Loading...
PA9701-CS 961204DALLAS COUNTY COMMISSIONER PRECINCT NO, 1 JIM JACKSON FAX TRANSMITTAL DATE: /~' ~f TO:/~//?F'/N~FT/F/ DE PARTMENT: ,,5'x/'./'/X/--rt.,,f 7 FAX ,,: -?P~ NUMBER OF PAGES: (including cover page) FROM: TEL. #: COMMENTS: SF, RVICE CENTER: u 231 ! JOE FIELD * DALLAS, TEXAS 75229 · (~14) 247-1735 COUNTY ADMYNISTRATION BUILDING; · 411 ELM STREET · DALLAS, TEXAS 75202 · (214) WEST PARK Coppell Middle School City of Coppell ESTIMATE Phase 1 950' X 24' / 9 = Phase 1I 1400' X 24' / 9 -- Phase III 350'X65'/9 = Phase IV 550'X14'/9 = Phase V 700' X 38' / 9 ~ Phase V[ 300' X 33' / 9 ~ TOTAL 2,533.33 SY X $2.85/SY = $7,219.99 3,733.33 SY X $2.85/SY =- $10,639.99 2,527.77 SY X $2.85/SY = $7,204.14 855.55 SY X $2.85/SY = $2,438.32 2,955.55 SY X $2.85/SY = $8,423.32 1,100.00 SY X $2.85/SY = S3.135.00 $39,060,76 NOTE: Haul cost for 150 CY of RAp included in Phase VI, which must be done first. ESTIMATE BUS PARKING LOT Wrangler Road City of Coppell Haul Cost and Placement of 1,419 Cubic Yards of RAP Labor and Equipment for Application of ARE 6g and Premo Materials (ARE 68 and Prcmo) Total Estimated Cost 3,080.00 5,207.76 $21,502.46 City Responsibilities: I ) City will be responsible for drainage. City to check and insure that raising the elevation of the parking lot by 6 inches will not flood the school building. 2) City will clear the parking lot orbuses and work shed. 3) City to consider removing ~curity fencc and replacing it after completion of work on parking lot. / i:,, c ,,j"