Loading...
St Ann Catholic-LR000526REPORT OF SOIL-LIM_. MIXTURE a division 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 05/20/2000 Report No.: 0013405 Report Date 05/26/2000 Client No.: 2310 Project No.: 94001152 Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church Attn: Monsignor Kilian Broderick 180 Samuel Boulevard 180 Samuel Boulevard Coppell TX 75019 Coppell, Texas Services: Soil-lime mixture pulverization. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for soil-lime mixture pulverization. HBC's technician arrived at the jobsite and no one was on-site. The soil-lime mixture pulverization tests for this date were cancelled due to rain. Technician Time: 9:30 a.m. to 10:30 a.m. Technician: Roy Montgomery ~~~neering, Inc. Report Distribution: (i) St. Ann's Catholic Community (I) Datum Engineering, Inc. (1) Centex Construction (I) City of CoppeII Eric J. Cleveland, P.E. ( 1 ) City of Coppell Senior Project Engineer ( 1 ) Alliance Architects This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 99SDS Page I of 1