Summit P1-LR 961203GEOTECHNICAL AND J~j JJ~J I""1
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
The Summit at the Springs
Bethel Road, west of Denton Tap
Coppell, Texas
REPORTED TO: Baptist Foundation of Texas REPORT NO. 24
c/o Fults/Oncor REG PROJECT NO. 2910.1
9400 North Central Expressway, SAMPLE DATE: 12-03-96
5th Floor TECHNICIAN: H. Johnson
Dallas, Texas 75231-5037
ATTN: Mr. Bruce R. Heller
CONTRACTOR: Mario Sinacola & Sons
Location of Sample
1 Paving - STA 3+50, Edmondson Drive 24~597 yds
2 Paving - STA 13+30, Armstrong and STA 0+00, 178/597 yds
Edmondson Drive
3 Paving - south bound lane, STA 9+00, Armstrong 322/597 yds
Blvd.
4 Paving - east bound lane, STA 0+90, Armstrong 472/597 yds
Blvd.
Design Information
1 On site 517 3600
2 On site 517 3600
3 On site 517 3600
4 On site 517 3600
Test Results
1 8191 12-10-96 7 76900 2720
8191 12-31-96 28 114300 4050
8191 12-31-96 28 126600 4480 4270
8192 12-10-96 7 89800 3180
8192 12-31-96 28 116800 4130
8192 12-31-96 28 116600 4130
4130
8193 12-10-96 7 87900 3110
8193 12-31-96 28 116100 4110
8193 12-31-96 28 119500 4230
4170
242~. STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019
4 8194 12-10-96 7 95600 3380
8194 12-31-96 28 117900 4170
8194 12-31-96 28 117800 4170 4170
Cylinder Data
1 8191 2.00 38 41 5.4 07:30 AM N/A
2 8192 2.50 38 50 5.2 10:00 AM N/A
3 8193 4.50 43 49 5.4 12:30 PM N/A
4 8194 4.00 49 53 5.2 02:30 PM N/A
Distribution: (1) Fults/Oncor/Mr. Bruce Heller
(1) Baptist Foundation/Mr. Mike Wagner
(1) Dowdey-Anderson & Associates, Inc./
Mr. Bill Anderson
(1) Mario Sinacola & Sons/
Mr. Charles Adams
~ City of Coppell/Mr. Larry Davis
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
KEA/cdl