St Ann Catholic-LR000811:REPORT OF DRILLE , PIER INSPECTION a division of]~afl--~glf 8901 Carpenter Frwy., Suite #10( Dallas, Texas 7524~ Date of Service: 07/26/2000 Report No.: 0019430 Report Date 08/11/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. See the attached sheet for recorded data. *NOTE: Piers G/4.9, K/4.9 and K.7/4.9, six #6 reinforcing bars were placed in these piers in lieu of six #8 reinforcing bars. Technician Time: 6:00 a.m. to 1:00 p.m. - E. Farris 1:00 p.m. to 7:00 p.m. - B. Cuble Report Distribution: (1) St. Ann's Caflaolic Community (I) Datum Engineering. Inc. (1) Centex Construction (I) City of Coppell Eri . . . (1) City of Coppell Senior Project Engineer (i) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SS Pa~e 1 of I 8901 Carpenter Frwy., Suite 100 Dallas, Texas 75247 Project: St. Ann's Catholic Church Report No.: 0019430 180 Samuel Boulevard, Coppell, Texas Date of Service: 07/26/00 Project No.: 94001 ]52 Technician: E. Farfis Driller: Page: I of ! Pier Identification B/8.4 E.5/8.5 K.7/4.9 14/4.9 E.8/15.1 J/5 B/4.4 H/5 G/4.9 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 Top of Ground Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A N/^ Depth to Bearing Stratum from Ground (ft.) 43.08 43.18 44.18 44.5 42.0 44.0 45.5 44.0 44.5 Depth of Pier from Ground (ft.) 50.5 55.25 59.25 67.18 45.33 65.0 53.0 65.1 65.9 Required Penetration (ft.) 6 12 15 21 3 21 6 21.0 21.0 Actual Penetration (ft.) 7.42 12.08 15.08 22.66 3.33 21.0 7.5 21.1 21.4 Depth from Top of Concrete (ft.) 49.0 53.25 57.25 65.08 45.33 63.0 50.33 63.0 64.9 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 26 26 26 26 26 26 26 26 26 Cased Depth (ft.) 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 ~ Q 6 66 6 (~ Length of Vertical Bars (ft.) 53.75 57.5 62.92 70.83 47.5 68.5 49.9 68.6 70.0 Time Drilling was Completed 7:15a.m. 8:02a.m. 10:52a.m. 11:25a.rn. 11:45a.m. 12:42p.m. 3:11p.m. 3:46p.m. 4:20p.m. Time Concrete was Placed 9:31 a.m. 10:03a.m. 1:20p.m. 1:42p.m. 1:00p.m. 2:15p.m. 3:40 p.m. 4:50 p.m. 5:35 p.m. 'REPORT OF DRILLE PIER INSPECTION a division of'l~-'~:~iMI 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/2000 Report No.: 0019571 Report Date 08/11/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. See the attached sheet for recorded data. *NOTE: Piers F.4/4.9, K/6 and K.7/6, six #6 reinforcing bars were placed in these piers in lieu of six #8 reinforcing bars. Technician Time: 6:00 a.m. to 6:00 p.m. Technician: Ervin Farris H~ E~ Report Distribution: ( I ) St. Ann's Catholic Community ( 1 ) Datum Engineering, Inc. ( I ) Centex Construction ( 1 ) City of Coppell Eric J. Cleveland, P.E. (I) CiD' of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SS Paee 1 of 1 ENGINEERINg, INC. 8901 Carpenter Frwy., Suite 100 Dallas, Texas 75247 Project: St. Ann's Catholic Church Report No.: 0019571 180 Samuel Boulevard, Coppell, Texas Date of Service: 07/27/00 Project No.: 94001152 lechnician: E. Farris Driller: Page: 1 of 1 I l Pier Identification B/4.5 K.7/6 KJ6 A.2/4.4 A.2/4.5 I/8.5 A.1/6.8 F.4/4.9 A.1/4.9 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 Top of Ground Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A N/A Depth to Bearing Stratum from Ground (ft.) 46.0 45.0 45.42 45.18 45.18 47.0 46.08 43.83 45.66 Depth of Pier from Ground (ft.) 53.08 60.18 61.18 54.83 51.66 56.83 55.66 59.1 56.8 Required Penetration (ft.) 6 15 15 6 6 9 9 15 9 Actual Penetration (ft.) 7.08 15.18 15.75 9.66 6.5 9.83 9.58 15.25 10.18 Depth from Top of Concrete (ft.) 51.5 58.83 60.66 51.08 49.66 54.33 54.83 58.42 54.83 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry (, Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 26 26 26 26 26 26 26 26 26 Cased Depth (ft.) 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 ~6-,~ 6 Reinforcing Bar Size (#) 6 (6~(~) 6 6 6 6 6 Length of Vertical Bars (ft.) 51.08 62.92 64.33 50.33 47.18 57.92 54.08 63.25 54.92 Time Drilling was Completed 8:34 a.m. 10:20 a.m. 10:45 a.m. 10:55 a.m. 11:33 a.m. 1:36 p.m. 2:41 p.m. 3:46 p.m. 3:30 p.m. Time Concrete was Placed 9:53 a.m. 12:32 p.m. 2:22 p.m. 12:55 p.m. 1:53 p.m. 3:15 p.m. 3:41 p.m. 4:03 p.m. 4:48 p.m. REPORT OF DRILLE,.. PIER INSPECTION a division of~-'d~Jgl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/03/2000 Report No.: 0020214 Report Date 08/11/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. See atnached sheet for recorded data. Technician Time: 6:00 a.m. to 12:00 p.m. Technician: Ervin Fan-is ~ E~nc. Report Distribution: (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. ( 1 ) Centex Construction ( 1 ) City of Coppell Eric J. Cleveland, P.E. ( 