St Ann Catholic-LR000602REPORT OF REINFORCING STEEL INSPECTION
8901 Carpenter Frv.~., Suite #100
Dallas, Texas 75247
Date of Service: 06/02/00 Report No.: 0014502
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
180 Samuel Boulevard 180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized:
Locations/Items Inspected: Paving (see attached sketch)
Test Method: Visual Observation
REPORT OF INSPECTION
ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT ITEMS INSPECTED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tied Properly
Ba~ Size X Proper Bar PI ..... t X Ti .... d Spaces X
Bar Grade X Properly T~ed X Stirrup Spacing/Type
Rebar Clean X Dowel Bars in Place X Welded Splices
Form Clean X Proper Bar Supports X Mechanical Splices
Numbe~ of Bars X Lapped Sphces Proper Cover X
Discrepancies/Comments: _~Jo discrepancies noted at the time of inspection.
Technician: M. Cummings Started: 6:00 a.m. Stopped: 7:00 a.m.
ngin ' , In .
(1) St. Ann's Catholic Community (1) Datum Engineering, Inc.
(1) Centex Construction (1) City of Coppell
(1) City of Coppell
(1) Alliance Architects.
Senior Project Engineer
309dp This repo~l is exclusively for the use of [he chent ,nd,ceted above and shall not be reproduced without written appeoval of HBC Engineering. Inc.