Loading...
St Ann Catholic-LR000619CONCRETE COMPRE V-'IVE STRENGTH TEST-" ENGLNEERLNG, INT..'. a division of 8901 Carpenter Fr~?., Suite #100 Dallas, Texas 75247 Date of Service: 06/09/2000 Report No.: 0015171 Report Date 06/19/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Atto: Monsignor Kilian Brodcrick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRAC'rOR: Centex Construction MiX LD.: 8272 (.X)NCRETE SUPPLIER: TX! PLACEMENT hATE: 06/09/2000 l}A'r(.'H TIME: 7:09am PLANT: 41 TIMES.%.MPLED: 7:48am sV: Joev Gordon SPECIFICATION REQUIREMENTS WEATtlER CO.~Orrtoxs: Partly cloudy STRE~XGTH: 3000 psi :~ 28 Days TEMPEa.%Tt:RE(F)-Am 72 F COXCRE'rE: 77 SLVMP: 5.0" Max TRUCg .~O: 643 TIC~ET .~O: 2657452 Am: N/A AiR ¢.X)NTENT (%): N/A {:NIT WEIGHT (pc0: N/A TEST METHOD: ASTM C- 143 PI,A¢:EMENT LOCATION: Paving southsid¢ of parking lot from Sandy l~ke 400' N ASTM C- 172 ASTM C-39 SAMPLE LOCATION: S¢~ b~loxv REPORT OF TESTS ACCI'MULATIVE YARDS: 10 C~'LINDER MEASURED MAXIMUM COMPRESSIVE -M-SJ~KED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inchez) TESTED (da)~) (lbs. for~e) (psi) TYPE 1 I 6.00 06/16/2000 7 72490 2560 1 2 6.00 06/16/2000 7 67170 2380 Average 2470 I 3 6.00 07/07/2000 28 I 4 6.00 07/07/2000 28 Sample location: Paving 30' N of Sandy Lake and 60' E of Samuel Blv/~. Report mstribution: ~/-/~~~nglneerlng, ,nc. (1) St..4xm's Catholic Community (!) Datum Engineering, Inc. //~'// (I)CentexComtmction (l)CityofCoppell ~ -- t~Eric J. Cleveland. P.E. (I) Ci~' of Coppell Senior Project Engineer ( I ) .Miiance .Architects This report is exclusively for the use of the client indicated above and shall not be reprodu-,>:'"'~ exc.:pt in full without the x~iuen approval of FIBC Engineering, Inc. 0iLL Page 1 of 1