Loading...
St Ann Catholic-CS 930809To: Taryon Bowman, Planning and Zoning Coordinator From: Kenneth M. Griffin, P.E. , City Engineer ~,~ RE: Engineering Comments for DRC 7/29/93 & 8/5/93 Date: August 9, 1993 1. Replat of St. Ann's Catholic Church Addition - located at northeast corner of Sandy Lake Road and Samuel Blvd. No additional platting information has been submitted for this. However, the same comments previously provided are still applicable. 1. The usage on the south side and west side of the proposed replat should be provided. 2. The existing fight-of-way for Sandy Lake Road, both entire right-of-way and fight-of- way from center line, should be shown. 3. Additional fight-of-way may be required if Council accepts the concept of the ALLWAYS Program. The Engineering Department requests that an additional 5 foot of fight-of-way be provided on the replat in the event the ALLWAYS Program is implemented along Sandy Lake Road. 4. The above comments were provided at the 5/27/93 DRC. In addition to the above comments, at our meeting today, there was discussion of why sidewalks are required along Samuel Blvd. Basically, when this property is replatted, the Engineering Department considers it a developed lot because it has an existing church on the lot. If St. Ann's Catholic Church chooses not to construction the sidewalk, then they should request a variance from the City Council. 2. S-1007 (A) - SUP Site Plan amendment for Tom Thumb Shopping Center - located at the southeast corner of MaeArthur and Beltllne. 1. Additional information should be provided concerning the turning radius for vehicles trying to enter the stacking area for the drive through tellers.