Loading...
Summit P1-LR 961025GEOTECI-INICAL AND G ~ O I I F~ E NVIIIONI"IENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS The Summit at the Springs Bethel Road, West of Denton Tap Coppell, Texas REPORTED TO: Baptist Foundation of Texas c/o Fults/Oncor 9400 North Central Expressway, 5th Floor Dallas, Texas 75231-5037 ATTN: Mr. Bruce R. Heller REPORT NO. 7 REPORT DATE: 10-25-96 REG PROJECT NO. 2910.1 TECHNICIAN: B. Ray CONTRACTOR: Mario Sinacola & Sons I D-698 Dark brown silty sandy clay 15.2 104.7 2 D-698 Reddish-brown sandy clay 15.2 104.3 3 D-698 Light brown clayey sand 14.5 113.4 4 D-698 Dark brown silty clayey sand 15.0 110.0 45 10-03-96 Line A/ 4.0 103.8 15.4 2 99.5 STA 5+50(1) 46 Line A/ 3.0 107.0 14.5 4 97.3 STA 2+00(1) 47 10-10-96 Line H/ 5.0 105.7 14.5 4 96.1 STA 11+85(1) 48 Service line/ 4.5 99.8 17.2 1 95.3 Block C/Lot 9(2) 49 Main line crossing/ 2.0 104.7 16.5 1 100.0 Edmondson Drive/ 15'S of Lot 13(2) 50 Main line/ 0.5 100.2 17.1 1 95.7 Block C/Lot 12(2) 51 Line H/ 2.0 102.2 17.2 1 97.6 STA 12+10(1) 52 Main line S. of 1.5 100.6 17.2 2 96.5 Block B/Lot 35(2) 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 53 10-10-96 Line H/ 1.5 99.8 16.9 1 95.3 STA 12+70(1) 54 Line H/ 4.0 106.9 15.8 4 97.2 STA 12+85(1) 55 Line Hi 1.5 102.5 17.2 1 97.9 STA 14+00(1) 56 Line H/ 3.5 101.9 15.9 1 98.3 STA 14+10(1) 57 Service Line to 4.0 103.0 14.6 2 98.8 Block B/Lot 20(2) 60'W of main line 58 Service line to 3.0 100.4 16.1 2 96.2 Block B/Lot 20 70'W of main line(2) 59 Main line in front 0.5 102.3 13.2 2 98.1 of Block B/ Lot 33(2) 60 Main line in front 2.0 106.3 15.8 4 96.6 Block B/Lot 29(2) Comments: VVhere tested, materials were in compliance with project specifications. Footnotes: (1) Test performed on sanitary sewer line backfill. (2) Test performed on water line backfill. Distribution: (1) Fults/Oncor/Mr. Bruce Heller (1) Baptist Foundation/Mr. Mike Wagner (1) Dowdey-Anderson & Associates, Inc./ Mr. Bill Anderson (1) Mario Sinacola & Sons/ Mr. Charles Adams ~'~) City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. RFR/msm