Loading...
St Ann Catholic-LR000803REPORT OF REINFORCING STEEL INSPECTION 8901 Carpenter Frwy., Suite ~100 Dallas. Texas 75247 Date of Service: 08/03/00 Report No.: 0020247 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church 180 Samuel Boulevard 180 Samuel Boulevard Coppell, Texas 75019 Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Structural Locations/Items Inspected: Grade Beam, lines E to F and 16 to 20 Test Method: Visual Observation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT Placang Drawings Approved X Bar Length and Shape X Column T~ed Proper:y Bar S~ze X Proper Bar Placement X Ties and Spaces X Bar Grade X Properly Tied X Sbrrup Spacing[Type X Rebar Clean X Dowel Bars in Place X Welded Splices Form Clean X Proper Bar Supports X Mechanical Sphces Number of Bars X Lapped Sphces X Proper Cover X Discrepancies/Comments: No discrepancies noted at the time of inspection. Technician: S. Spinks stanza: See Report #0020228 Reoort Distribution: ' ' ' Inc. ( I ) St. Ann's Catholic Community (1) Datum Engineering, Inc. ~~ ( 1 ) Centex Construction ( I ) City of Coppell ( 1 ) City of Coppell (1) Alliance Architects Eric J. Cleveland, P. E. Senior Project Engineer 309sds This report is exclusively for the use of the c~mnt indicated above and shall not be reproduced in full w~thout wnRen appreva of HBC Engineering, Inc. oNCRETE COMPRESSIVE STRENGTH TES2_'. a divi. tion 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/26/2000 Report No.: 0019446 Report Date 08/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTIL~CTOR: Centex Construction MIX I.D.: N/A CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/26/2000 BATCIITIME: N/A PLANT: 38 TIME SAMPLED: 3:00pm sY: Shane Spinks SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 101 F CONCRETE: 97 F SLL~IP: 3-5" TRUCK NO: N/A TICKET NO: N/A AIR: N/A AIR CONTENT (%): 1.9 UNIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers under water fountain area ASTM C-172 ASTM C-39 SAMPLE LOCATION: J-4. I-d.. SE, l-d. S. J-4 SW REPORT OF TESTS ACCL31ULATIVEYARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt Ftk-~CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.75 08/02/2000 7 97590 3450 I 2 4.75 08/02/2000 7 94840 3350 Average 3400 1 3 4.75 08/23/2000 28 I 4 4.75 08/23/2000 28 Technician: Shane Spinks Started: 2:00pm Finished: 4:00pm //~i~ng Report Distribution: ineering, Inc. (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (1) City of Coppell ~ ~r_ic .J. C_leveland, P.E. ( I } City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of I CONCRETE COMPRESSIVE STRENGTH TES. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/26/2000 Report No.: 0019431 Report Date 08/03/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPI.IER: TXI PLACEMENT DATE: 07/26/2000 BATCh TLXIE: 8:47am PLANq': 41 TIME SAMPLED: 9:26am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER co,xa)rrloNS: Cloudy STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 91 r CONCRETE: 87 F SLUMP: 5-7" TRUCKNO: 453 TICKETNO: 2692292 AIR: N/A AIR CONTENI (%): N/A UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMEN'r LOCATION: Pier information and technician time: Sce Report g0019430 ASTM C-172 ASTM C-39 SAMPLE LOCATION: E.5-8.5 REPORT OF TESTS ACCUMULATIVE Y.A mS: 10 CYLINDER MEASURED MAXhMUM COMPRESSIVE MARKED SLU3IP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.25 08/02/2000 7 93630 3310 1 2 6.25 08/02/2000 7 89840 3180 Average 3250 1 3 6.25 08/23/2000 28 1 4 6.25 08/23/2000 28 Technician: Ervin Fan-is Started: Finished: Report Distribution: ineerinv, Inc. (!) St. Ann's Catholic Communi~' (1) Datum Engineering. Inc. (l) Centex Construction (l)City of Coppcll v /t Eric J. Cleveland, P.E. (i) City of Coppell { Sen'mr Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1 CONCRETE COMPRE .$IVE STRENGTH TES ENGL\'EERLNG, INC. a division 8901 Ca.enter Frwy., Suite D~I~, Tex~ 75~7 Date of Service: 07/18/2~0 Report No.: 0018668 Report Date 08/03/2~0 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRA. CTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/18/2000 BATCII TI3,1E: 9:23am PLANT: 41 TIME SAMPLED: 10:30m Rv: Ervin Fan-is SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRESOTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 96 F CONCRETE: 91 F SLtrMP: 5.0" Max TRUCK SO: 453 TICKET NO: 2685351 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report ;"0018667 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: K- 15 REPORT OF TESTS ACCU. ULATiVE YA .OS: I0 CYLINDER MEASURED MAXLML~! COMPRESSIVE g£~RKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE ! 1 7.00 07/25/2000 7 83120 2940 1 2 7.00 07/25/2000 7 86910 3070 Average 3010 I 3 7.00 08/15/2000 28 I 4 7.00 08/15/2000 28 Technician: Ervin Farris Started: Finished: J l,~~' ~ Report Distribution: ~';lneering, Inc. (I) St. Ann's Catholic Community (I) Datum Engineering. Inc. ( I ) Centex Construction ( I ) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of 1