St Ann Catholic-LR000810"cONCRETE COMPRi. SSIVE STRENGTH TE . £ a divL~ion ofl[Laft"~l 8901 Carpenter Frwy., Suite #10 Dallas, Texas 7524 Date of Service: 08/01/2000 Report No.: 0019976 Report Date 08/10/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA COiN'TRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/01/2000 BATCH TIME: 8:38am PLA:NY: 41 TIME SAMPLED: 9:45am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 88 F CONCRETE: 83 SLUMP: 5-7" TRUCK NO: 927 TICKET NO: 2697569 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMEN-T LOCATION: Pier information and technician time: See Report #0019975 ASTM C~ 172 ASTM C-39 SAMPLE LOCATION: Q.9-6.3 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED ,~LS, XE~IU ,'~1 COMPRESSIVE MARKED SLL~-IP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.75 08/08/2000 7 85660 3030 1 2 5.75 08/08/2000 7 82840 2930 Average 2980 1 3 5.75 08/29/2000 28 1 4 5.75 08/29/2000 28 Technician: Ervin Farris Started: Finished: ~ ~C Report Distribution: E ' ' . (I) st. Ann's Catholic Community (I) Datum Engineering, Inc. (I) Centex Construction ( l ) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, inc. 01LL Page 1 of 1 cONCRETE COMPRe,, SSIVE STRENGTH TE . _/' a division of]~ff'~t~Of 8901 Carpenter Frwy., Suite #10~ Dallas, Texas 7524; Date of Service: 08/01/2000 Report No.: 0019978 Report Date 08/10/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/01/2000 BATCIITIME: N/A PLANT: 38 TIME SAMPLED: 3:40pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATItER CONDITIONS: Sunny, warm STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)-AIR 100 F CONCRETE: 92 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): !.8 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report #0019977 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 0-3, N-3, M.5-3, M-3, L.5-3 REPORT OF TESTS ACCUML-LATIVI ; YARDS: 200 CYLINDER MEASURED MAX~IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 08/08/2000 7 108530 3840 ! 2 5.25 08/08/2000 7 116000 4100 Average 3970 i 3 5.25 08/29/2000 28 I 4 5.25 08/29/2000 28 Technician: Shane Spinks Started: Finished: ~ En '~~ng, Report Distribution: Inc. ( I ) St. Ann's Catholic Community ( 1 ) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. O1LL Page 1 of 1 cONCRETE COMPR..J$SIVE STRENGTH £ a division of'l~'-~t:~, 8901 Carpenter Frwy., Suite #10t Dallas, Texas 7524; Service: 08/01/2000 Report No.: 0019995 Report Date Date of 08/10/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTILACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 08/01/2000 BATCII TIME: N/A PLANT: 38 TIME SAMPLED: 5:20pm }~v: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CO.~'DrrIoNs: Sunny, warm STRENGTII: 3000 psi @ 28 Days TEMPEILATURE(F)-AIR 101 F CORCRET~: 98 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 2.5 UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Grade beam ASTM C- 172 Technician Time: See Report #0019977 ASTM C-39 SAMPLE LOCATION: C-I 7 REPORT OF TESTS ACCLqX'IULATIVE YARDS: 10 CYLINDER MEASURED i~LAXIML3I COMPRESSIVE MARKED SLLIMP DATE AGE LOAD STRENGTH FIL&CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.00 08/08/2000 7 109620 3880 1 2 5.00 08/08/2000 7 113450 4010 Average 3950 1 3 5.00 08/29/2000 28 1 4 5.00 08/29/2000 28 Technician: ShaneSpinks Started: Finished: H~C n~ne~ n~e. Report Distribution: E ( I ) st. Ann's Catholic Community. ( I ) Datum Engineering, Inc. (I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. ( I ) City of Coppell Senior Project Engineer (l) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 'REPORT OF DRILLEL BELLED PIER INSPEt..'ION a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/01/2000 Report No.: 0019977 Report Date 08/10/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled belled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheet for recorded data. Technician Time: 6:00 a.m. to 6:00 p.m. Report Distribution: ( 1 ) St. Ann's Catholic Community ( 1 ) Datum Engineering. Inc. (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for lhe use of the client indicated above and shall not be reproduced except in full without the written approval of H BC Engineering, Inc. 99SDS Pat~e 1 of I ~90! Ca~n~.r Fr~v3~.. Suite Dallas. Texas 75247 Project: St. Ann's Catholic Church Report No.: 0019977 180 Samuel