Stoneleigh P1-CS 961121 PRI LIMINARY PLAT
P & Z HEARING DATE: November 21, 1996
C.C. HEARING DATE: December 10, 1996
LOCATION:
SIZE OF AREA:
CURRENT ZONING:
Along the south side of Riverchase Drive, approx. 645' east of
MacArthur Boulevard.
20.5 acres - 360 units
MF-2(Mulfi Family-2)
REQUEST:
APPLICANT:
Approval of a pmlimina~ plat that would allow the development
of a 360-unit apartment complex.
Applicant:
First Worthing Co./Seneca
8144 Walnut Hill, g550
Dallas, TX 75231
(214) 739-8141
Representative:
WSI Architects
6320 LBJ Frwy., g228
Dallas, TX 75240
(214) 458-9999
HISTORY:
No platting history.
TRANSPORTATION:
Riverchase Drive is a 4-lane undivided collector street within a
60'-wide right-of-way.
SURROUNDING LAND USE & ZONING:
North -
South -
East
West -
Riverchase Golf course, "SF-12" Single-Family 12
railroad right-of-way (Dallas Area Rapid Transi0, "A" Agriculture
vacant, "MF-2" Multi-Family-2
vacant and Riverchase Plaza, "R" Retail
Item # 7
COlV[PREHENSIVE PLAN:
The Comprehensive Plan shows the property suitable for
multi-family development.
DISCUSSION:
Apartments are a permitted use in the MF-2 zoning district and the
Comprehensive Master Plan shows this property to be suitable for multi-
family development. Staff has carefully reviewed the site plan with
regards to setback from the street, building heights, and internal
circulation and is satisfied with the layout of the project. The building
elevations including carports and garages were examined in terms of
design appeal, as well as in terms of the 80% brick masonry requirement
and staff is reassured that the final product will be compatible with the
surrounding developments in the Riverchase district. The plans will also
have to be approved by the Riverchase Architectural Review Committee.
The submitted landscape plan exceeds city planting requirements. The
applicant is proposing a dramatic landscaped entry accented with brick
pavement enhancements. The perimeter landscape buffers will contain 100
trees adding to the visual quality of the apartment complex.
Relative to the plat itself, there are several concerns which are outlined by
the Engineering, Leisure Services, and Fire Departments' Development
Review Committee comments of October 31, 1996. Those comments are
included here for your information. Many of staff concerns are
satisfactorily resolved, however, there are still a number of outstanding
issues which will require some discussion.
The applicant is short 82 off~street parking spaces and will be requesting
a parking variance similar to one that was granted to the lefferson at
Riverchase apartments located on MacArthur Boulevard. The Board of
Adjustment will, of course, determine whether the parking variance is
justified.
Additional traffic flow that will be generated by this proposed apartment
complex is of concern. Riverchase Drive is a four-lane undivided
collector street designed to carry and distribute traffic to MacArthur
Boulevard and Sandy Lake Road. The intersection of MacArthur and
Riverchase is particularly congested. Residents of this proposed
apartment complex wanting to travel southbound on MacArthur Boulevard
during peak hours will have trouble making the left-turn at this
intersection. Residents may have to use Sandy Lake Road as an alternate
route. The thoroughfare plan calls for a future Fairway Drive to the be
built to the east of this development connecting Riverchase Drive and
Beltline Road. When this occurs, the accessibility to Beltline Road will
be greatly improved alleviating some of the traffic concerns for this area.
(See Engineering comments for specific traffic and other development
related comments.)
The Fire Code requires that all portions of all buildings to be within a 150
feet hose lay distance from both a fire lane and a fire hydrant. The current
Item# 7
site plan does not specify fire hydrant locations. If the applicant cannot
meet this requirement, his only recourse would be to request a variance
from City Council. The Fire Department would not support a variance
request.
Finally, the Leisure Services Department comments warrant additional
explanation. If the developer is required to construct the City's Iqike and
Bike Trail, the cost will be deducted from the $1285 per unit park land
dedication fee. The Hilm and Bike Trail Master Plan suggests that the
probable best trail routing for this particular trail is on the south side of
the D.A.R.T. right-of-way. Also for your information, the Cottonbelt
trail continues westward beyond Coppell's city limits to Grapevine,
Southlake, Colleyville, Hurst, and North Richland Hills. It is located on
the south side of the rail line and adjacent to Highway 26. The City of
Grapevine is leasing 25' of the 100' D.A.R.T. right-of-way and has
begun the initial phase of its trail design.
RECOlVIMF~NDATION TO THE PLANNING AND ZONING COMMISSION:
Planning staff recommends approval of the preliminary plat subject to the following
conditions being met:
1. A parking variance being granted by the Board of Adjustments.
2. Under the shrubs section of the plant list on the landscape plan, list the botanical
name and the plant name for the Purple Leaf lapanese Barberry in the correct
columns.
3. Compliance with Fire Department's comments.
4. No requirement of a Hike and Bike trail easement or construction of same, as was
alluded to during the DRC discussions.
5. Submission of an irrigation plan.
6. Correct the spelling of *subdivision~ under the caption notifying that
property is in a flood hazard area.
