Loading...
St Ann Catholic-LR000606 ENGI~O~ERING, 1NC 8901 Carpenter Frwy, Suite ~100 Dallas. Texas 75247 Date of Service: 06/06/00 Report No.: 0014794 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church 1 g0 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Structural Locations/Items Inspected: Paving, Fire Lane at NE comer of property Test Method: Visual Observation REPORT OF INSPECTION ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tied Properly Bar Size X Proper Bar P'acemer',.'. X Ties ar.d Spaces X Bar Grade X Prooer!y T ed X Stirrup Spacing/TyFe Rebar C:ean ~X~ Dowe. Bars ,n Place X Welded Splices Form Clean Proper 5ar SuFaons X Mechanical Solices Number of Bars X La:~pecl Sp,.ces X Proper Cover X Discrepancies/Comments: No discrepancies noted at the time of inspection. Technician: S. Spinks Started: 6:00 a.m. Stopped: 7:00 a.m. Report Distribution: '~~~ Inc. (1) St. Ann's Catholic Community (1) Datum Engineering. Inc. (1) Centex Construction (1) City of Coppell (1) City of Coppell (1) Alliance Architects Eric J. Cleveland, P.E. Senior Project Engineer 309dp Th,s report, :s exc'.uslvely ,*or lhe use of the char't inclcate: above and shall not be reproduced wdhot~t wr:tten approval of HBC Engineering. Inc.