St Ann Catholic-LR000605REPORT OF REINFORCING STEEL INSPECTION
8901 Carpcntc~ Fra3'., Stere -".100
Dallas, Texas 75247
Date of Service: 06/05/00 Report No.: 0014670
GlientNo.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
180 Samuel Boulevard 180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Observe placement of reinforcing for compliance with ~urnished drawings.
PROJECT DATA
Drawings Utilized: Civil
Locations/Items Inspected: Pa~ng-See Attached Drawing
Test Method: Visual Observation
REPORT OF INSPECTION
ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tied Property
Bar Size ~1~ Proper Bar Placement X Res and Spaces X
Bar Grade X Properly Tied X Stinrup Spacing/Type
Rebar Clean X Dowel Bars ,n Place X Welded Sphce$
Form Clean Proper Bar Supports X Mechanical Selices
Number of Bars X Lapped Spl*ces ~)~ Proper Cover
Discrepancies/Comments: No discrepancies noted at the time of inspection.
Technician: E. Elrod Started: 7:00 a.m. Stopped: 7:30 a.m.
Report Distribution: .~~
(1) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(1) Centex Construction (1) City of Coppell
(1) cay of Coppe,
(1) Alliance Architects Eric J. Cleveland, P.E.
Senior Project Engineer
309dp Th~s repo~t m excluswely fo~ Uqe use of the clieflt indicated above and shall no~ be reproduced without written approval of HBC: Eng~neenng. Inc