St Ann Catholic-LR000526REPORT OF SOIL-LIM_. MIXTURE
a division
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
Date of Service: 05/20/2000 Report No.: 0013405 Report Date
05/26/2000
Client No.: 2310 Project No.: 94001152
Client: St. Ann's Catholic Community Project: St. Ann's Catholic Church
Attn: Monsignor Kilian Broderick 180 Samuel Boulevard
180 Samuel Boulevard
Coppell TX 75019 Coppell, Texas
Services: Soil-lime mixture pulverization.
On this date, an HBC Engineering technician arrived at the above referenced
jobsite as scheduled for soil-lime mixture pulverization. HBC's technician
arrived at the jobsite and no one was on-site. The soil-lime mixture
pulverization tests for this date were cancelled due to rain.
Technician Time: 9:30 a.m. to 10:30 a.m.
Technician: Roy Montgomery ~~~neering, Inc.
Report Distribution:
(i) St. Ann's Catholic Community (I) Datum Engineering, Inc.
(1) Centex Construction (I) City of CoppeII Eric J. Cleveland, P.E.
( 1 ) City of Coppell Senior Project Engineer
( 1 ) Alliance Architects
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
99SDS Page I of 1