Loading...
St Ann Catholic-CS 880229 ~' ;~ P.O. Box 478 214 - 462 - 0022 --'. ] The City With A Beautiful Future '~ ' PRE-CONSTRUCTION PACKET / TIME: ~'(.,O(_.P,,,.~,. ATTENDANCE SHEET NAME: COMPANY: PHONE: CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE PROJECT NAME: ~?'7 /,~,'/~'~ DATE: ~/Z ~I~E : -/,! .~ r"~ I. ATTE~D~CE: (See Attached II. PLA~S FHR~ISHED TO: A) CITY YES B) CO~T~CTOR YES C) O~ER YES ~0 ~' III. UTILITY CO~IES ~OTIFIED: ~) TELEPUO~E ~ B) GAS C) ELECTRIC D) C~LE T.V. E) OZ~E~ IV. STA~S OF RIGHT-OF-WAY ~/OR LA~ DOCENTS: EAS~ENTS YES NO HIG~AY PE~IT YES NO ~ILRO~ PE~IT YES NO STREET CUT PE~IT YES NO BORING PE~IT YES NO V. INSPECTION: A. DAILY INSPECTION BY ASSIGNED INSPECTOR B. AFTER HOURS ~ ~EKENDS (OVERTI~) TO BE PAID BY THE CO~CTOR "AT OVERTI~ ~TES". C. CONT~CTOR ~ S~-CONT~CTORS TO NOTI~ INSPECTOR AT L~ST ~-FO~ (24) HO~S BEFO~ WAT~/S~IT~Y S~R/STO~ S~R/ PAVING CONS~UCTION BEGINS. (2) LETTER OF ACCEPTANCE WRITTEN DATE: LETTER OF ACCEPTANCE WILL NOT BE WRITTEN UNTIL THE PUNCH LIST MADE FROM THE WALK-THROUGH HAS BEEN COMPLETED AN~ RE-INSPECTED BY THE RESPECTIVE DEPARTMENTS. THIS INCLUDES SUBMITTING: AS-BUILTS, BONDS, AND PAYING PRO-RATA. PRE-CONSTRUCTION NOTES DEFICIENT PAVEMENT, STRENGTH, THICKNESS. SCREEN WALL. DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER TO THE CITY OF COPPELL ENGINEERING DEPARTMENT. CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL REPORTS ARE RECEIVED. COR-TEN BOLTS IN FITTINGS. FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER. STEPS IN MANHOLES. MUELLER VALVES AN~ HYDRANTS - 4" BURY ON HYDRANTS. MUELLER BRASS OR FORD IF MUELLER NOT AVAILABLE. FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS). COLOR CODE HUDRANTS, TOP BONNET AND CAPS. CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE ENGINEERING DEPARTMENT. TEMPORARY SANITARY FACILITIES. CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS). LANDSCAPE COMMITTMENT. LANDSCAPE MAINTENANCE AGREEMENT. (5) PRE. CNSTRCTN. PZAGN VI. TESTING OF MATERIALS: 1. DENSITIES 2. APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES ~ 4. A~PROV~D_A~AT.T_BATCII BE$ION ..... SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES NO IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED YES NO B. TRAFFIC DETOUR YES NO C. WARNING LIGHTS YES NO IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE A~ BARRICADES, THE CON- TRACTOR WILL BE CHARGED FOR THEIR TIME. IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY. X. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: P~U~ 5 ~Jg ~ ¢ ~C ~J INC. ADDRESS: ~ '?~.~ 5'~-/v,/~:~ PHONE: f~ - PROJECT ENGINEEr: jC~C ~ (~ GENERAL CONTRACTOR: PHONE EXCAVATING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: PAVING CONTRACTOR: ADDRESS: PHONE: SUPERINTENDENT UTILITY CONTRACTOR: X. GENERAL: DATE AS-BUILT DRAWINGS - UTILITIES 1 - MYLAR 3 - BLUE LINES AS-BUILT DRAWINGS - PAVING, DRAINAGE 1 - MYLAR 3 - BLUE LINES MAINTENANCE BOND - UTILITIES PRO-RATA WORK SHEET COMPLETED/ STREET ASSESSMENTS WATER AND SEWER FINALED PAVING AND DRAINAGE FINALED DEVELOPMENT INSPECTION FEE: (4)