Loading...
St Ann Catholic-LR000809· REPORT OF DRILL PIER INSPECTION "" a division of 8901 Carpenter Frwy., Suite #10 Dallas, Texas 7524 Date of Service: 07/25/2000 Report No.: 0019314 Report Date 08/09/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection· On this date, an HBC Engineering technician arrived at The above referenced jobsite as scheduled for drilled pier inspection. See attached sheet for recorded data. Technician Time: 6:00 a.m. to 6:30 p.m. Technician: Ervin Farris ~ Eng__' Report Distribution: (I) St. Ann's Catholic Community (I) Datum Engineering. Inc. ' (!) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 99SDS Pa~e 1 of I 8901 Carpenter Fnvy., Suite 100 Dallas, Texas 75247 Project: St. Ann's Catholic Church Report No.: 0019314 180 Samuel Boulevard, Coppell, Texas Date of Service: 07/25/00 Project No.: 94001152 Technician: E. Farris Driller: Page: I of 1 Pier Identification A-8.9 X-8.1 P-18 M-17 P-17 C.5-8.7 E.5-10.2 N-17 A-8.4 M.5-18 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 24 Top of Ground Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Depth to Bearing Stratum from Ground (ft.) 43.08 44.0 45.0 45.25 46.0 40.0 43.0 43.83 42.0 44.0 Depth of Pier from Ground (ft.) 59.0 53.66 60.75 58.0 62.5 45.5 61.5 52.83 53.18 53.75 Required Penetration (ft.) 15 9 15 12 15 15 18 9 9 9 Actual Penetration (ft.) 15.92 9.66 15.75 12.75 16.5 15.5 18.5 9.0 11.18 9.75 Depth from Top of Concrete (ft.) 58.25 52.92 59.0 56.0 60.5 44.92 60.5 51.66 52.18 52.75 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 26 26 26 26 26 26 26 26 26 26 Cased Depth (ft.) 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 62.66 56.08 63.58 60.25 64.33 58.08 63.5 55.08 54.5 56.83 Time Drilling was Completed 7:51 a.m. 7:03 a.m. 7:30 a.m 8:54 a.m. 12:29 p.m. 12:48 p.m. 12:07 p.m. 1:36 p.m. 3:40 p.m. 4:41 p.m. Time Concrete was Placed 10:26 a.m. 10:07 a.m. 10:39 a.m. 11:01 a.m. 3:21 p.m. 2:18 p.m. 2:40 p.m. 2:36 p.m. 4:32 p.m. 5:22 p.m. REPORT OF DRILLE BELLED PIER INSPE. 'YION ENGINe, hXC. a division 8901 Carpenter Frwy., Suite #10~ Dallas, Texas 75247 Date of Service: 07/27/2000 Report No.: 0019597 Report Date 08/09/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled belled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheet for recorded data. Technician Time: 6:00 a.m. to 3:30 p.m. Technician: Shane Spinks ~ Engin~ Report Distribution: (I) St. Ann's Catholic Cormnunity (1) Datum Engineering, Inc_ (1) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 99SDS Pa~e 1 of 1 890l Carpemer Frwy., Su,te #lO0 Dallas, Texas 75247 Project: St. Ann's Catholic Church Report No.: 0019597 180 Samuel Boulevard, Coppell, Texas Date of Service: 07/27/00 Project No.: 94001152 Technician: S. Spinks Driller: Page: 1 of 1 Pier Identification 0.9-3.2 O.9-3.4 0.9-3.5 0.9-3.6 0.9-3.8 O.9-3.9 O.9-4.2 O.9-4.3 O.9-4.4 O.9-4.5 Pier Diameter (in.) 24 24 24 24 24 24 24 24 24 24 Bell Diameter (in.) 54 54 54 54 54 54 54 54 54 54 Top of Pier Elevation (ft) 97.0 97.0 97.0 97.0 97,0 97.0 97.0 97.0 97.0 97.0 Req, Depth from Exist. Grade (ft) 8.0 8.0 8.0 8.0 8.0 8.0 8,0 8.0 8.0 8.0 Initial Depth of Pier from Existing Grade (ft) 19,0 18,5 17,9 16.9 16.8 16.7 16.1 17.3 16.6 16.5 Final Depth of Pier from Existing Grade (ft) 20.4 18.8 17.3 16.8 16.9 16.6 16.1 16.9 16.5 16.2 Depth from Top of Concrete (ft) 19.9 18.3 16.8 16.3 16.4 16.1 15.7 16.4 16.1 15,7 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 7 7 7 7 7 7 7 7 7 7 Length of Vertical Bars (ft.) 