St Ann Catholic-LR000815CONCRETE COMPR. SSIVE STRENGTH i'
a division
8901 Carpenter Frwy., Suite #10~
Dallas, Texas 7524'
Date of Service: 07/14/2000 Report No.: 0018375 Report Date
08/15/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 9506
CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/14/2000 BATCHTIME: 8:28am
PLANT: 41 TIME SAMPLED: 9:15am BY: Ervin Farris
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRENGTH: 3000 psi @ 28 Days TE~IPF. RATURE (F)- AIR 96 g CONCRETE: 89 F
SLt~IP: 5-7" TRUCK NO: 716 TICKET NO: 2682954
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcO: N/A
TEST METHOD: ASTM C-143 PLACEMENT LOCATION:
Pier information and technician time: See Report gOO 18374
ASTM C-172
ASTM C-39
SAMPLE LOCATION: 17.7-Q
REPORT OF TESTS ACCUMULATIVE YARDS: 10
CYLINDER MEASURED I~L~, XIMb31 COMPRESSIVE
I~La. RKED SLUMP DATE AGE LOAD STRENGTH FIL~,CTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.75 07/21/2000 7 92030 3250
I 2 5.75 07/21/2000 7 86680 3070
Average 3160
1 3 5.75 08/11/2000 28 127240 4500
I 4 5.75 08/11/2000 28 133070 4710
Average 4610
Technician: Ervin Fan-is Started: Finished: ~ eer/~~. '
Report Distribution: Engin
(1) St. Ann's Catholic Community (I) Datum Engineering. Inc.
(1) Centex Construction (I) City of Coppcll Eric J. Cleveland, P.E.
(I) City of Coppell Senior Project Engineer
( I ) Alliance Architects
This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc.
0ILL Page 1 of I