1 ) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Pa~e 1 of 1 F2qGINEERING, 13qC. 8901 Carpenter Frwy., Suite 100 Dallas, Texas 75247 Project: St. Ann's Catholic Church Report Ho.: 0020214 180 Samuel Boulevard, Coppell, Texas Date of Service: 08/03/00 Project Ho.: 94001152 Technician: E. Fail'is Driller: Page: 1 of 1 Pier Identification 0.9-8.5 P.5-9 Pier Diameter (in.) 24 24 Top of Ground Elevation (ft.) N/A N/A Top of Pier Elevation (ft.) N/A N/A Depth to Bearing Stratum from Ground (ft.) 41.18 41.0 Depth of Pier from Ground (ft.) 51.25 50.42 Required Penetration (ft.) 9 9 Actual Penetration (ft.) 10.08 9.42 Depth from Top of Concrete (ft.) 51.0 49.92 Condition of Bottom (wet or dry) Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Casing Diameter (in.) 26 26 Cased Depth (ft.) 45.0 45.0 Number of Vertical Bars (ea.) 6 6 Reinforcing Bar Size (#) 6 6 Length of Vertical Bars (ft.) 53.42 49.42 Time Drilling was Completed 8:21 a.m. 7:58 a.m. Time Concrete was Placed 10:05 a.m. 10:31 a.m. 'cONCRETE COMPRbJ SIVE STRENGTH TES.' a division ofl~p, rf-m~rl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/02/2000 Report No.: 0020123 Report Date 08/i 1/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEME.NT DATE: 08/02/2000 BATCH TIME: N/A PLANT: 38 TIME SAMPLED: 3:15pm BY: Shane Spinks SPECIFICATION REQUIREMENTS %~.THER coN~rrlONS: Sunny, warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 104 V CONCRETE: 97 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CON-tENor (%): 1.3 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report 00020122 ASTM C-172 ASTM C-39 SAMPLE LOCATION: H-2, G-2, F-2 REPORT OF TESTS ACCU*IULATIYE YARDS: 10 CYLINDER MEASURED IVlAXIMUM COMPRESSIVE I~RKED SLUM[P DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 4.00 08/09/2000 7 106110 3750 I 2 4.00 08/09/2000 7 108350 3830 Average 3790 1 3 4.00 08/30/2000 28 I 4 4.00 08/30/2000 28 Technician: Shane Spinks Started: Finished: ~ ~ Report Distribution: (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. ( I ) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. ( I ) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 CONCRETE COMPRL SIVE STRENGTH TES a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/02/2000 Report No.: 0020107 Report Date 08/11/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX i.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/02/2000 BATC}I TI~tE: 8:1 lam PLANY: 41 TE~-IE SAMPLED: 8:38am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER CONmTIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 83 F CO~,'CRETE: 84 F SLIJMP: 5-7" TRUCK NO: 921 TICKETNO: 2698630 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METItOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report ~0020106 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: R.3-10.5 REPORT OF TESTS ACCLIMULATIVE YARDS: 10 CYLINDER MEASURED MAXD,-FO'M COMPRESSIVE I~LARKED SLU3,1P DATE AGE LOAD STRENGTIt FIL4,CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 08/09/2000 7 109700 3880 1 2 6.00 08/09/2000 7 110610 3910 Average 3900 1 3 6.00 08/30/2000 28 1 4 6.00 08/30/2000 28 Technician: Ervin Fan-is Started: Finished: I---I~ _ /~A Report Distribution: ~,~~,,dnc. (i) St. Ann's Catholic Community (1) Datum Engineering, Inc. (!) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of I CONCRETE COMPRESSIVE STRENGTH TE,o 1' a division ofl~afl-'~l~ 8901 Carpenter Frwy., Suite Dallas, Texas 752A Date of Service: 07/12/2000 Report No.: 0018159 Report Date 08/11/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONT~CTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/12/2000 BATCH TIME: 10:22am PLANT: 4 1 TIME SAMPLED: 1 1:25am BY: Mike Whyman SPECIFICATION' REQUIREMENWS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 94 F CONCRETE: 92 F SLUMP: 5-7" TRUCK NO: 82 TICKET NO: 2680722 AIR: N/A AIR co:~rrEm' (~): N/A uNrr WEIGltT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMEN'r LOCATION: Pier information and technician time: See Report gOO 18158 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier 1/20.8 REPORT OF TESTS ACCUM'ULATIVE YARDS: 40 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 6.50 07/19/2000 7 105450 3730 1 2 6.50 07/19/2000 7 109700 3880 Average 3810 1 3 6.50 08/09/2000 28 150500 5320 I 4 6.50 08/09/2000 28 155300 5490 Average 5410 Technician: Mike Whyman Started: Finished: I'-BE e~ Report Distribution: Engine lne, (1) St. Ann's Catholic Community (1) Datum Engineering. inc. ~,,~ v , ( 1 ) Centex Construction (I) City of Coppcll Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HDC Engineering, Inc. 0ILL Page I of 1