21.0 20.5 18.0 17.5 17.5 17.3 17.0 17.5 17.0 17.0 Time Drilling was Completed 10:30a.m. 11:00a.m. 11:30a.m. 12:00p.m. 1:00p.m. 1:30p.m. 2:00p.m. 2:30p.m. 3:00p.m. 3:30p.m. Time Concrete was Placed 4:00 p.m. 4:10 p.m. 4:20 p.m. 4:30 p.m. 5:00p.m, 5:20 p.m. 5:40 p.m. 6:00 p.m. 6:10 p.m. 6:30 p.m. REPORT OF DRILLEL PIER INSPECTION a division of']~tf-'~gg~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/28/2000 Report No.: 0019678 Report Date 08/09/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. See attached sheet for recorded data. Technician Time: 6:00 a.m. to 5:00 p.m. Technician: Ervin Farris I-BC Eng~ Report Distribution: (I) St. Ann's Catholic Community (I Datum Engineering, Inc. (!) Centex Construction (I City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Pa-e I of I ENGINEERING, INC. 8901 Carpenter Frwy.. Suite 100 Dallas. Texas 75247 Project: St. Ann's Catholic Church ReportNo.: 00]9675 180 Samuel Boulevard, Coppell, Texas Date of Service: 07/28/00 Project No.: 9400115:2 Technician: E. Fan'is Driller: Page: ] Of ] Pier Identification G-6 A.1-4.7 F.4-6 B-4.7 G-8.5 D.5-5.5 F.5-8.5 B-6.8 Pier Diameter (in.) 24 24 24 24 24 24 24 24 Top of Ground Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A N/A Depth to Bearing Stratum from Ground (ft.) 45.0 44.0 46.25 44.0 46.5 43.0 46.0 43.66 Depth of Pier from Ground (ft.) 60.25 53.66 61.33 53.58 56.0 52.42 55.08 50.0 Required Penetration (ft.) 15 9 15 9 9 9 9 6 Actual Penetration (ft.) 15.25 9.66 15.08 9.58 9.5 9.42 9.08 6.33 Depth from Top of Concrete (ft.) 59.0 52.66 60.33 50.83 54.0 51.92 53.0 47.83 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 26 26 26 26 26 26 26 26 Cased Depth (ft.) 45.0 45.0 45.0 45.0 45.0 45.0 45.0 45.0 Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 8 6 8 6 6 6 6 6 Length of Vertical Bars (ft.) 63.92 52.25 65.33 54.75 57.5 51.33 59.6 47.08 Time Drilling was Completed 7:38 a.m. 7:53 a.m. 9:00 a.m. 8:35 a.m. 11:10 a.m. 11:21 a.m. 2:04 p.m. 2:43 p.m. Time Concrete was Placed 10:12 a.m. 11:33 a.m. 12:05 p.m. 9:50 a.m. 12:36 p.m. 12:58 p.m. 2:40 p.m. 3:55 p.m. :REPORT OF DRILLED BELLED PIER INSPEL_FION ENGI,NE~, INC. a division 8901 Carpenter Frwy., Suite #I0~ Dallas, Texas 7524' Date of Service: 07/28/2000 Report No.: 0019707 Report Date 08/09/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell. Texas Services: Drilled belled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier inspection. See attached shee~ for recorded data. Technician Time: 6:00 a.m. to 3:00 p.m. Report Distribution: (1) St. Ann's Catholic Community (I) Datum Engineering. Inc. ' ( I ) Centex Construction ( I l City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Page 1 of I REPORT OF DRILLED BELLED PIERS ENGkNEERING, 8901 C~,penter Frwy.. Suite ~100 Dallas. Texas 75247 Project: St. ^nn's Catholic Church Report No.: 0019707 180 Samuel Boulevard, Coppell, Texas Date of Service: 07/28/00 Project No.: 94001152 Technician: S. Spinks Driller: Page: I of 1 Pier Identification O-3.1 0-3.2 0-3.4 0-3.5 0-3.6 0-3.8 0-3.9 Pier Diameter (in.) 18 18 18 18 18 24 30 Bell Diameter (in.) 48 48 48 48 48 54 60 Top of Pier Elevation (ft) 97.0 97.0 97.0 97.0 97.0 97.0 97.0 Req. Depth from Exist. Grade (ft) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Initial Depth of Pier from Existing Grade (ft) 17.0 15.7 15.9 16.5 15.3 16.0 15.9 Final Depth of Pier from Existing Grade (ft) 17.0 15.9 15.9 17.3 16.8 16.0 15.9 Depth from Top of Concrete (ft) 15.0 15.9 13.9 15.3 14.8 14.0 13.9 