Boulevard, Coppell, Texas Date of Service: 08/01/00 Project No.: 94001152 Technician: S. Spinks Driller: N.L. Schulte Page: I of 1 Pier Identification 0-3 N-3 M.5-3 M-3 L.5-3 L-3 O.9-2 N.5-2 M.5-2 L.8-2 II Pier Diameter (in.) 18 18 18 18 18 18 24 30 30 30 Bell Diameter (in.) 48 48 48 48 48 48 54 66 66 66 Top of Pier Elevation (ft) 97.0 97.0 97.0 97.0 97.0 97.0 97.0 97.0 97.0 97.0 Req. Depth from Exist. Grade (ft) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Initial Depth of Pier from Existing Grade (ft) 14.6 14.5 14.5 15.2 14.5 15.0 14.5 14.3 14.7 13.0 Final Depth of Pier from Existing Grade (ft) 14.9 14.9 15.0 15.0 14.5 15.1 14.5 14.1 14.7 12.9 Depth from Top of Concrete (ft) 14.4 14.4 14.5 14.5 14.0 14.6 14.0 13.6 14.2 12.4 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A ) Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (it) 7 7 7 7 7 7 7 7 7 7 Length of Vertical Bars (ft.) 15.4 15.4 15.5 15.5 15.0 15.6 16.0 15.5 15.2 13.5 Time Drilling was Completed 9:00 a.m. 9:15 a.m. 9:30 a.m. 9:40 a.m. 10:00 a.m. 10:30 a.m. 1:30 p.m. 2:00 p.m. 2:30 p.m. 3:00 p.m. Time Concrete was Placed 12:50 p.m. 12:55 p.m. 1:00 p.m. 1:05 p.m. 1:10 p.m. 1:15 p.m. 3:15 p,m. 3:45 p.m. 4:00 p.m. 5:00 p.m. "REPORT OF DRILLE . PIER INSPECTION a division 8901 Carpenter Frwy., Suite #I0{ Dallas, Texas 75247 Date of Service: 08/02/2000 Report No.: 0020106 Report Date 08/10/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering nechnician arrived at the above referenced jobsite as scheduled for drilled pier inspection. See attached sheet for recorded data. Technician Time: 6:00 a.m. to 5:30 p.m. Technician: Ervin Fan-is ~ Engin '~ Report Distribution: ( I ) St. Ann's Catholic Community ( I ) Datum Engineering. Inc. (I) Centex Construction (i) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 99SDS Pa-e 1 of I ENGINEERING, ~.'C. 8901 Carpenter Frwy., Suite 100 Dallas, Texas 75247 Project: St. Ann's Catholic Church Report No.: 0020106 180 Samuel Boulevard, Coppell, Texas Date of Service: 08/02/00 Project No.: 94001152 Technician: E. Farris Driller: Page: 1 of 1 Pier Identification R.3-10.5 Q.9-10.5 N.3-8 M-3.8 N.3-9 P.3-8 R-9 R-8 P.3-8.5 II I! Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 Top of Ground Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A N/A Depth to Bearing Stratum from Ground (ft.) 46.75 47.0 42.18 42.0 45.0 40.5 45.0 40.33 41.5 Depth of Pier from Ground (ft.) 51.0 52.0 54.5 54.0 54.08 55.58 58.42 55.5 50.66 Required Penetration (ft.) 3 3 12 12 9 15 12 15 9 Actual Penetration (ft.) 4.25 5.0 12.33 12.0 9.08 15.08 13.42 15.18 9.18 Depth from Top of Concrete (ft.) 51.0 51.83 53.33 52.83 54.08 54.58 57.83 55.0 50.0 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 26 26 26 26 26 26 26 26 26 Cased Depth (ft.) 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 Length of Vertical Bare (ft.) 50.83 49.92 53.25 52.75 52.75 54.25 57.75 54.58 52.83 Time Drilling was Completed 7:26 a.m. 7:43 a.m. 7:56 a.m. 7:29 a.m. 9:56 a.m. 11:33a.m. 1:11 p.m. 1:16p.m. 2:30 p.m. Time Concrete was Placed 8:45 a.m. 9:22 a.m. 9:51 a.m. 10:37 a.m. 11:48 a.m. 1:49 p.m. 2:40 p.m. 3:13 p.m. 4:01 p.m. CONCRETE COMPR.. SSIVE STRENGTH TE _ r ENGL\T_.ERLNG, LqC. a division of'l~-'d~ 8901 Carpenter Frwy., Suite #11 Dallas, Texas 752~ Date of Service: 07/11/2000 Report No.: 0018020 Report Date 08/10/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DAT~: 07/11/2000 BATCH T~-IE: 8:36am PLANT: 41 TIME SAMPLED: 9:00am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 89 F CONCRETE: 84 F SLtrMp: 5-7" TRCCK NO: 835 TICKET NO: 2679354 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Piers- See Report g0018019 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 2 I-G.9 REPORT OF TESTS ACCUM-15LATIVE YARDS: 20 CYLINDER MEASURED I~L4,XLML ~%1 COMPRESSIVE NL~RKED SLUMP DATE AGE LOAD STRENGTII FIL~CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 6.00 07/18/2000 7 112680 3980 1 2 6.00 07/18/2000 7 115050 4070 Average 4030 1 3 6.00 08/08/2000 28 124550 4400 1 4 6.00 08/08/2000 28 128230 4530 Average 4470 Technician: ErvinFarris Started: N/A Finished: N/A ~...-..-.~ E__... ~g~n Report Distribution: ~_~_ C. (1) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction ( 1 ) City of Coppell Eric J. Cleveland. P.E. ( 1 ) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page I of I