Loading...
Stoneleigh P1-CS 970227 NATHAN D. MAIER CONSULTING ENGINEERS, INC. February27,1997 Ms. Jan Sidner Dallas Area Rapid Transit 1401 Pacific Avenue Dallas, Texas 75202 RE: ,.Vtoneleigh at Riverchase NDM $ob No.: 96-10-119 Dear Ms. Sidner: Attached is a set of Site Development Plans for the above referenced project which abuts DART's Right- of-Way. In order to relieve the problem of ponding storm water accumulating in DART's right-of-way adjacent to our development, we are requesting DART's permission to enter upon the right-of-way, perform minor grading work and r~g of the ground at the project's completion. We will also need to install temporary silt fence to control erosion prior to the germination of the new grass. Please review our plans and let us know your feelings' concerning our request. Thank you for your consideration of thin matter. Sincerely, NATHAN D. MAIER Mike Daniel, P.E. MD/Idb Ken Griffin Keller Webster Todd Shaw Thrsa NorthPark / 8800 N. Csntral £xpwy. / Suite 300 / Dallas, Taxas 75231 / (214) 739-4741 NATHAN D. MAIER CONSULTING ENGINEERS, INC. '~'-uugo4_Hi F~ 27, 1997 Mr. Kevin Page Lone Star Gas Company P. O. Box 306 Lewisville, Texas 75067-0306 Dear Kevin: ,.~toneleigk at Riverchase NDM,Iob No.: 96-10-119 ARac~ is a set of our civil sim plans for the proposed project. Please review our plans and let us know of any potential conflicts with your facilities. Also, the City of Copper has asked that we seek the approval of Lone Star for grading improvements over your transmission line and its easement that is located north of and parallel to our south property line. Thank you for your assistance in this matter. NATHAN D. MAIER Mike Daniel, P.E. Ken Griffin Keller Webster Todd Shaw Three NorthPark / 8800 N. Central Expw¥. / Suite 300 / Dallas, Texas 75231 / (214) 739-4741 NATHAN D. MAIER CONSULTING ENGINEERS, INC. February 27, 1997 Trinity River Authority Central Regional Wastewater System P. O. Box 531196 Grand Prairie, Texas 75053 S~oneleigb at Riverckase NDM Job No.: 96-10-119 Attached are site development plans for the above referenced project. Note that we are proposing to construct a parking lot over TRA's easement and sewer line. Also note that we are proposing to lower the rinl5 of two manholes. Please be aware that when this site was reclaimed from the flood plain in the mid 1980's, with TRA's penmssion, we filled over this line with approximately 5 feet o¢fill material and raised these manholes. Please review our plans and let us know your thoughts about our proposal. Thank you for your consideration of this matter. Sincerely, NATHAN D. MAIER Mike Daniel, P.E. Ken Griffin Keller Webster Todd Shaw Three NorthPark / 8800 N.. Central Expw¥. / Suite 300 / Dallas, Texas 75231 / (214) 739-4741