Loading...
St Ann Catholic-LR000608IN-PLACE DENSITY TwSTING ENGI~,'EERLNG, LNC. a division ofl~'-~iOI1 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/23/2000 Report No.: 0013618 Report Date 06/08/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: In-place density testing. PROJECT DATA CONTRACTOR: Laboratory Test Method: Field Test Method: Centex Construction ASTM D-698 ASTM D2922 ASTM D3017 MOISTURE DENSITY RELATIONS: Maxhnum Project Requirements l~ffD No. Description Moisture % Density pcf Moisture Density 1 Tan silty sandy clay w/gravel (lime treated) 16.0 106.0 -1/+3% 95% FIELD DENSITY TESTS TEST PROBE LIFT/ M/D MOISTURE DRY DENSITY DENSITY NO TEST LOCATION DEPTH ELEV No. (%) (pcf) (% max) 1 See attached drawing 6" FG 1 16.8 100.7 95 2 See attached drawing 6" FG I 18.0 101.3 96 3 See attached drawing 6' FG 1 17.5 102.6 97 4 See attached drawing 6" FG I 16.8 103.1 97 5 See attached drawing 6" FG I 17.5 102.2 96 6 See attached drawing 6" FG I 18.3 101.9 96 Test results on this report meet project specification. FG= Final Grade Inc. Technician: Mike Whyman Started: 4:00p Finished: 5:30p Report Distribution: (I) St. Ann's Catholic Community (1) Datum Engineering, Inc. (1) Centex Construction (l) City of Coppcll Eric J. Cleveland, P.E. (1) City of Coppcll Senior Project Engineer (1) Alliance Architects This report is exclusively for the use of the client indicated above and shall not bc reproduced except in full without the written approval of HBC Engineering, Inc. 07LLW Page I of I