SLUbIP: 5-7" TRUCK SO: 836 TICKET NO: 26841 18 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report g0018562 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 1-20.4 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAX~-HYM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.50 07/24/2000 7 97060 3430 1 2 6.50 07/24/2000 7 95260 3370 Average 3400 1 3 6.50 08/14/2000 28 131260 4640 1 4 6.50 08/14/2000 28 127890 4520 Average 4580 Technician: Ervin Fan-is Started: Finished: ~ /~ Report Distribution: En - (1) st. Ann's Catholic Community (I) Datum Engineering, Inc. . (1) Centex Cons~'uction (I) Ci~, of Coppell Eric J. Cleveland, P.E. ( I ) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1