Loading...
Summit P1-CS 890727TO GINN, INC. Consulting Engineer~ 17103 Preston Road Suite 100, LB-118 DALLAS, TEXAS 75248 (214) 248-4900 WE ARE SENDING YOU [j~ [] Shop drawings [] Copy of letter Attached [] Under separate cover via/, the following items: [] Prints [] Plans [] Samples [] Specifications [] Change order ,j~ ~/o/-,~ ~'~'~'~ ('0~ COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: [] For approval [] For your use [] As requested [] For review and comment [] FOR BIDS DUE [] Approved as submitted [] Resubmit copies for approval [] Approved as noted [] Submit copies for distribution [] Returned for corrections [] Return corrected prints 19__ [] PRINTS RETURNED AFTER LOAN TO US ~'ORK DIRECTIVE CHANGE (Instructions on reYerse side) No." 378-727 PROJECT: Denton Tap Road ImprovementsDATE OF ISSUANCE: from Belt Line Road to Sandy Lake Road OWNER' City of Coppell (Name. P.O. Box 478 Address) Coppell, TX 75019 CONTRACTOR: L.H. Lacy Co. OWNER's Project No. P.O. Box 541297 Dallas, TX 75354-1297 ENGINEER: Ginn, Inc. Paving, Dra-inage and CONTRa. CT FOR:Bridge Improvements ENGINEER's Project No. 7/27/89 378 You are directed to proceed promptly with the following change(s): Deschption: Construct the northbmmd left turn lane beginning at Sta. 98 + 57.50 and ending at Sra. 100 + S7.00 as shown on the attached marked sheets 14 of 102 and 15 of 102 dated 7/26/89. Purpose of Work Directive Change: As per Owner's request. Attachments: (list documents supporting change) 1. Owner's directive dated 3/31/89 2. Sheet 14' of 102, marked, dated 7/26/89 3. " 15 of " " " " " " If a claim is made that the above change(s) have affect~l Contract Price or Contract Time, · ny claim for a Change Order based thereon will involve one of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: [] Time and materials :{~ixUnil prices [] Cost plus fixed fee [] Other Estimated increase (decrease) in Contract Price: $ 4~800.00 If the change involves an increase, the esti- mated amount is not to be exceeded with- out further authorization. Method of determining change in Contract Time: [] Contractor's records ~]~Engineer's records [] Other Estimated increase (decrease) in Contract Time: 10 days. If the change involves an increase, the estimated time is not to be exceeded without further autho- rization. RECOMMENDED: AUTHORIZED: by EJ( Dc ~.o 191~..,' F ':q~3 l~d~l', ,,SUBJECT REPLY SIGN / / DATE ....................... SIGNED RECIPIENT: REPLY ON PINK COPY -- RETAIN WHITE COPY -; _ ~ '- - ~10 .... , [ ~-~ No. Revision J By Dote ~-~ --~= C~TY OF COPPELL ~~ ~~~~~ DALLAS COUNTY. TEXAS ~---=- - DENTONTAP ROAD IMP~VEMENTS' PAVINO -' ~' o,~ 95+00 10 STA I00+ O0 ' ' GINN INC .... '-'"~ .- Consult~n~ Engineers as, Texas TO BE RELOCATED BY OTHERS 93+1510~ TAPER I04'" 59'40" 98 + 07.6i END TAPER ! PAVEMENT ''/ SLOPE EASE MEN 2" H.M.A CONCRETE CURB DETAIL AT. RAILROAD iII _-- ~I RO.~.. 98 +0:5.99 FLAT 98 BEGIN TAPER 6.72 END TAPER BY OTHERS OVE AND REPLAC~E I DRAINAGE SHT. 39 I N 7'5'/'.~'$5"K ,06 98 FLAT TO 98 + 09.69 R.R EADER END TAPER TO BE RE[ BY OTHERS NOoO9'34"E I 98 +3 2.25 96+21.90 BEGIN' FLAT TO 6 TAP 171 RELOCATE MAILBOX TO B.C. AS SHOWN. ITEM I00 PROPOSED SLOPE E REPLACE .~- 6" REINF.I CONC. DRIVE PAY ITEM 530.1 £xisf. ~ ,RAI REMOVE SPLIT R, STAGE II CONSTF WITH THREE STR CONSTRUCTION 0 OF PAVING AND D SPLIT RAIL FENC PAY ITEM I00. : ~ 505.' , , ,~r~l~ g~-~ ,.'~L i,.- · ~-, o ( = /~.,-; :_~_ ....... r.~ ........ ~_~.:~ 500 -- [05, .... .... ~ ,~ ~- ~.- ~._~ ~ ...... , "- 42~ ~ ~ ADOED M~IAN OPENING AND LE~ TURN LANE ~ DEM 4/~/~ ~ ~ ~l.~ CHA~ED LO~TION OF MEDIAN OPENING DEM 4/4/~ + ~ ~ No. Revision , By Dote ~ ~ ~ CITY OF CO'ELL --- DALLAS COUNTY, TEXAS ~ DENTON TAP ROAD IMPmVEME'N~,~ ~ PAVING - ' '-"':' '-. '-,. - ~ sTA I~+~ TO STA 105+~ ~- - GIN ' "'"'"' ~ . · .:.~ ~ ~.; · ~ ~ ~,i~'~-ALA': ~. ~ BS o~-DEC., 1987 ~°b ...... '"'~ 25' m MATCH L IN~- STA. I00+00 20' It IOI+IZO0 I01 + 59.68 34' b- 4,4' b-b 15' 101+87.00 II tl.I (,/3 :::) Z LU I-- 0 Z Li= z '-r-