Loading...
MA 96/97-LR 971028 Maxim Tech. a Southwestem Labs - 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 T E C H N O L O G I E S I N tC Telephone: (214) 631-2700 FAX: (214) 920-1891 REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: ABCON CONSTRUCTION Attn: Rusty Whitaker PAGE I OF 2 1045 E. HWY 121 Lewisville, TX 75057 PROJECT NO.: 9710310 REPORT NO.: 124270 PROJECT: Pavement Renovation -CopDell DATE OF SERVICE: 9/30/97 Texas, Various AUTHORIZATION: Rusty Gateway and Freeport REPORT DATE: 10/28/97 SERVICES: Sample concrete at location of placement, perform required field tests, prepare and test concrete compresslye strength specimens. PROJECT DATA CONTRACTOR: ABCON CONTRUCTION CLASS OF CONCRETE: Mix #8274 CONCRETE SUPPLIER: TXI DATE OF PLACEMENT: 9/30/97 PLANT: 31 TIME SAMPLED: 09: 40AM BY: Phillip -L. Forrest SPECIFICATION REQUIREMENTS TEMPERATURE (DegF) - AIR: 79 CONCRETE: 94 STRENGTH: 3000psi @ 28 DAYS TRUCK NO: 560 TICKET NO: 895999 SLUMP: 5" AIR: 4-6 MEASUREDSLUMP(in.): 5,50 METHOD OF TEST AIR CONTENT(%): 5.5 UNIT WEIGHT(pcf): N/A SAMPLING: ASTM C-172 LOCATION OF PLACEMENT: MOLDING & CURING: ASTM C31 SLUMP: ASTM C143 Paving, west lane of gateway 100 block 3' TEMPERATURE: ASTM C1064 south of north side 10°west of east side. AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. TESTED (days) (in.) (sq.in.) (Ibs. force) (psi) FRACTURE TYPE REMARKS 1 1 10/07/97 7 6.00 28 · 27 101320 3580 CONE i 2 10/07/97 7 6.00 28.27 106220 3760 CONE i 3 10/28/97 28 6.00 28.27 132220 4680 CONE 1 4 10/28/97 28 6.00 28.27 137950 4880 CONE ADDITIONALCOMMENTS: 10 Gallons of water added at site. ***Revised October 30, 1997 to reflect correct compressive strength Report Of Tests Continued On Page 2 Our letters and reporte are for the exdueive tae of the client to whom they are eddreued and ~ not be reproduced exce in full without the approval of the testir; leborato . The use of our name must receive our written agprovd, Our letters ~J~re;porm 1001 DY eppay ooay to the simple tested end/or inspectS, and Ire not indicative of the quantities of N)parentiy identical or similar products. ABCON CONSTRUCTION REPORT NO. 124270 PROJECT NO. 9710310 PAGE 2 OF 2 DATE OF SERVICE: 9/30/97 SET NO. I REPORT OF TESTS ~Continued} ADDITIONAL COMMENTS requirement per Rusty Whitaker*** Technician: Phillip L. Forrest Started: 08:00AM Stopped: 10:00AM Technician Report Distribution: (1) ARCON CONSTRUCTION n~ c.v o, co..~, MAXIM T~~N LABS c c,~en, B.S. Ch.E. fOturlettin and reports are for the exclusive use of ~e djent tO whent they are ed MAX~Manager without ~e approve] of the te~ir~l I~boratory. The uee of our name muir receive our written approval. Our letterl ~nc~rre~aall ullI 1001 DY app y only to the ~mnple teeted and/o~ irepected, and are not indicative of the quantitiee of apparently identical or eimilar Ixoducm.