St Ann Catholic-LR000728CONCRETE COMPRESSIVE STRENGTH TES'
ENGI_I2qEERLNG, 1NC.
a division of'lr~rr~l~fl
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 07/20/2000 Report No.: 0018903 Report Date
07/28/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 9506
CONCRETESUPPIAER: TXI PLACEMENT DATE: 07/20/2000 I~ATCnTIME: 8:17am
I'I.ANT: 41 TIME SAMPLED: 8:50am BY: Ervin Farris
SI'ECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear
STRE.XaTI~: 3000 psi @ 28 Days TE.XW~RATt..'aE (F)- AIR 91 ~' COXCRETE: 87 V
Skt.-:MP: 5-7" T~tVCKXO: 802 T~C~:ETXO: 2687582
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Pier information and technician time: See Report gOO 18902
ASTM C-172
ASTM C-39
SAMPI.E LOCATION: M-19
REPORT OF TESTS ACCt*IVLATIVEYARDS: 10
CYLINDER MEASURED MAXD, IUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I 1 7.00 07/27/2000 7 96430 3410
I 2 7.00 07/27/2000 7 97240 3440
Average 3430
1 3 7.00 08/17/2000 28
1 4 7.00 08/17/2000 28
Technician: Ervin Farris Started: Finished: ~~~ngin
Report Distribution: eering, Inc.
(I) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(1) Centex Construction (1) CiB' of Coppell ~ ~ Eric J. Cleveland, P E
( I ) City of Coppell Senior Project Engineer
( I ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of I