Loading...
St Ann Catholic-LR000815CONCRETE COMPR. SSIVE STRENGTH i' a division 8901 Carpenter Frwy., Suite #10~ Dallas, Texas 7524' Date of Service: 07/14/2000 Report No.: 0018375 Report Date 08/15/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/14/2000 BATCHTIME: 8:28am PLANT: 41 TIME SAMPLED: 9:15am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TE~IPF. RATURE (F)- AIR 96 g CONCRETE: 89 F SLt~IP: 5-7" TRUCK NO: 716 TICKET NO: 2682954 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcO: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report gOO 18374 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 17.7-Q REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED I~L~, XIMb31 COMPRESSIVE I~La. RKED SLUMP DATE AGE LOAD STRENGTH FIL~,CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.75 07/21/2000 7 92030 3250 I 2 5.75 07/21/2000 7 86680 3070 Average 3160 1 3 5.75 08/11/2000 28 127240 4500 I 4 5.75 08/11/2000 28 133070 4710 Average 4610 Technician: Ervin Fan-is Started: Finished: ~ eer/~~. ' Report Distribution: Engin (1) St. Ann's Catholic Community (I) Datum Engineering. Inc. (1) Centex Construction (I) City of Coppcll Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the usc of the client indicated above and shall not be reproduced except in full without thc written approval of HBC Engineering, Inc. 0ILL Page 1 of I