St Ann Catholic-CS 880229 ~' ;~ P.O. Box 478
214 - 462 - 0022
--'. ] The City With A Beautiful Future
'~ ' PRE-CONSTRUCTION PACKET
/
TIME: ~'(.,O(_.P,,,.~,.
ATTENDANCE SHEET
NAME: COMPANY: PHONE:
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
PROJECT NAME: ~?'7 /,~,'/~'~
DATE: ~/Z
~I~E : -/,! .~ r"~
I. ATTE~D~CE: (See Attached
II. PLA~S FHR~ISHED TO: A) CITY YES
B) CO~T~CTOR YES
C) O~ER YES ~0 ~'
III. UTILITY CO~IES ~OTIFIED:
~) TELEPUO~E ~
B) GAS
C) ELECTRIC
D) C~LE T.V.
E) OZ~E~
IV. STA~S OF RIGHT-OF-WAY ~/OR LA~ DOCENTS:
EAS~ENTS YES NO
HIG~AY PE~IT YES NO
~ILRO~ PE~IT YES NO
STREET CUT PE~IT YES NO
BORING PE~IT YES NO
V. INSPECTION:
A. DAILY INSPECTION BY ASSIGNED INSPECTOR
B. AFTER HOURS ~ ~EKENDS (OVERTI~) TO
BE PAID BY THE CO~CTOR "AT OVERTI~
~TES".
C. CONT~CTOR ~ S~-CONT~CTORS TO NOTI~
INSPECTOR AT L~ST ~-FO~ (24) HO~S
BEFO~ WAT~/S~IT~Y S~R/STO~ S~R/
PAVING CONS~UCTION BEGINS.
(2)
LETTER OF ACCEPTANCE WRITTEN DATE:
LETTER OF ACCEPTANCE WILL NOT BE WRITTEN UNTIL THE PUNCH LIST MADE FROM
THE WALK-THROUGH HAS BEEN COMPLETED AN~ RE-INSPECTED BY THE RESPECTIVE
DEPARTMENTS.
THIS INCLUDES SUBMITTING: AS-BUILTS, BONDS, AND PAYING PRO-RATA.
PRE-CONSTRUCTION NOTES
DEFICIENT PAVEMENT, STRENGTH, THICKNESS.
SCREEN WALL.
DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER TO
THE CITY OF COPPELL ENGINEERING DEPARTMENT.
CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL REPORTS
ARE RECEIVED.
COR-TEN BOLTS IN FITTINGS.
FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER.
STEPS IN MANHOLES.
MUELLER VALVES AN~ HYDRANTS - 4" BURY ON HYDRANTS.
MUELLER BRASS OR FORD IF MUELLER NOT AVAILABLE.
FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS).
COLOR CODE HUDRANTS, TOP BONNET AND CAPS.
CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE ENGINEERING
DEPARTMENT.
TEMPORARY SANITARY FACILITIES.
CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS).
LANDSCAPE COMMITTMENT.
LANDSCAPE MAINTENANCE AGREEMENT.
(5)
PRE. CNSTRCTN.
PZAGN
VI. TESTING OF MATERIALS:
1. DENSITIES
2. APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES ~
4. A~PROV~D_A~AT.T_BATCII BE$ION .....
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII. STREET CLOSING REQUIRED: YES NO
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN ADVANCE.
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED YES NO
B. TRAFFIC DETOUR YES NO
C. WARNING LIGHTS YES NO
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE
BARRICADES AND/OR REPLACE A~ BARRICADES, THE CON-
TRACTOR WILL BE CHARGED FOR THEIR TIME.
IX. AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
X. INFORMATION:
DEVELOPER:
NAME:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME: P~U~ 5 ~Jg ~ ¢ ~C ~J INC.
ADDRESS: ~ '?~.~ 5'~-/v,/~:~
PHONE: f~ -
PROJECT ENGINEEr: jC~C ~
(~
GENERAL CONTRACTOR:
PHONE
EXCAVATING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
PAVING CONTRACTOR:
ADDRESS:
PHONE:
SUPERINTENDENT
UTILITY CONTRACTOR:
X. GENERAL: DATE
AS-BUILT DRAWINGS - UTILITIES
1 - MYLAR 3 - BLUE LINES
AS-BUILT DRAWINGS - PAVING, DRAINAGE
1 - MYLAR 3 - BLUE LINES
MAINTENANCE BOND - UTILITIES
PRO-RATA WORK SHEET COMPLETED/
STREET ASSESSMENTS
WATER AND SEWER FINALED
PAVING AND DRAINAGE FINALED
DEVELOPMENT INSPECTION FEE:
(4)