Loading...
St Ann Catholic-LR000719CONCRETE COMPRE ,SIVE STRENGTH TES ,. ENGL\~EREqG, INC. a division 8901 Carpeuter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/11/2000 Report No.: 0018020 Report Date 07/19/2000 Client No.: 2310 Project No,: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTIL-~,CTOR: Centex Construction MIX I.D.: 9506 CONCRETESCl'PLIER: TXI PLACEMENTD:XTE: 07/11/2000 BATCH TLXIE: 8:36am PLANT: 41 TI.MESAMPI.I:.D: 9:00am BY: Ervin Farris SPECIFICATION REQUIREMENTS WEATIlER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEMPEIL&TURE (F)-.AIR 89 F CONCRETE: 84 F SLUMP: 5-7" TRUCK NO: 835 TICKET NO: 2679354 AIR: N/A aiR CONTENT (~): N/A UNIT WEIGHT (pcl): N/A TEST METIIOI): ASTM C- 143 PLACEMENT LOCATION: Piers- See Report g0018019 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 2 I-G.9 REPORT OF TESTS ACCL~IULATIVE YARDS: 20 CYLINDER MEASURED 5LAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FIL-XCTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 6.00 07/18/2000 7 112680 3980 I 2 6.00 07/18/2000 7 115050 4070 Average 4030 I 3 6.00 08/08/2000 28 1 4 6.00 08/08/2000 28 Technician: Ervin Farris Started: N/A Finished: N/A ///t-l~~gi Report Distribution: neerin~,g Inc. (1) St. Ann's Catholic Community (I) Datum Engineering. Inc. (1) Centex Construction (I) City of Coppell ~ Eric J. Cle ~ eland, P E (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of 1 REPORT OF DRILLED .JIER INSPECTION ENGLNEERING, LNC. o division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/11/2000 Report No.: 0018019 Report Date 07/19/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Drilled pier inspection. On this date, an HBC Engineering technician arrived at %he above referenced jobsite as scheduled for drilled pier inspection. See attached skeet for recorded data. Technician Time: 6:00 a.m. to 6:00 p.m. Technician: Ervin Farris ~ring, Inc. Report Distribution: (1) St. Ann's Catholic Community (I) Datum Engineering. Inc. (1) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (I) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 99Di' Pat~e 1 of 1 REPORT OF DRILLED PIERS ENGINEERING, INC. 8901 Caroemer Fnw.. Suite 100 Dallas, Texas 75247 Project:St. Ann's Catholic Church Report No.: 0018019 180 Samuel Boulevard, Coppell, Texas Date of Service: 07/11/00 Project No.: 94001152 Technician: E. Farris Driller: Page: I of I Pier Identification 21-G.9 20-C 20-D 20-E 9.1-M.5 10.5-M.5 20-F Pier Diameter (in.) 24 24 24 24 24 24 24 Top of Ground Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.) N/A N/A N/A N/A N/A N/A N/A Depth to Bearing Stratum from Ground (ft.) 47.0 44.0 46.0 46.0 36.0 35.0 45.83 Depth of Pier from Ground (ft.) 54.33 55.0 52.5 52.83 48.83 47.66 53.0 Required Penetration (ft.) 6 9 6 6 12 12 6 Actual Penetration (ft.) 7.33 11.0 6.5 6.83 12.83 12.66 6.18 Depth from Top of Concrete (ft.) 53.5 55.0 52.0 52.0 48.42 47.18 52.0 Condition of Bottom (wet or dry) Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes Yes Yes Yes Yes Casing Diameter (in.) 26 26 26 26 26 26 26 Cased Depth (ft.) 45 45 45 45 33.83 33.83 45 Number of Vertical Bars (ea.) 6 6 6 6 6 6 6 Reinforcing Bar Size (#) 6 6 6 6 6 6 6 Length of Vertical Bars (ft.) 52.75 58.42 51.18 51.5 47.83 46.75 51.5 Time Drilling was Completed 8:03 a.m. 8:05 a.m. 11:42 a.m. 12:15 p.m. 11:18 a.m. 1:50 p.m. 3:08 p.m. Time Concrete was Placed 9:18 a.m. 8:55 a.m. 12:52 p.m. 1:29 p.m. 12:18 p.m. 3:00 p.m. 5:00 p.m. CONCRETE COMPRESSIVE STRENGTH TES'. ENGL\rEERLNG, ~ a division of'][l~ff-'~lJ:gl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/20/2000 Report No.: 0016150 Report Date 07/19/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 06/20/2000 I~A'rCU TI.ME: 11:30am PLANT: 31 TIME SAMPLED: 12:30pm BY: Barry Cuble SPECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Sunny, warm STRENGTll: 3000 psi @ 28 Days TEMPERATURE(F)- AIR 84 F CONCRETE: 94 V SLLB-IP: 2-4" TRUCK NO: 366 TICKET NO: 2663222 AIR: 3-6% AIR CONTENT (%): 4.2 UNIT WEIGIIT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Paving: N fire lane ASTM C-172 ASTM C-39 SAMPLE LOCATION: 15' W of E, 15' N of S curb REPORT OF TESTS ACCUMULATIVE YARDS: 60 CYLINDER MEASURED MAXIMUM COY. IPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.75 06/27/2000 7 101550 3590 I 2 4.75 06/27/2000 7 102090 3610 Average 3600 1 3 4.75 07/18/2000 28 136910 4840 1 4 4.75 07/18/2000 28 136260 4820 Average 4830 Technician: Barry Cuble Started: l l:30am Finished: l:30pm ~_~~ngi Report Distribution: neering, Inc. (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (1) Centex Construction (1) City of Coppell v ~. - E~ic J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer { 1 ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page I of 1