Loading...
MA 96/97-LR 970902 Maxim Tech. · Southwestem Labs 2575 Lone Star Dr. · P.O. Box 224227 Dallas, Texas 75222 Telephone: (214) 631-2700 T E C H N O L O G I i S I N C FAX: (214)920-1891 REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: ABCON CONSTRUCTTON Attn: Rusty Whitaker PAGE 1 OF 1045 E. PIWY 121 Lewisville, TX 75057 PROJECT NO.: 0903506319 REPORT NO.: 122316 PROJECT: Pavement Renovation -Coppell DATE OF SERVICE: 8/26/97 Texas, Various AUTHORIZATION: Rusty 119 Heartz REPORT DATE: 9/02/97 SERVICES: Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. PROJECT DATA CONTRACTOR: ABCON CONTRUCTION CLASS OF CONCRETE: Mix Number 8274 CONCRETE SUPPLIER: TXI DATE OF PLACEMENT: 8/26/97 PLANT: 41 TIME SAMPLED: 08=35AM BY: Stewart Ainsworth SPECIFICATION REQUIREMENTS TEMPERATURE (DegF) - AIR: 85 CONCRETE: 90 STRENGTH: 3500139i @ 28 DAYS TRUCK NO: 459 TICKET NO: 869981 SLUMP: 3-5" AIR: 3-6% MEASURED SLUMP (in.): 6.00 METHOD OF TEST AIR CONTENT(%): 4.50 SAMPLING: ASTM C-172 LOCATION OF PLACEMENT: MOLDING &CURING: ASTM C31 Paving slab at 119 Hertz SLUMP: ASTM C143 TEMPERATURE: ASTM C1064 AIR CONTENT: ASTM C231 UNIT WEIGHT: N/A CAPPING/PADS: ASTM C617 TESTING: ASTM C39 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH SET NO. TESTED (days) ~(in.) (sq.in.) (Ibs. force) (psi} FRACTURE TYPE REMARKS 1 i 9/02/97 7 6.00 28.27 119420 4220 CONE I 2 9/09/97 14 I 3 9/23/97 28 I 4 9/23/97 28 Technician: Stewart Ainsworth Started: 08: 00AM Stopped: 10: 00AM Technician Report Distribution: M~~ * ' ' .' , . . h~E.