Loading...
St Ann Catholic-LR000725CONCRETE COMPRE,_,SIVE STRENGTH TES. E N~L\~E ERk',iG, INC. a division ofl[atrac~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/14/2000 Report No.: 0018375 Report Date 07/25/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell. Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction .xnxLt~.: 9506 CoNcmrTESt;Pl'I,IER: TXI PI,ACEMENTDATF,: 07/14/2000 }~A'rCHTIME: 8:28am PLANT: 4 1 TIME SAMPLED: 9; 15am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATHER CONmTIONS: Clear STREN(;T}I: 3000 psi @ 28 Days TEMPERAII~'RE (F)- AIR 96 ~' CONCRETE: 89 r SI.UMP: 5-7" TRUCK NO: 716 TICKET NO: 2682954 AIR: N/A AIR CONTENT {%): N/A UNIT WEIGIIT {pcl): N/A TEST METnO[~: ASTM C-143 PLACEMEN~I' LOCATION: Pier information and technician time: See Report #0018374 ASTM C- 172 ASTM C-39 SAMI'LE LOCATION: 17.7-Q REPORT OF TESTS ACCC~WLATlVE YaU,>S: 10 CYLINDER MEASURED 5LAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.75 07/21/2000 7 92030 3250 1 2 5.75 07/21/2000 7 86680 3070 Average 3160 I 3 5.75 08/11/2000 28 1 4 5.75 08/11/2000 28 Technician: Ervin Farris Started: Finished: /l~i~~ineering, Inc. Report Distribution: ( I ) St. Ann's Catholic Community (1) Datum Engineering. Inc. (I) Centex Construction (I) City of Coppell [CJ. Cleveland, P.E. ( I ) City of Coppell Senior Project Engineer ( I ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. ()II~L Page 1 of 1 CONCRETE COMPRESSIVE STRENGTH TES_ ENGL\'EERD~, LNC. a divixion 8901 Carpenter Frwy. Suite #100 Dallas, Texas 75247 Date of Service: 07/17/2000 Report No.: 0018563 Report Date 07/25/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Nlonsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.!).: 9506 CONCRETE SUPPI.IER: TXI PLACEMENT DATE: 07/17/2000 ~A'rcn TIME: 8:36am lq. ANT: 41 TIME SAMPLED: 9:25am aY: Ervin Farris SPECIFICATION REQUIREMENTS ;VEATIIER CONDrrIONS: Clear STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 87 r CO.~Cl~E'I'E: 90 }' SLUMP: 5-7" TRUCKNO: 836 TICKETXO: 2684118 AIR: N]A AIR CONTENT (t~): N/A UNIT WEIGht (pet): N/A TEST METIIOI): ASTM C- 143 PLACEMENT LOCATION': Pier information and technician time: Sec Report #0018562 ASTM C- 172 ASTM C-39 SAMI'LE LOCATION: 1-20.4 REPORT OF TESTS ACCUMUldtTIVE¥?,RDS: 10 CYLINI)ER MEASURED MAXBIUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 6.50 07/24/2000 7 97060 3430 I 2 6.50 07/24/2000 7 95260 3370 Average 3400 I 3 6.50 08/14/2000 28 I 4 6.50 08/14/2000 28 Technician: Ervin Farris Started: Finished: / ~-"~neering, Inc. Report Distribution: (I) St. Ann's Catholic Community (I) Datum Engineering. Inc. (I)CentexConstruction (I)CiL~ of Coppcl[ t./ - Erie J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer { 1 ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of 1