St Ann Catholic-LR000713i ONCRETE COMPRESSIVE STRENGTH TES.
ENGL\'EERING, INC.
a division qf~t"~lJafl
8901 Carpenter Frwy., Suite #100
Dallas, Texas 752-17
Date of Service: 06/12/2000 Report No.: 0015460 Report Date
07/13/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
ARm Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 8273
CONCRETE SL'PPLIER: TXI PL:XCEMF. NT DATE: 06/13/2000 I~ATCH TIME: 8:28am
PLANT: 41 TIME SAMPLED: 9:04am BY: Marlo Garcia
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool
STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 81 F CONCRETE: 87 F
SLUMP: 3-5" TRUCKNO: 450 TICKETNO: 2658808
AIR: 3.5-6.5% AIR EONTENT (%): N/A V~,'IT WEIGHT (pcf): N/A
TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION:
Paving-See attached sketch
ASTM C- 172
ASTM C-39
SAMPLE I.OCATION: See placement location
REPORT OF TESTS ACCUMULATIVE YARNS: 140
CYLINDER MEASURED MAXLMUM COMPRESSIVE
MARKED SLL~,-IP DATE AGE LOAD STRENGTII FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
I I 5.50 06/20/2000 7 109530 3870
I 2 5.50 06/20/2000 7 106690 3770
Average 3820
I 3 5.50 07/11/2000 28 149760 5300
1 4 5.50 07/11/2000 28 144430 5110
Average 5210
Technician: MarioGarcia Started: 8:00am Finished: 10:30am ~~~gi~
Inc.
Report Distribution: er_n,,,,
( 1 ) St. Ann's Catholic Community ( I ) Datum Engineering. Inc.
( I ) Centex Construction (I) City of Coppell t.,~,,,,- Eric""I. Cleveland, P.E.
( 1 ) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc.
0ILL Page 1 of 1
CONCRETE COMPREoSIVE STRENGTH TES.
ENGL\'EERLN~, INC.
a division of
8901 Carpenter Frwy., Suite #100
Dallas, Texas
Date of Service: 06/14/2000 Report No.: 0015599 Report Date
07/13/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction .MIX I.D.: 8272
CONCRETE SUPPLIER: TXI PI,ACEMENT DATE: 06/14/2000 BATCII TIME: 8:25am
PLANT: 41 TIME SAMPLED: 8:56am BY: Eric Garcia
SPECIFICATION REQUIRE_MEN'TS WEATllER CON'DITIONS: Light rain
STRENGTII: 3500 psi @ 28 Days TEMPEP, ATURE(F)- AIR 78 F CONCRETE: 90 F
SLUMP: 4-6" Tm'CK NO: 38 TICKET NO: 2659811
AIR: N/A AIR CONTENT (q¢): N/A C'NIT WEIGHT (pcf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Paving SW of shopping center
ASTM C-172
ASTM C-39
SAMPLE LOCATION: Paving 120' E of Samuel Blvd.
REPORT OF TESTS ACCUMULATIVE YARDS: 1 10
CYLINDER MEASURED MAX~-IUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTII FP~.XCTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 5.00 06/21/2000 7 108930 3850
I 2 5.00 06/21/2000 7 105240 3720
Average 3790
I 3 5.00 07/12/2000 28 143970 5090
I 4 5.00 07/12/2000 28 140250 4960
Average 5030
Technician: Eric Garcia Started: 5:00am Finished: 7:30am ~~e
Report Distribution: ering, Inc.
(1) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(1) Centex Construction (I) City of Coppell ' r"'"~"C"~ri~ J. Cleveland, P.E.
(1) City of Coppell Senior Project Engineer
(1) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of I