MA 96/97-LR 970909 Maxim Tech. · Southwestern Labs
· 2575 Lone Star Dr. · P.O, Box 224227
Dallas, Texas 75222
T E C H N O L O G I E S I N C Telephone: (214) 631-2700
FAX: (214} 920-1891
REPORT OF
PICK UP CYLINDERS
CLIENT: ABCON CONSTRUCTION
Attn: Rusty Whitaker
1045 E. HWY 121
Lewisville, TX 75057 PROJECT NO.: 0903506319
REPORT NO.: 122903
PROJECT: Pavement Renovation -Coppall DATE OF SERVICE: 9/04/97
Texas, Various AUTHORIZATION:
113 DOBEKA REPORT DATE: 9/09/97
SERVICES: Pick up cylinders
REPORT OF TESTS
On this date, a Maxim Technologies representative arrived on site to pick
up compressive strength test specimens cast prior to this date.
Page I of 1
Technician Time: 1.5 hours
Technician: Gary Kamrath
(1 } ASCON CONSTRUCTION /
uJ c~ ~ c~ MAXI
BS
r~ e acken, B.S. Ch.E.
· Manager
ft~lrl lettere and reports are fo; the exclusive use of the client to whom they ate
without the epptovll of the telring laboratory, The I. me of our nlme must receive ou~ written approval, Our lettam ~d~P~portl
1099 LW N}P Y only to the earnpie tested and/or irmaacted, attd are not indicative of the (luantitiel of appatently identical ~' similar preducte,