St Ann Catholic-LR000619CONCRETE COMPRE V-'IVE STRENGTH TEST-"
ENGLNEERLNG, INT..'.
a division of
8901 Carpenter Fr~?., Suite #100
Dallas, Texas 75247
Date of Service: 06/09/2000 Report No.: 0015171 Report Date
06/19/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Atto: Monsignor Kilian Brodcrick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.
PROJECT DATA
CONTRAC'rOR: Centex Construction MiX LD.: 8272
(.X)NCRETE SUPPLIER: TX! PLACEMENT hATE: 06/09/2000 l}A'r(.'H TIME: 7:09am
PLANT: 41 TIMES.%.MPLED: 7:48am sV: Joev Gordon
SPECIFICATION REQUIREMENTS WEATtlER CO.~Orrtoxs: Partly cloudy
STRE~XGTH: 3000 psi :~ 28 Days TEMPEa.%Tt:RE(F)-Am 72 F COXCRE'rE: 77
SLVMP: 5.0" Max TRUCg .~O: 643 TIC~ET .~O: 2657452
Am: N/A AiR ¢.X)NTENT (%): N/A {:NIT WEIGHT (pc0: N/A
TEST METHOD: ASTM C- 143 PI,A¢:EMENT LOCATION:
Paving southsid¢ of parking lot from Sandy l~ke 400' N
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: S¢~ b~loxv
REPORT OF TESTS ACCI'MULATIVE YARDS: 10
C~'LINDER MEASURED MAXIMUM COMPRESSIVE
-M-SJ~KED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inchez) TESTED (da)~) (lbs. for~e) (psi) TYPE
1 I 6.00 06/16/2000 7 72490 2560
1 2 6.00 06/16/2000 7 67170 2380
Average 2470
I 3 6.00 07/07/2000 28
I 4 6.00 07/07/2000 28
Sample location: Paving 30' N of Sandy Lake and 60' E of Samuel Blv/~.
Report mstribution: ~/-/~~~nglneerlng, ,nc.
(1) St..4xm's Catholic Community (!) Datum Engineering, Inc. //~'//
(I)CentexComtmction (l)CityofCoppell ~ -- t~Eric J. Cleveland. P.E.
(I) Ci~' of Coppell Senior Project Engineer
( I ) .Miiance .Architects
This report is exclusively for the use of the client indicated above and shall not be reprodu-,>:'"'~ exc.:pt in full without the x~iuen approval of FIBC Engineering, Inc.
0iLL Page 1 of 1