St Ann Catholic-CS 961226 DEVELOPMENT ItE VIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: ~,ttai,. m ~t' - .4'~- ~'~ ' ....... · ~ ck~ge from ~SF-9 ~
F~9, S~ Use Pe~), ~ pm~ ~e ~ ~g on ~e
pm~ ~ ~e ~g ck~h b~g ~ ~ ~ a ~co
~r ~h on ~e n~ b~g, ~ed ~ ~e ~e~ comer of
~ ~ ~ ~ ~el ~, ~ ~e ~e~ of H~ ~weH
~ ~~s, Inc.
DRC DATE: December 26, 1996 and January 2, 1997
CONTACT: Mike Martin, E.L T., Assistant City Engineer 004-3679)
COMMENT STATUS: ./'PRELIMINARY
See Replat for comments.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: S~tst A~m"~ t~elt¥~:lffl~ m allmv the development
of a ckurck and playing fields on 19.522 acres of property, located at
the northeast corner of Sandy Lake Road and Samuel Blvd., at the
request of Harry Rowell and Associates, Inc.
DRC DATE: December 26, 199~ and January 2, 1997
CONTACT: Mike Martin, E.I.T., Assistant City Engineer ($04-$679)
COMMENT STATUS: ,/'PRELIMINARY
1. Show correct visibility sight triangle easements at all ingress/egress points.
2. Provide drainage plans.
3. Impact fees required.
4. Provide water, sewer and drainage plans.
5. Coordinate elevations along the south side with the proposed elevations of Sandy Lake
Road.
6. Construct sidewalk along Samuel Blvd.