Loading...
St Ann Catholic-LR000802CONCRETE COMPRE ,SIVE STRENGTH TES · ENGL\'EERLNIG, INC. a division of]~'~Zl:lll 891}1 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/25/2000 Report No.: 0019315 Report Date 08/02/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell? Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PL.nCEMENT DATE: 07/25/2000 i~ATCn TI.X~E: 9:25am PLANT: 41 TIME SAMPLED: 10:10am BY: Ervin Farris SPECIFICATION REQUIREMI.;NTS WEATHER CONDITIONS: Cloudy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)-.aIR 87 F CO~'CRETE: 83 F SL~q~iP: 5-7" TRUCK NO: 716 TICKET NO: 2691109 AIR: N/A AIR CONTENT (ek): N/A UNIT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Pier information and technician time: See Report #0019314 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: X-8.1 REPORT OF TESTS ACCI.~CCLATIVE YARDS: l0 CYLINDER MEASURED MAXIML..-M COMPRESSIVE M-.~.RKED SLU3,IP DATE AGE LOAD STRENGTII FIL~CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.00 08/01/2000 7 103660 3670 1 2 6.00 08/01/2000 7 107480 3800 Average 3740 I 3 6.00 08/22/2000 28 I 4 6.00 08/22/2000 28 Technician: Ervin Farris Started: Finished: ~;~.~g. . Report Distribution: lneerln,g~, Inc. (I) st_ Ann's Catholic Community (I) Datum Engineering. Inc. (I) Centex Construction (I) City of Coppcll Eric J. Cleveland, P.E. (I) City of Coppcll Senior Project Engineer ( I ) Alliance Architects This report is exclusively for thc use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1 REPORT OF DRILLEL 3ELLED PIER INSPEC -ION ENGL\'EERLNG, IN~ a division ofl~'g"~lJ~l 8901 Carpenter Frwy., Suite #100 Dallas, Texas ?5247 Date of Service: 07/26/2000 Report No.: 0019445 Report Date 08/02/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled belled pier inspec--_icn. On this date, an HBC Engineering technician arrived at nhe above referenced jobsite as sckedu!ed for drilled be21ed pier inspection. See annached skeen for recorded data. Technician Time: 6:00 a.m. to 2:00 p.m. Technician: Shane Spinks /~~~gineering, Inc. Report Distribution: (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. ( 1 ) Centex Construction ( 1 ) City of Coppell -- Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of H BC Enginecring, Inc. 99SDS Pa~e 1 of 1 REPORT OF DRILLED BELLED PIERS -- ENG~'EERING, INC. 8901 Caq~en~er Frv. y. Suite s~I00 Dallas. Texas 75247 Project: St. Ann's Catholic Church Report No.: 0019445 180 Samuel Boulevard, Coppell, Texas Date of Service: 07/26/00 Project No.: 94001152 Technician: S. Spinks Driller: Schutte Page: ] of 1 Pier Identification I-4 I-4/SE 1.4/S 1.4/SW I-4/NE I-4/N I-4/NW I-4/W I-4/E 0.9-3.1 Pier Diameter (in.) 24 18 18 18 18 18 18 18 18 24 Bell Diameter (in.) 54 48 48 48 48 48 48 48 48 54 Top of Pier Elevation (ft) 97.0 97.0 97.0 97.0 97.0 97.0 97.0 97,0 97.0 97.0 Req. Depth from Exist. Grade (ft) 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 Initial Depth of Pier from Existing Grade (ft) 16.5 14.0 14.9 15.0 15.9 16.8 17.5 16.4 14.0 17.9 Final Depth of Pier from Existing Grade (ft) 16.8 14.4 15,2 15.3 16.2 17.2 17.6 16.7 14.3 17.9 Depth from Top of Concrete (ft) 17.5 15.0 16.0 16.0 17.0 18.0 18.0 17.0 15.0 18.5 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Cased Depth (ft) N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Number of Vertical Bars (ea.) 5 5 5 5 5 5 5 5 5 5 Reinforcing Bar Size (#) 7 7 7 7 7 7 7 7 7 7 Length of Vertical Bars (ft.) 14.5 12.5 13.2 13.3 14.2 15.2 15.6 14.7 12.3 15.9 Time Drilling was Completed 11:45a.m. 11:55a.m. 12:10p,m. 12:20p.m. 12:30p.m. 12:40p.m. 12:50p.m. 1:00p.m. 1:10p.m. 1:40p.m. Time Concrete was Placed 2:10 p.m. 2:25 p.m. 2:40 p.m. 3:00 p.m. 3:15 p.m. 3:20 p.m. 3:40p.m. 4:00 p.m. 4:10 p.m. 4:35 p.m.