Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Summit P1-LR 961121
GEOTECHNICAL AND G F~ r'-I LJ ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT The Summit at the Springs Bethel Road, West of Denton Tap Coppell, Texas REPORTED TO: Baptist Foundation of Texas cio Fults/Oncor 9400 North Central Expressway, 5th Floor Dallas, Texas 75231-5037 ATTN: Mr. Bruce R. Heller REPORT NO. 21 REG PROJECT NO. 2910.1 SAMPLE DATE: 11-21-96 TECHNICIAN: H. Johnson CONTRACTOR: Mado Sinacola & Sons Location of Sample 1 Paving - STA 15+45, Armstrong Boulevard 36/500 yds 2 Paving - STA 0+50, Stanton Court 172/500 yds 3 Paving - STA 4+75, Stanton Court 308/500 yds 4 Paving - STA 5+90, Stanton Court 466/500 yds Design Information ................................ ................................ I ........................................ 1 On site517 3600 2 On site517 3600 3 On site517 3600 4 On site517 3600 Test Results 1 8086 11-28-96 7 87300 3090 8086 11-28-96 7 83700 2960 3030 8086 12-19-96 28 102000 3610 8086 12-19-96 28 103400 3660 3650 2 8087 11-28-96 7 87400 3090 8087 11-28-96 7 72400 2560 2830 8087 12-19-96 28 103600 3670 8087 12-19-96 28 111600 3950 3810 3 8088 11-28-96 7 90700 3210 8088 11-28-96 7 79300 2810 3010 8088 12-19-96 28 117000 4140 8088 12-19-96 28 111900 3960 4051 2424 STUTZ DR. · SUITE400 ·DALLAS, TX75235 · TEL[214] 350 5600 · FAX[214] 350 0019 4 8089 11-28-96 7 86500 3060 8089 11-28-96 7 91300 3230 3150 8089 12-19-96 28 114600 4060 8089 12-19-96 28 108900 3850 3960 Cylinder Data 1 8086 4.50 58 61 5.2 08:30 AM N/A 2 8087 4.50 60 61 5.4 11:20 AM N/A 3 8088 4.50 69 71 5.4 01:00 PM N/A 4 8089 4.50 69 71 5.2 03:15 PM N/A Distribution: (1) Fults/Oncor/Mr. Bruce Heller (1) Baptist Foundation/Mr. Mike Wagner (1) Dowdey-Anderson & Associates, Inc./ Mr. Bill Anderson (1) Mario Sinacola & Sons/ Mr. Charles Adams (1) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KENcdl