Loading...
Summit P1-LR 961203GEOTECHNICAL AND J~j JJ~J I""1 ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT The Summit at the Springs Bethel Road, west of Denton Tap Coppell, Texas REPORTED TO: Baptist Foundation of Texas REPORT NO. 24 c/o Fults/Oncor REG PROJECT NO. 2910.1 9400 North Central Expressway, SAMPLE DATE: 12-03-96 5th Floor TECHNICIAN: H. Johnson Dallas, Texas 75231-5037 ATTN: Mr. Bruce R. Heller CONTRACTOR: Mario Sinacola & Sons Location of Sample 1 Paving - STA 3+50, Edmondson Drive 24~597 yds 2 Paving - STA 13+30, Armstrong and STA 0+00, 178/597 yds Edmondson Drive 3 Paving - south bound lane, STA 9+00, Armstrong 322/597 yds Blvd. 4 Paving - east bound lane, STA 0+90, Armstrong 472/597 yds Blvd. Design Information 1 On site 517 3600 2 On site 517 3600 3 On site 517 3600 4 On site 517 3600 Test Results 1 8191 12-10-96 7 76900 2720 8191 12-31-96 28 114300 4050 8191 12-31-96 28 126600 4480 4270 8192 12-10-96 7 89800 3180 8192 12-31-96 28 116800 4130 8192 12-31-96 28 116600 4130 4130 8193 12-10-96 7 87900 3110 8193 12-31-96 28 116100 4110 8193 12-31-96 28 119500 4230 4170 242~. STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 4 8194 12-10-96 7 95600 3380 8194 12-31-96 28 117900 4170 8194 12-31-96 28 117800 4170 4170 Cylinder Data 1 8191 2.00 38 41 5.4 07:30 AM N/A 2 8192 2.50 38 50 5.2 10:00 AM N/A 3 8193 4.50 43 49 5.4 12:30 PM N/A 4 8194 4.00 49 53 5.2 02:30 PM N/A Distribution: (1) Fults/Oncor/Mr. Bruce Heller (1) Baptist Foundation/Mr. Mike Wagner (1) Dowdey-Anderson & Associates, Inc./ Mr. Bill Anderson (1) Mario Sinacola & Sons/ Mr. Charles Adams ~ City of Coppell/Mr. Larry Davis Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KEA/cdl