Loading...
St Ann Catholic-LR000614 CONCRETE COMPRE ,SIVE STRENGTH TES.. a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 752,47 Date of Service: 06/05/2000 Report No.: 0014671 Report Date 06/14/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction Mm I.D.: 8272 CONCRETE SUPPLIER: TXI PLACE.~IENTDATE: 06/05/2000 BATCHTlblE: 7:53am PLAWY: 41 TIME SAMPLED: 8:40am BY: Eddie Elrod SPECIFICATION' REQUIREMEN-I'S WEATHER CO~-OITIONS: Cloudy STRENGTI~: 3000 psi @ 28 Days TEIVn'ERATUP,~ (F) - AIR 75 t: COt~'CRETE: 86 sLtr~n,: 5.0" Max TmJCK ~O: 927 ~CKET.~O: 2653623 AIR: N/A AIR CONTENT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMEN"r LOCATION: Paving ASTM C- 172 (See attached sketch) ASTM C-39 SAMPLE LOCATION: See placement location REPORT OF TESTS ACC[.r mr YARDS: 10 CYLINDER MEASURED MAXIMUM CO~tPRESSIVE MARKED SLL3fP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 5.25 06/08/2000 3 95550 3380 I 2 5.25 06/12/2000 7 107750 3810 I 3 5.25 07/03/2000 28 1 4 5.25 07/03/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering. Inc. 0ILL Page 1 of 3 CONCRETE COMPREoSIVE STRENGTH TES a division of]~taman 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/05/2000 Report No.: 0014671 Report Date 06/14/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction Mm I.D.: 8272 CONCRETE SUPPLIER: TXI PLACEMENT DATE: 06105/2000 BATCH T~: 9:31am PLA.~r: 41 T~IE SAMPLED: 10:35am aY: Eddie Elrod SPECIFICATION REQUIRE.'~IENTS WEATHER CONDITIONS: Clear STRESGTH: 3000 psi @ 28 Days TESU,ERATtJRE (F). AIR 82 F CONCRETE: 80 F SL~'~U': 5.0" Max TRUCK NO: 58 TICra~T NO: 2653726 AIR: N/A AIR CONTE~xrr (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 AST,M C-172 ASTM C-39 SAMPLE LOCATION: See page I REPORT OF TESTS ACCLqVIULATIVE YARDS: 110 CYLINDER MEASURED MAX~CU~I COMPRESSIVE .MARKED SLL~I3P DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 5.50 06/08/2000 3 82020 2900 2 2 5.50 06/12/2000 7 96270 3400 2 3 5.50 07/03/2000 28 2 4 5.50 07/03/2000 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 3 CONCRETE COMPREoSIVE STRENGTH TE£ a division of~Fllfr=~gl~ 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 06/05/2000 Report No.: 0014671 Report Date 06/14/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Atm: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Centex Construction Mm LD.: 8272 CONCRETE SUPPLiXR: TXI PLACV. MEN'r DATE: 06/05/2000 BATCHTmm: 10:24am PLANT: 41 TE.MESAMPLED: ll:50am BY: Eddie Elrod SPECII:ICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 3000 psi @ 28 Days TEStPERATURE (lq- AIR 83 F CONCRETE: 86 F SLC~n': 5.0" Max Tm.TCK SO: 642 TICKET NO: 2653772 AIR: N/A AIR CONTE."cr (%): N/A ~IX W~iGlrr (pm: N/A TEST METHOD: ASTM C- 143 PLACEMEN'F LOCATION: See page l ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See page I REPORT OF TESTS . CCCMt-_ TIw YAm)S: 170 CYLINDER NfKASURED MAXI3,1L ~'M COMI~RESSIVE MARKED SLL.WIP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 1 5.50 06/08/2000 3 70830 2500 3 2 5.50 06/12/2000 7 86330 3050 3 3 5.50 07/03/2000 28 3 4 5.50 07/03/2000 28 Technician: Eddie Elrod Started: 6:00am Finished: 2:00pm Report Distribution: C (I) St. Ann's Catholic Community (1) Datm-n Engineering, Inc. (1) Centex Construction (1) City of Coppell (1) City of Coppell Senior Project Engineer (I) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 3 of 3