Loading...
St Ann Catholic-LR000808CONCRETE COMPR._.$SIVE STRENGTH TE . £ a divLvion ofl~rracm 8901 Carpenter Frwy., Suite #10{ Dallas, Texas 7524' Date of Service: 07/31/2000 Report No.: 0019843 Report Date 08/08/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACE.MENT DATE: 07/31/2000 BATCH TIME: 8:5 lam PLANT: 41 TIME SAMPLED: 9:45am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 86 F CONCRETE: 83 F SLL~fP: 5-7" TRUCK NO: 714 TICKET NO: 2686256 AIR: N/A AIR CON~YENT (%): N/A UNIT WEIGHT (per): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report 00019842 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: K-8.5 REPORT OF TESTS ACCL3IULATIVE YARDS: 10 CYLINDER MEASURED I~-La-XIMUM COMPRESSIVE bLa. RKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 6.25 08/07/2000 7 95990 3390 1 2 6.25 08/07/2000 7 99150 3510 Average 3450 1 3 6.25 08/28/2000 28 I 4 6.25 08/28/2000 28 Technician: Ervin Farris Started: Finished: P'~ Report Distribution: E ' ' (I) St. Ann's Catholic Community (1) Datum Engineering. Inc. (I) Centex Construction (1) CiD, of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for Ihe use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 01LL Page 1 of 1 CONCRETE COMPR._,$SIVE STRENGTH TEo £ a division 8901 Carpenter Frwy., Suite #10f Dallas, Texas 75245 Date of Service: 07/31/2000 Report No.: 0019845 Report Date 08/08/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTIL~,CTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/31/2000 BATCH TIME: N/A PLANT: 38 TIME SAMPLED: 4:15pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATItER CONDITIO.N'S: Sunny, warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 98 F COXCRET~: 97 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (c~): 2.2 UNIT WEIGIIT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and lechnician time: See Report gOO 19844 ASTM C-172 ASTM C-39 SAMPLE LOCATION: O-4.2, 0-4.4, 0-4.5 REPORT OF TESTS ACCm-WLATIVE YAm S: 10 CYLINDER MEASURED MAXLMUM COMPRESSIVE 3LARKED SLUMP DATE AGE LOAD STRENGTII FIL4,CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 4.75 08/07/2000 7 86920 3070 I 2 4.75 08/07/2000 7 88770 3140 Average 3110 I 3 4.75 08/28/2000 28 1 4 4.75 08/28/2000 28 Technician: Shane Spinks Started: Finished: IJ~ gine~~ Report Distribution: En ' . (I) St. Ann's Catholic Community ( 1 ) Datum Engineering. Inc. (I) Centex Construction (I) Ci~' of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TEb .' ENGL\IEF, RhNG, INC. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/28/2000 Report No.: 0019679 Report Date 08/08/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTILACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/28/2000 BATCH TIME: 8:58am PLANT: 43 TIME SAMPLED: 9:40am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEAl'It]ER CONDITIONS: Clear STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 91 F CONCRETE: 86 F SLUMP: 5-7" TRUCK NO: 644 TICKET NO: 2694938 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGItT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: Sec Report #0019678 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B-4.7 REPORT OF TESTS ACCUMULATIVE YARDS: l0 CYLINDER MEASURED MAXLMUM COMPRESSIVE I~L&RKED SLU.%IP DATE AGE LOAD STRENGTIt FILa. CTLIRE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.50 08/04/2000 7 66380 2350 1 2 6.50 08/04/2000 7 78250 2770 Average 2560 I 3 6.50 08/25/2000 28 I 4 6.50 08/25/2000 28 Report Distribution: jlE'~~~pE C. (1) St. Ann's Catholic Community ( 1 ) Datum Engineering. Inc. (1) Centex Construction (1) CiLv of Coppell Eric (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPRL3SIVE STRENGTH TEL 2 a division of ~lrl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/28/2000 Report No.: 0019708 Report Date 08/08/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PL.&CEMENT DATE: 07/28/2000 BATCIITIME: N/A PLANT: N/A TI.MESAMPLED: 4:00pm l~V: Shane Spinks SPECIFICATION REQUIREMENTS WEATHER CONOITIONS: Sunny, warm STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 95 F CONCRETE: 93 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 2. I UNIT WEIGI1T (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCL.