St Ann Catholic-LR000725CONCRETE COMPRE,_,SIVE STRENGTH TES.
E N~L\~E ERk',iG, INC.
a division ofl[atrac~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 07/14/2000 Report No.: 0018375 Report Date
07/25/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell. Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction .xnxLt~.: 9506
CoNcmrTESt;Pl'I,IER: TXI PI,ACEMENTDATF,: 07/14/2000 }~A'rCHTIME: 8:28am
PLANT: 4 1 TIME SAMPLED: 9; 15am BY: Ervin Farris
SPECIFICATION REQUIREMENTS WEATHER CONmTIONS: Clear
STREN(;T}I: 3000 psi @ 28 Days TEMPERAII~'RE (F)- AIR 96 ~' CONCRETE: 89 r
SI.UMP: 5-7" TRUCK NO: 716 TICKET NO: 2682954
AIR: N/A AIR CONTENT {%): N/A UNIT WEIGIIT {pcl): N/A
TEST METnO[~: ASTM C-143 PLACEMEN~I' LOCATION:
Pier information and technician time: See Report #0018374
ASTM C- 172
ASTM C-39
SAMI'LE LOCATION: 17.7-Q
REPORT OF TESTS ACCC~WLATlVE YaU,>S: 10
CYLINDER MEASURED 5LAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.75 07/21/2000 7 92030 3250
1 2 5.75 07/21/2000 7 86680 3070
Average 3160
I 3 5.75 08/11/2000 28
1 4 5.75 08/11/2000 28
Technician: Ervin Farris Started: Finished: /l~i~~ineering, Inc.
Report Distribution:
( I ) St. Ann's Catholic Community (1) Datum Engineering. Inc.
(I) Centex Construction (I) City of Coppell [CJ. Cleveland, P.E.
( I ) City of Coppell Senior Project Engineer
( I ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
()II~L Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TES_
ENGL\'EERD~, LNC.
a divixion
8901 Carpenter Frwy. Suite #100
Dallas, Texas 75247
Date of Service: 07/17/2000 Report No.: 0018563 Report Date
07/25/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Nlonsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.!).: 9506
CONCRETE SUPPI.IER: TXI PLACEMENT DATE: 07/17/2000 ~A'rcn TIME: 8:36am
lq. ANT: 41 TIME SAMPLED: 9:25am aY: Ervin Farris
SPECIFICATION REQUIREMENTS ;VEATIIER CONDrrIONS: Clear
STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 87 r CO.~Cl~E'I'E: 90 }'
SLUMP: 5-7" TRUCKNO: 836 TICKETXO: 2684118
AIR: N]A AIR CONTENT (t~): N/A UNIT WEIGht (pet): N/A
TEST METIIOI): ASTM C- 143 PLACEMENT LOCATION':
Pier information and technician time: Sec Report #0018562
ASTM C- 172
ASTM C-39
SAMI'LE LOCATION: 1-20.4
REPORT OF TESTS ACCUMUldtTIVE¥?,RDS: 10
CYLINI)ER MEASURED MAXBIUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTIt FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 6.50 07/24/2000 7 97060 3430
I 2 6.50 07/24/2000 7 95260 3370
Average 3400
I 3 6.50 08/14/2000 28
I 4 6.50 08/14/2000 28
Technician: Ervin Farris Started: Finished: / ~-"~neering,
Inc.
Report Distribution:
(I) St. Ann's Catholic Community (I) Datum Engineering. Inc.
(I)CentexConstruction (I)CiL~ of Coppcl[ t./ - Erie J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
{ 1 ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1