Summit P1-LR 961023SINACOLA 6 SONS TEL:214-456-8564
Oct
25 96
13:$2 No.O09
P .02
CONCRETE BATCH DESIGN
CLIENT: BRANCH PROPERTIES. INC.
PROJECT: SUMMIT AT THE SPRINGS
cc:
Joe
Sandra
Root
File No. 6029
City of COPPELL
Dowdy. Anderson
DATE: 10/23196
REQUIRED STRENGTH:
REQUIRED SLUMP:
AIR CONTENT:
CONCRETE TEMP:
WATER/CEMENT RATIO:
3000 Psi ~ 28 Days (5.0 sack mix) ~,
.
3 +/- 1" , k
0.353 (baSed on total cementitious mti) ~
MATERIALS
Cement
Fly Ash
Course Aggr.
Fine Aggr.
AEA
WRA
TYPE & SIZE
Type I
Class C
1-1/2"-il4
~/4-0
Air Entrainment Agent
Water Reducing Agent
_S. SD Lbs. ACTUAI.~ATJT,~
(1 cu. yd.) (1 cu. yd.)
Cement 376 376
Fly Ash 118 118
Course Aggr. 1800 1800
Fine Aggr. 1440 1440
Water (3.84 gal/sk) 168 168
AEA 5.5 oz 5.5 oz
WRA 14.1 oz 14.1 oz
NOTE:
5.26 Sacks of Total Cementitious Material
20 % Cement Replacement (~ 1.25 lbs of Flyash ._.Replac.!.n[~ 1.0 Ib~, of Cement
Add 1/2 Sack of Cement if required for Hand Placement of Concrete
JEI~R~COPPELIL.WK4