Loading...
St Ann Catholic-LR000623CONCRETE COMPRE ,oIVE STRENGTH TES' a division ofl~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/14/2000 Report No.: 0015599 Report Date 06/23/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction StIXI.D.: 8272 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 06/14/2000 BATCH TI3.IE: 8:25am PLANT: 41 TIME SAMPLED: 8:56am BY: Eric Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Light rain STRENGTH: 3500 psi @ 28 Days TESn'ERATURE (F)- AIR 78 F CONCRETE: 90 F SLt~-IP: 4-6" XRUCK NO: 38 TICKET NO: 2659811 AIR: N/A AIR CON'TENT (%): N/A UNIT WEIGIlT (pcf): N/A TEST METHOD: ASTIV[ C- 143 PLACEMENT LOCATION: Paving SW of shopping center ASTM C-172 ASTM C-39 SAMPLE LOCATION: Paving 120' E of Samuel Blvd. REPORT OF TESTS ACCL*IULATIVE YARDS: 1 10 CYLINDER MEASURED MAXIblUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FIL~CTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 I 5.00 06/21/2000 7 108930 3850 1 2 5.00 06/21/2000 7 105240 3720 Average 3790 I 3 5.00 07/12/2000 28 1 4 5.00 07/12/2000 28 Technician: Eric Garcia Started: 5:00am Finished: 7:30am J~n~ineerlng, Inc. Report Distribution: (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (I) Centex Construction (I) City of Coppell Eric J. Cleveland, P.E. (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I