St Ann Catholic-LR000711CONCRETE COMPREoSIVE STRENGTH TES.
ENGLNEERING, INC.
a division ofl~--'dl~i~
8901 Carpenter Frwy., Suite gl~
Dall~, Tex~ 75~7
Date of Service: 06/09/2~0 Report No.: ~ 15171 Report Date
07/11/2~
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Aun: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement l~ations, perform required field test and cast
compressive strength samples.
PROJECT DATA
CONTRACTOR: Centex Construction MIX I.D.: 8272
CONCRETE SUPPLIER: TXI PLACEMENT O.ATE: 06/09/2000 ~.ATCH TFME: 7:09am
PLA.NFl': 4 1 II3-1E SAMPLED: 7:48am BY: Joey Gordon
SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F)- AIR 72 r CONCRET};: 77 ~:
SLC*IP: 5.0" Max TRt~CI~ NO: 643 TICr,~T NO: 2657452
AIR: N/A AIR CONTENT (%): N/A UNIT WEIGItT (pcf): N/A
TF3T METHOD: ASTM C-143 PLACEMENT LOCATION:
Paving southside of parking lot from Sandy Lake 400' N
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: See below
REPORT OF TESTS ACCt .WLATIVE Y.Am)S: 10
CYLINDER MEASURED l~LAXI2%IIJM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTil FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 I 6.00 06/16/2000 7 72490 2560
I 2 6.00 06/16/2000 7 67170 2380
Average 2470
I 3 6.00 07/07/2000 28 89860 3180
I 4 6.00 07/07/2000 28 87910 3110
Average 3150
Sample location: Paving 30' N of Sandy Lake and 60' E of Samuel Blvd.
Technician: Joey Gordon Started: 6:00am Finished: 9:00am ineering, Inc.
Report Distribution:
( I ) St. Ann's Catholic Community ( I ) Datum Engineering, Inc.
(I) Centex Construction (I) City of Coppell . C_leveland, P.E.
(I) City of Coppell Senior Project Engineer
(I) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
01LL Page 1 of 1