Loading...
St Ann Catholic-CS 880408 P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future' 214- 462-0022 adaie Keney APR O_ 1988 Paul S. Unzicker, Inc. 8700 Sten~nons Pr,~'. S~te 400 PAUL S, UNZICKER, IflC. ~1~, ~ 75247 CONSULTING ENGINEERS, RE: Inspection Fee for St. Ann's Catholic Church Dear Ms. Kelley: As per information submitted to me by Hall & Nelms Inc. for construction costs: Water - North $15,882.00 Water - South $11,04 0.00 Sanitary Sewer $1500.00 Paving $2162.00 TOTAL $30,584.00 Inspection Fee of 1.5% -- ~~ The inspection fee is due and payable upon receipt of this assessment letter. Please make remittance payable to the City of Coppell and send it with a copy of this letter to the attention of the Finance Department. Thank you. Chief ~-~alopmental Inspector S~M/bb cc: Steve Goram, D~rector of Public Works