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 7 7 7 7 7 7 7 Length of Vertical Bars (ft.) 17.5 16.5 16.5 17.9 17.5 16.5 16.5 Time Drilling was Completed 11:00 a.m. 11:30 a.m. 12:00 p.m. 1:30 p.m. 2:00 p.m. 2:30 p.m. 3:00 p.m. Time Concrete was Placed 3:00 p.m. 3:30 p.m. 3:45 p.m. 4:00 p.m. 4:15 p.m. 4:30 p.m. 4:40 p.m. REPORT OF REINFORCING STEEL INSPECTION 8901 Cm'l~nter Frwy., Suile #100 Dallas, Texas 75247 Date of Service: 08/09/00 Report No.: 0020783 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church 180 Samuel Boulevard 180 Samuel Boulevard Coppell, Texas 75019 Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Structural Locations/Items Inspected: Retaining Walls on N side, line 10 and lines G to I; and S face, line 17, lines G to G.5 Test Method: Visual Observation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column m, ed Properly X Bar Size X Proper Bar Placement X T,es and Spaces X Bar Grade X Properly T,ed X Sbrrup Spac=ngFl'ype X. Rebar Clean X Dowel Bars m Place X Weldec~ Splices Form Clean X Proper Bar Supports X Mec.~.amcal Splices Number of Bars X Lapped Sp~,ces X Proper Cover X Discrepancies/Comments: No discrepancies noted at the time of inspection. Technician: S. Spinks Started: 2:00 p.m. Stopped: 3:00 p.m. Renort Distribution: (I) St. Ann's Catholic Community (1} Datum Engineering. Inc. (I) Centex Construction ( 1 ) City of Coppell ( I ) City of Coppcll (I) Alliance Architects Eric J. Cleveland, P. E. Senior Project Engineer 309sds This report is exclusively for the use of the chent ~nd~cated above and shall not be reproduced ,n full without wri.'len approval of HBC Engineenng. Inc "REPORT OF DRILLE BELLED PIER INSPE, rION a division of'l~rr~lall 8901 Carpenter Frwy., Suite #10 Dallas, Texas 7524 Date of Service: 07/31/2000 Report No.: 0019844 Report Date 08/09/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled belled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached shee5 for recorded data. NOTE: See Detail 2 on Sheet 5-3.1 of contracted documents (pier details) concerning depth change. Pier 82 was backfilled on this date. Technician Time: 6:00 a.m. to 5:00 p.m. Technician: Shane Spinks ~ Engin~ Report Distribution: (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. ( 1 ) City of Coppell Senior Project Engineer ( 1 ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Pa.e 1 of I ENGINEERING, ~IC. 8901 Ca~-n~er Frwy., Suite #100 Dallas, Texas 75247 Project:St. Ann's Catholic Church Report No.: 0019844 180 Samuel Boulevard, Coppell, Texas Date of Service: 07/31/00 Project No.: 94001152 Technician: S. Spinks Driller: N.L. Schutl¢ Page: 1 of 1 Pier Identification 0-4.2 0-4.4 0-4.5 O-4.3 0.9-5.4 II Pier Diameter (in.) 30 18 18 24 24 ~ Bell Diameter (in.) 60 48 48 54 54 Top of Pier Elevation (ft) 97.0 97,0 97.0 97.0 97.0 Req. Depth from Exist. Grade (ft) 8.0 8.0 8.0 8.0 8.0 Initial Depth of Pier from Existing Grade (ft) 15.5 16.2 15.6 15.7 14.9 Final Depth of Pier from Existing Grade (ft) 15.5 16.2 15.6 15.4 14.9 Depth from Top of Concrete (ft) 15.0 15.7 15.1 14.9 14.4 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Diameter (in) N/A N/A N/A N/A N/A .) Casing Cased Depth (ft) N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 6 6 Reinforcing Bar Size (#) 7 7 7 7 7 Length of Vertical Bars (ft.) 16.0 17.0 16.1 16.0 15.5 Time Drilling was Completed 9:30 a.m. 11:00 a.m. 10:00 a.m. 11:20 a.m. 2:00 p.m. Time Concrete was Placed 3:40 p.m. 4:00 p.m. 4:20 p.m. 4:40 p.m. 5:00 p.m.