Loading...
St Ann Catholic-CS 930915 IVIEMORANDUIVI ~-~~ To: Taryon Bowman, Planning and Zoning Coordinator From: Kenneth M. Griffin, P.E., City Engineer RE: FINAL Engineering Comments for DRC 8/26/93 & 9/2/93 Date: September 15, 1993 7. Replat of St. Ann's Catholic Church Addition - located at northeast comer of Sandy Lake Road and Samuel Blvd. 1. Additional right-of-way may be required if Council accepts the concept of the ALLWAYS Program. The Engineering Department requests that an additional 5 foot of right-of-way be provided on the replat in the event the ALLWAYS Program is implemented along Sandy Lake Road. 2. A signature block should be provided for the Floodplain Administrator. 3. The adjacent property on the south side of Sandy Lake is incorrect. This should be corrected.