Loading...
Stoneleigh P1-CS 970523The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 May 23, 1997 Mike Daniel, P.E. Nathan D. Maier 8800 N. Central Expwy., Suite 300 Dallas, TX 75231 Stoneleigh at Riverchase Development Fee Assessment Dear Mr Daniel: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $543,360.38 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt m the Engineering Department will help us m verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Y. KennTeth M. Grift'm, P.E. Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Date: Stoneleigh at Riverchase 5/23/97 (100% due prior to Council Approval) Water Tap Inspection Fee (100% due at Issuance of Water Meter) TOTAL FEES DUE $34,425.00 $250.00 Water Meter Fee (Fire/Domestic) $14,569.80 (100% due at Issuance of Water Meted Water Meter Fee (Irrigation) $587.94 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $175.00 (100% due at Issuance of Water Meter) $22,500.00 $22,500.00 Wastewater Impact Fee (100% due prior to Council Approval) Wastewater Tap Inspection Fee (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee (100% due at Issuance of Building Permit) Park Fee (100% due prior to Council Approval) Roadway Impact Fee (100% due prior to Council Approval) Street Light Fee (100% due prior to Acceptance of Project Street Sign Fee (100% due prior to Acceptance of Project Construction Inspection Fee TOTAL $100.00 $350.00 $462,600.00 $23,835.38 $23,835.38 N/A Information not available at this time Need submittal of development contracts $559,453.12 TOTAL AMOUNT DUE PRIOR TO COUNCIL ~ ~ ~ ~O * .~ ',. ,~l : DEVELOPMENT FEE WORKSHEET PROJECT: Stoneleigh at Riverchase DATE: 5/23/97 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 4 inch 3 - 2 inch 2 - 8 inch 5O 24 2.5 Total #: 76.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 5 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Fire/Domestic): Total #: 2 8"X4" Meter(s) @ $7,284.90 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation): Total #: 3 Irrigation Meter(s) @ Total #: Additional Irrigation Meter(s) @ Total #: Fireline Meter(s) @ (100% due prior to issuance of water meters) 95.98 Water Meter Deposit Fee (Domestic): Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 5 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wzstewater Impact Fee: Total Domestic Meters ESU' ESU's ESU's ESU's ESU's $34,425.00 $250.00 $14,569.80 $587.94 $60.00 $175.00 50 @$450.00ea. $22,500.00 Wastewater Tap Inspection Fee: Total #: 2 Domestic Water Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 7 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $100.00 $350.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit , (50% paid prior to Council approval of final piat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A 360 Single-family @ 91285.00 / Lot Multi-family ~ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A $462,600.00 $23,835.38 Information not avaihble at th/s m Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at Ibis time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contrac~ Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJF~T: DATE: Stondeigh at Rivtrchase 5/23/97 ROADWAY IMPACT FEE: Service Area * 7 Category ** Residential Land Usc ** BUildin~ Size (ScI. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle M!!es pe.r,,Development Unit) x (Fee per Vehicle Mile) -- Multi-Family N/A 36O 2.01 $300 $217,080.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) An 89.02% offset per service unit was granted, as per the Citys Roadway Impact Fee ordinance, Credit for property located in the Riverchase development due to the construction of Macarthur Blvd. $193,244.62 and Riverchase Dr.