PA9701-CS 961204DALLAS COUNTY
COMMISSIONER PRECINCT NO, 1
JIM JACKSON
FAX TRANSMITTAL
DATE: /~' ~f
TO:/~//?F'/N~FT/F/
DE PARTMENT: ,,5'x/'./'/X/--rt.,,f 7
FAX ,,: -?P~
NUMBER OF PAGES:
(including cover page)
FROM:
TEL. #:
COMMENTS:
SF, RVICE CENTER: u 231 ! JOE FIELD * DALLAS, TEXAS 75229 · (~14) 247-1735
COUNTY ADMYNISTRATION BUILDING; · 411 ELM STREET · DALLAS, TEXAS 75202 · (214)
WEST PARK
Coppell Middle School
City of Coppell
ESTIMATE
Phase 1
950' X 24' / 9 =
Phase 1I
1400' X 24' / 9 --
Phase III
350'X65'/9 =
Phase IV
550'X14'/9 =
Phase V
700' X 38' / 9 ~
Phase V[
300' X 33' / 9 ~
TOTAL
2,533.33 SY X $2.85/SY = $7,219.99
3,733.33 SY X $2.85/SY =- $10,639.99
2,527.77 SY X $2.85/SY = $7,204.14
855.55 SY X $2.85/SY = $2,438.32
2,955.55 SY X $2.85/SY = $8,423.32
1,100.00 SY X $2.85/SY
= S3.135.00
$39,060,76
NOTE:
Haul cost for 150 CY of RAp included in Phase VI, which must be done first.
ESTIMATE
BUS PARKING LOT
Wrangler Road
City of Coppell
Haul Cost and Placement of 1,419 Cubic Yards of RAP
Labor and Equipment for Application of ARE 6g and Premo
Materials (ARE 68 and Prcmo)
Total Estimated Cost
3,080.00
5,207.76
$21,502.46
City Responsibilities:
I ) City will be responsible for drainage. City to check and insure that raising the
elevation of the parking lot by 6 inches will not flood the school building.
2) City will clear the parking lot orbuses and work shed.
3) City to consider removing ~curity fencc and replacing it after completion of work
on parking lot.
/
i:,, c ,,j"