~,IULATIVE YARDS: 10 CYLINI)ER MEASURED MA XIMLBI COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.25 08/04/2000 7 103340 3650 I 2 4.25 08/04/2000 7 102000 3610 Average 3630 1 3 4.25 08/25/2000 28 I 4 4.25 08/25/2000 28 Sample location: 0-3.1, 0-3.2, 0-3.4, 0-3.5, 0-3.6, 0-5.8, 0-3.9 Technician: ShaneSpinks Started: 3:00pm Finished: 5:00pm I-J~~n~ Report Distribution: (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. ( 1 ) Centex Construction ( 1 ) City of Coppell Eric'JT. Cleveland, P.E. (1) City of Coppell Senior Project Engineer ( I ) Alliance ArchitecLs This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wrilten approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPRI.oSIVE STRENGTH TEL .' ENGI.\~, l. bE. a division of'l~m'mmn 8901 Carpenter Frwy., Suite #I00 Dallas, Texas 75247 Date of Service: 07/27/2000 Report No.: 0019598 Report Date 08/08/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/27/2000 BATCIITIME: 3:45pm PLANT: 31 TIME SAMPLED: 4:30pm BY: Shane Spinks SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Sunny, cool STRENGTIt: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 102 F CONCRETE: 98 F SLUMP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.9 UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C-143 PLACEMENrF LOCATION: Piers ASTM C-172 ASTM C-39 SAMPLE LOCATION: 0.9-3.2, 0.9-3.4, 0.9-3.5.0.9-3.6 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED ,~La. XIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FI~CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 08/03/2000 7 90450 3200 1 2 5.25 08/03/2000 7 96360 3410 Average 3310 1 3 5.25 08/24/2000 28 I 4 5.25 08/24/2000 28 Technician: Shane Spinks Started: 4:00pm Finished: 6:30pm ~ ~n Report Distribution: ~ C. (I) St. Ann's Catholic Community (i) Datum Engineering. Inc. (1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. ( 1 ) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 CONCRETE COMPRLJSIVE STRENGTH TEL/ ENGhN~_~R~NG, INC. a division oflFarrm:~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/27/2000 Report No.: 0019572 Report Date 08/08/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Cer~tex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT OATE: 07/27/2000 hATCH TIME: 9:02am PLANT: 43 TIME SAMPLED: 9:40am ny: Ervin Fan-is SPECIFICATION REQUIREMENTS WEATHER CO~'OITIONS: Cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATVRE(F)-AIR 88 F CONCRETE: 83 F SLt~m: 5-7" TRUC~ NO: 837 TIC,rET NO: 2693683 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGIIT (pct'): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report gOO 19521 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: B-4.5 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED ,MA XL~UL~-I COMPRESSIVE MARKED SLUI~IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 6.00 08/03/2000 7 78180 2760 I 2 6.00 08/03/2000 7 82040 2900 Average 2830 1 3 6.00 08/24/2000 28 1 4 6.00 08/24/2000 28 Technician: Ervin Farris Started: Finished: ~ ~ Report Distribution: E . (1) st. Ann's Catholic Community (I) Datum Engineering, [nc. ( I ) Centex Construction ( I ) City of Coppcll Eric E'Cleveland, P.E. (I) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 01LL Page 1 of I CONCRETE COMPRE- SIVE STRENGTH TES. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/10/2000 Report No.: 0017869 Report Date 08/08/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/10/2000 BATCH TIME: 12:30pm PLAN"r: 41 m~m SAMPLED: 1:05pm BY: Ervin Farris SPECIFICATION REQUIREMENTS WF~axTHER CONDITIONS: Clear STRENOT)I: 3000 psi @ 28 Days TEMPEILs, TURE (F)- AIR 93 F CONCRETE: 89 F SLUMP: 5-7" TRUCK NO: 368 TICKET NO: 2678643 AIR: N/A AIR coh~rE,'vr (%): N/A UNIT WEIGIlT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMEN"r LOCATION: Piers ASTM C-172 ASTM C-39 Technician Time: See Report ,gOO 17868 SAMPLE LOCATION: 16-C REPORT OF TESTS ACCU31ULATIVE YARDS: 10 CYLINDER MEASURED MAXLML~-i COMPRESSIVE ~L.~RKED SLUbIP DATE AGE LOAD STRENGTH FIL&CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.50 07/17/2000 7 84240 2980 I 2 6.50 07/17/2000 7 83270 2940 Average 2960 1 3 6.50 08/07/2000 28 122820 4340 I 4 6.50 08/07/2000 28 130670 4620 Average 4480 Technician:Report Distribution:Ervin Fan'is Started: Finished: IJ~ En~. (I) St. Ann's Catholic Cormnunity ( 1 ) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer ( 1 ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of I