7. Compliance with Engineering comments.
ALTERNATIVES:
1) Recommend approval of the Preliminary Plat.
2) Recommend disapproval of the Preliminary Plat.
3) Recommend modification of the Preliminary Plat.
Item # 7
ATTACHMENTS:
1) Preliminary Plat
2) Site Plan
3) Landscape Plan
4) Building Elevations
5) Hike and Bik~ Trail Master Plan
6) Departmental Comments
Item # 7
City of Coppell
Primary Trails and Greenwalks. The
primary trails connect major areas and
points of interest in the city. These primary
trails make up the network or basic structure
of the Trail System Master Plan.
Meandering through the city, the primary
trails follow drainage and utility corridors.
Cottonbelt Trail - This trail
intersections with seven trails including
the Dal-Homa Trail. It will play a
major part in Coppell's connections to
other areas. The trail could ultimately go
from the Fort Worth Stockyards on the
west to McKinney on the east. Within
Coppell, the trail will cross the entire
city east to west from Carroilton to
Grapevine.
'The "best" trail routing will probably be'
on the south side of the rail line. As the
rail line will remain active, extensive
coo~t~-~ith DAltT (the rail line
owner) will be needed before the trail is
~uilt. The section of trail on D/FW
International Airport land will provide
some additional opportunities for users to
enjoy landings and take-offs from the
trail, but will also require extensive
coordination with airport officials to
make certain airport and trail operations
don't interfere with each other.
Cowboy Trail - The Cowboy Trail is a
north/south trail running generally along
Denton Tap Road from the Cottonbelt
Trail on the south to the Denton Creek
Trail on the north.
On the north end, in Andrew Brown, Jr.
Community Park West, the trail will
split into two before both branches end
at the Denton Creek Ti;ail. This split is
important to maintaining through trail
traffic continuity in case the Denton
Creek Trail moves to the north side of
Denton Creek while still east of
Denton Tap Road
From Wynnpage at Denton Tap Road,
the trail goes southeast (to He. artz) and
northwest (to Sandy Lake Road) along
the Lone Star Gas pipeline easement.
Along the northwest branch, the trail
splits before reaching Sandy Lake
Road and the main branch goes
straight north to Coppell High School
on its way to Andrew Brown, Jr.
Community Park West.
Dal-Homa Trail - Dal-Homa Trail
runs along the Elm Fork of the Trinity
River and will provide regional
connection as it goes from downtown
Dallas to lake Texoma. It is unclear
which bank the trail will follow as it
travels north through the'
Coppell/Carrollton area. If it is on the
east bank, Carrollton Will be
responsible for the trail's design,
whereas Coppell will be taking the
lead if the trail ends up on the west
bank.
Due to the city limit line being on the
west bank of the river, the trail might
be "in" Carrollton even if it is on the
west side of the river. The Riverchase
Golf Course will play a significant role
to determine the feasibility of a west
bank routing.
11
DEVELOPMENT REVIEW COMMITTEE
T. FJSURE SERVICES DEPARTMENT COMMENTS
October $1, 1996 'J~l!.i '~ ",,L '-'
R. D. Slayton, Superintendent of Leisure Services~
214/304-3554 FAX 214/304-3547
COMMENT STATUS:
The developer should be aware that he/she will be responsible to contribute towards the City's
parkland dedication fee ordinance of $1,285 per dwelling unit. This preliminary plat is also
affected by the City of Coppell'$ ~ and Bike Trails Master Plan. The corridor along the
Cottonbelt railroad has been designated as the Cottonbelt trail. This important connector trail
will connect the Beltline/Denton Tap trail, Woodhurst linear park/Duck Pond trail, North Lake
trail, and the regional proposed Dalhoma Trail. The developer will be required to construct a
12-foot wide concrete ~ and bike trail in cooperation with the City's Hike and Bike Trail
Master Plan.
ENGINEERING COMMENTS
1TEM:
DRC DATE:
October $1, 1996 and Novembo' 7, 1996
CONTACT: ~ftke Martin, E. L T., Assistant City Engineer (304-3679)
Informational Comments Only:
Any encroachment into DART right-of-way, including drainage, will require a
permit from DART.
Need a letter from TRA granting permission to construct on their easement, this
includes paving and trees.
Site Plan Comments:
As requested review the existing traffic study from 1994 to determine what traffic
impact this development will have and if a deceleration lane will be needed.
DEVELOP RE W COMMIZT F.
DRC DATE: Octol~er $1, 1~
1. All portions of buildings to be within a 150feet hose lay distance from afire
lane.
2. All portions of buildings to be within a 150feet hose lay distance from afire
hydrant.
3. All fire lanes to be dedicated on plat.
4. Minimum inside radius on fire lanes to be 30feet. Minimum outside radius
is to be 50feet.
5. All Group R, Division 1 Occupancies shall be equipped with an approved,
hydraulically designed automatic fire sprinkler system. Residential or quick
response standard sprinklers shall be used in the dwelling units and guest room
portions of the building.
6. An approved fire alarm system shall be installed.
7. Any gate across a fire lane shall be equipped with an Opticon system with a
Knox over-ride in case of power failure.
8. No dead end fire lanes over 50 fl long allowed without an approved apparatus
turn around.