Loading...
St Ann Catholic-LR000801REPORT OF REINFORCING STEEL INSPECTION ENGINEERING, hNC. 8901 Carpenter Frv,.y., Suite Dallas, Texas 75247 Date of Service: 08/01/00 Report No.: 0019994 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church 180 Samuel Boulevard 180 Samuel Boulevard Coppell, Texas 7:5019 Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Structural Locations/Items Inspected: Grade Beam, lines C to D and 16 to 20 Test Method: Visual Observation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tied Properly Bar Size X Proper Bar Placement X Ties and Spaces X 8ar Grade X Properly Tied X Stirrup Spacing/Type X Rebar Clean X Dowel Bars in Place X Welded Splices Fo~m Clean X Proper Bar Supports X Mechanical Sphces Number of Bars X Lapped Spl,ces X Proper Cover X Discrepancies/Comments: No discrepancies noted at the time of inspection. Technician: S. Spinks Started: See Report #0019977 ~ Engineering, Inc. Reoort Distribution: (I) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (I) City of Coppell (1) City of Coppell (I) Alliance Architects Eric J. Cleveland, P. E. Senior Project Engineer 309sd$ This report ~s exclusively for the use of the client indicated above and shall not be ref:~'oduced in full wdhout written approval of HBC Engineering. Inc. CONCRETE COMPRE::,SIVE STRENGTH TES. ENGL\~EERLNG, INC. a division of l~'f-~lfl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/13/2000 Report No.: 0018273 Report Date 08/01/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 9506 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 07/13/2000 BATCIIXIME: 9:14am PLANT: 41 TIME SAMPLED: 9:50am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 91 ~: CONCRETE: 86 F SLI.~,'MP: 5-7" TRUCK NO: 451 TICKET NO: 2681690 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Pier information and technician time: See Report g0018272 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 20-F.9 REPORT OF TESTS A¢Ct,, IULATIVE YARDS: 20 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLL$IP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.75 07/20/2000 7 79180 2800 I 2 6.75 07/20/2000 7 83460 2950 Average 2880 I 3 6.75 08/10/2000 28 1 4 6.75 08/10/2000 28 Technician: Ervin Farris Started: Finished: Report Distribution: eering, Inc. ( 1 ) St. Ann's Catholic Communib, (1) Datum Engineering, Inc. J. Cleveland, P.E. (1) Centex Construction ( 1 ) City of Coppell ~-- ~Eric . (1) city of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1