St Ann Catholic-LR000718REPORT OF DRILLEL ?IER INSPECTION
ENGINEERkNG, INC.
a division of
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Sern, ice: 07/10/2000 Report No.: 0017868 Report Date
07/18/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services:
On this ~aze, an [~5.~ Enq.[.neerin.[ ~e?_n2. rian arrive~ at zhe abcve reference~
5cbsize as sske~uleJ for ~rille~ ~er ~_ns~ection. See attacked skee5 for
reccrded ~at~.
Technician Time: 6:00 a.m. zc 6:CC c.rt.
Report Distribution:
(1) St. Ann's Catholic Community (1) Datum Engineering. Inc.
I,l ) Centex Construction I. I ) City of Copp¢ll ' Eric J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99DP Page ! of 1