Loading...
St Ann Catholic-CS 990915. . , Coppell, Texas 75019 September 15, 1999 James A. Koch, Jr., P.E. Pacheco Koch Consulting Engineers FILE 9401 LBJ Freeway, Suite 300 Dallas, Texas 75243 RE: St. Ann Catholic Chnreh Addition Fee Assessment Letter Dear Mr. Koch: Enclosed is a copy of the City of Coppell Roadway Impact Fee Calculation sheet for the referenced development. Please make payment to the City of Coppell in the mount of $6,528.60 and forward to the Finance Department along with a copy of the Fee Calculation sheet. Given that your construction plans show no new water taps, water and wastewater impacts are not being assessed. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kent M. Collins, P.E. Civil Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services ROADWAY IMPACT FEE CALCULATIONS PROJECT: St. Ann Catholic Church Addition DATE: 09/13/1999 ROADWAY IMPACT FF.F.: Service Area * 3 Category ** Institutional Land Use ** Church/Synagogue Building Area (st) 41,850 Development Units ** 41.85 Vehicle Miles per Development Unit ** 0.52 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $6,528.60 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)