Loading...
St Ann Catholic-CS00051705/17/00 15:~7 'g~972~933503 CENTEX ST A~ ~ 001 CENTEX CONSTRUCTION COMPANY, INC._ Mgmorandum To: Lanny Allison CITY OF COPPELL 255 Parkway Blvd. P.O. Box 478 Copp¢ll, Texas 75019-4409 From: Forrest Harrison Superintendent Date: May 17, 2000 04:43'57 PM Project: St. Ann Catholic Church Subject: ED Ball Comtruction Safety at Entrance Confirming our conversation at I 1:15 Am about Ed Bell construction, They removed West entrance to retail center and using our barricades to block 4'-5' drop offof Sandy Lake road. Centex advised xve would not be responsible for this situation and Ed Bell needed to provide his or, aa barricades. Upon call back You advised You had talked with the city inspector for that project, advising Him of the situation and He would be getting with Me and Ed Bell construction.