Loading...
St Ann Catholic-LR000713i ONCRETE COMPRESSIVE STRENGTH TES. ENGL\'EERING, INC. a division qf~t"~lJafl 8901 Carpenter Frwy., Suite #100 Dallas, Texas 752-17 Date of Service: 06/12/2000 Report No.: 0015460 Report Date 07/13/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church ARm Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction MIX I.D.: 8273 CONCRETE SL'PPLIER: TXI PL:XCEMF. NT DATE: 06/13/2000 I~ATCH TIME: 8:28am PLANT: 41 TIME SAMPLED: 9:04am BY: Marlo Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Cool STRENGTII: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 81 F CONCRETE: 87 F SLUMP: 3-5" TRUCKNO: 450 TICKETNO: 2658808 AIR: 3.5-6.5% AIR EONTENT (%): N/A V~,'IT WEIGHT (pcf): N/A TEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Paving-See attached sketch ASTM C- 172 ASTM C-39 SAMPLE I.OCATION: See placement location REPORT OF TESTS ACCUMULATIVE YARNS: 140 CYLINDER MEASURED MAXLMUM COMPRESSIVE MARKED SLL~,-IP DATE AGE LOAD STRENGTII FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.50 06/20/2000 7 109530 3870 I 2 5.50 06/20/2000 7 106690 3770 Average 3820 I 3 5.50 07/11/2000 28 149760 5300 1 4 5.50 07/11/2000 28 144430 5110 Average 5210 Technician: MarioGarcia Started: 8:00am Finished: 10:30am ~~~gi~ Inc. Report Distribution: er_n,,,, ( 1 ) St. Ann's Catholic Community ( I ) Datum Engineering. Inc. ( I ) Centex Construction (I) City of Coppell t.,~,,,,- Eric""I. Cleveland, P.E. ( 1 ) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of 1 CONCRETE COMPREoSIVE STRENGTH TES. ENGL\'EERLN~, INC. a division of 8901 Carpenter Frwy., Suite #100 Dallas, Texas Date of Service: 06/14/2000 Report No.: 0015599 Report Date 07/13/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction .MIX I.D.: 8272 CONCRETE SUPPLIER: TXI PI,ACEMENT DATE: 06/14/2000 BATCII TIME: 8:25am PLANT: 41 TIME SAMPLED: 8:56am BY: Eric Garcia SPECIFICATION REQUIRE_MEN'TS WEATllER CON'DITIONS: Light rain STRENGTII: 3500 psi @ 28 Days TEMPEP, ATURE(F)- AIR 78 F CONCRETE: 90 F SLUMP: 4-6" Tm'CK NO: 38 TICKET NO: 2659811 AIR: N/A AIR CONTENT (q¢): N/A C'NIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Paving SW of shopping center ASTM C-172 ASTM C-39 SAMPLE LOCATION: Paving 120' E of Samuel Blvd. REPORT OF TESTS ACCUMULATIVE YARDS: 1 10 CYLINDER MEASURED MAX~-IUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTII FP~.XCTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.00 06/21/2000 7 108930 3850 I 2 5.00 06/21/2000 7 105240 3720 Average 3790 I 3 5.00 07/12/2000 28 143970 5090 I 4 5.00 07/12/2000 28 140250 4960 Average 5030 Technician: Eric Garcia Started: 5:00am Finished: 7:30am ~~e Report Distribution: ering, Inc. (1) St. Ann's Catholic Community (1) Datum Engineering, Inc. (1) Centex Construction (I) City of Coppell ' r"'"~"C"~ri~ J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 1 of I