Loading...
Summit P1-CS 951207DEVELOPMENT REVIEW COMMIITEE ENGINEERING COMMENTS ITEM: PD-IOSR. S_m'ings of Co__vpeH. zoning clumge from "PD-LI" (Planned DevdopmoU, Residential), to moa~fy tl~ planned development to a~ow the development of single-family detached komes on a 29. 884 acres tract of land located on the south side of Bethel Road, appro~~ 490 feet west of Denton Tap Roa~ at the request of Fu~ Associates, Inc. DRC DATE: November $0, 1995 & December 7, 1995 CONTACT: Ken Grifj~ P.E., As~ City Manager/City Engineer (304-3679) COMMENT STATUS: PRELIMINARY ~FINAL SUBSEO. UENT TO 1. A floodplain reclamation study will be required. 2. The the various cul-de-sacs could pose a problem for fire tracks. 3. There will be no parking on the street for lots adjacent to the narrow paving for the streets and cul-de-sacs.