Loading...
St Ann Catholic-LR000615CONCRETE COMPRE .,VE STRENGTH TEST a division of ~ Te~ 7~247 Date of Se~ice: 06/06/2000 Repo~ No.: 0014795 Repo~ Date 06/15/2000 Client No.: 2310 Project No.: 94001152 Client: St. ~n's Ca~olic Co~uni~: Project: St. ~'s Catholic Church A~: Monsi~or ~li~ Br~6fick 180 S~uel Boulevard 180 S~uel Boulevard Coppell. Texas Cop~ll TX 75019 · Sec'ices: Obtain s~ples of fresh ~ncrete at the placement l~ations~ peffo~ r~uir~ field test and c~t compressive stren~h samples. PROJECT DATA o).~x~.acrroR: Centex Construction _xnx rD.: 8273 CONCRETE SI'PPLIER: TXI PI.ACEMENT DATE: 06/06/2000 BATCH'rIME: 7:35am PLAN'r: 41 X~ME SAMe~,~:D: 8:45~ ~V: Shoe Spinks SP~'IFICATION REQUIREMENTS WEATIIER CONDITIONS: Sunnv sx~;'m: 3500 psi .?~. 28 Days XEMr~.XXC~E(~')-Am 75 V C:OXC~X~: 83 V SLUMP: 3-5" TRUCK~O: 453 'm:~;XNO: 2654153 .~R: 3-5% AIR CONTENT (%): 4.4 UNIT WEIGHT (~: N/A TEST METmOr: ASTM C - 143 m,ACEMENT L(~ ?ATION: Fire I~e at NE a~roac~ 75' S x 10' W of NE cc~ of appr<~ch ASTM C-172 ASTM C-39 S~MPLE L~LVYION: See pla~mcnt l~ation REPORT OF TESTS ACCrX~t'LAT~X~YAm~S: 90 CYIJNDER MEASURED MAXLM[M COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTI'RE SET NO. (inches) TESTED (da.~) Obs. force) (psi) TYPE I I 5.75 06/13/2000 7 115900 4100 1 2 5.75 06/13/2000 7 117320 4150 Average 4130 I 3 5.75 07/04/2000 28 I 4 5.75 07/04/2000 28 This report is exclusively for the u~ of the client indicated above and shall not be reproduced excerpt in full vdthout thc written approval of HBC Engine~ning, Inc. 0ILL Page ! of 2 CONCRETE COMPRESSIVE STRENGTH TEST'-' ENGLN :IJfaR]LNG, INC. a division 8901 Carpenter Fr~?. Suite #100 Dallas, Texas 75247 Date of Service: 06/06/2000 Report No.: 0014795 Report Date 06/15/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic CommuniW Project: St. Ann's Catholic Church Attn: Monsignor Kilian Brod~rick ! 80 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CO.~X~,AcrrOR: Centex Construction MLX CD.: 8273 CONCRETE SUPPLIER: TXI PLACEMENT DAXF,: 06/06/2000 BATCll'rIME: 8:00am PLAN'Ir: 4 ! TLX~E SAMPI.ED: 9:20am m': Shane Spinks SPECIFICATION REQUIREMENTS WEATHER C'ONDITIONS: SunlIV. warm STRENGTH: 3_ 00 psi '?i 28 Days TENIPERATURE (E)- AIR 79 V CONCRETE: F SLL'MP: 3-5" TRUCK NO: 7 ! TICKET NO: 2654194 AIR: 3-5% AIR CONTENT (%): 4.9 UNIT X~ml{X (0¢0: N/A 'rEST METIIOD: ASTM C- 143 PLACEMENT LOCATION: Paving fire lane ASTM C- 172 ASTM C-39 SA.MPLE LOCATION: See page I REPORT OF TESTS .~C¢:rm:LST,VEX'.XRDS: 120 CYLINDER MEASURED NI_~XIMUM CO.MPRESSIVE 5LARKED SLL'MP DATE .aGE LOAD STRENGTll FR.~tCTI.;RE SET NO. (inches) TESTED (da)s) Obs. force) (psi) TYPE 2 I 5.50 06/13/2000 7 123940 4380 2 2 5.50 06/13/2000 7 122400 4330 Average 4360 2 3 5.50 07/04/2000 28 2 4 5.50 07/04/2000 28 Technician: Shatlc Spinks Started: 7:00am Finished: 1 l:30am - . . Report Distribution: ~ng, Inc. ( I ) St..Ann's Catholic Conununity (I) Datum Engineering. Inc. (I) c~ex Co~t~uaion (~) cib. orcoppeH Eric J. Cleveland, P.E. (I) Cib' of Coppell Senior Project Engfl~eer (i) Mlian~e Ardnitects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the ~naftten approval of HBC Engino.'rmg. Inc. 0iLL Page 2 of 2