St Ann Catholic-LR000807REPORT OF REINFORCING STEEL INSPECTION
F. NGLNEERJNG, INC.
$901 Carpenter Fm-y., Suia= #100
Dallas. Texas 75247
Date of Service: 08/07/00 Report No.: 0020526
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
180 Samuel Boulevard 180 Samuel Boulevard
Coppell, Texas 75019 Coppell, Texas
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: On-site Drawings
Locations/Items Inspected: Basement Wall, line G, lines 10 to 17
Test Method: Visual Observation
REPORT OF INSPECTION
ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT
Plating Drawings Approved X Bar Length and Shape X Column Tied Properly
Bar Size X Proper Bar Placement X Ties and Spaces
Bar Grade X Properly Trod X Sbrrup Spacing/Type
Rebar Clean X Dowel Bars in Place X Welded Splices
Form Clean X Proper Bar Supports X Mechanical Sphces
Number of Bars X Lapped Splices X Proper Cover X
Discrepancies/Comments: No discrepancies noted at the time of inspection.
Technician: E. Fan'is Started: 1:00 p.m. Stopped: 4:00 p.m.
Renort Distribution: ~I'-I~"l~ngineering'
Inc.
( 1 ) St. Ann's Catholic Community ( 1 ) Datum Engineering. Inc. ~~~'~ !
(1) Centex Construction ( I ) Cit3' of Coppell
(I) City of Coppell
(i) Alliance Architects and, P. E.
Senior Project Engineer
309sds This repo~ is exclusively for the use of the clie~qt indicated above and shall not be reproduced in full w~thout written approval of HBC Engineering. Inc.