Summit P1-CS 890727TO
GINN, INC.
Consulting Engineer~
17103 Preston Road
Suite 100, LB-118
DALLAS, TEXAS 75248
(214) 248-4900
WE ARE SENDING YOU [j~
[] Shop drawings
[] Copy of letter
Attached
[] Under separate cover via/,
the following items:
[] Prints [] Plans [] Samples [] Specifications
[] Change order ,j~ ~/o/-,~ ~'~'~'~ ('0~
COPIES DATE NO. DESCRIPTION
THESE ARE TRANSMITTED as checked below:
[] For approval
[] For your use
[] As requested
[] For review and comment
[] FOR BIDS DUE
[] Approved as submitted [] Resubmit copies for approval
[] Approved as noted [] Submit copies for distribution
[] Returned for corrections [] Return corrected prints
19__ [] PRINTS RETURNED AFTER LOAN TO US
~'ORK DIRECTIVE CHANGE
(Instructions on reYerse side) No."
378-727
PROJECT: Denton Tap Road ImprovementsDATE OF ISSUANCE:
from Belt Line Road to Sandy Lake Road
OWNER' City of Coppell
(Name. P.O. Box 478
Address) Coppell, TX 75019
CONTRACTOR: L.H. Lacy Co. OWNER's Project No.
P.O. Box 541297
Dallas, TX 75354-1297 ENGINEER: Ginn, Inc.
Paving, Dra-inage and
CONTRa. CT FOR:Bridge Improvements ENGINEER's Project No.
7/27/89
378
You are directed to proceed promptly with the following change(s):
Deschption: Construct the northbmmd left turn lane beginning at Sta. 98 + 57.50
and ending at Sra. 100 + S7.00 as shown on the attached marked sheets 14 of 102
and 15 of 102 dated 7/26/89.
Purpose of Work Directive Change:
As per Owner's request.
Attachments: (list documents supporting change) 1. Owner's directive dated 3/31/89
2. Sheet 14' of 102, marked, dated 7/26/89
3. " 15 of " " " " " "
If a claim is made that the above change(s) have affect~l Contract Price or Contract Time,
· ny claim for a Change Order based thereon will involve one of the following methods of
determining the effect of the change(s).
Method of determining change in
Contract Price:
[] Time and materials
:{~ixUnil prices
[] Cost plus fixed fee
[] Other
Estimated increase (decrease) in Contract
Price: $ 4~800.00
If the change involves an increase, the esti-
mated amount is not to be exceeded with-
out further authorization.
Method of determining change in
Contract Time:
[] Contractor's records
~]~Engineer's records
[] Other
Estimated increase (decrease) in Contract
Time: 10 days. If the change
involves an increase, the estimated time is
not to be exceeded without further autho-
rization.
RECOMMENDED:
AUTHORIZED:
by
EJ( Dc ~.o 191~..,' F ':q~3 l~d~l',
,,SUBJECT
REPLY
SIGN
/ / DATE
....................... SIGNED
RECIPIENT: REPLY ON PINK COPY -- RETAIN WHITE COPY
-; _ ~ '- - ~10
.... , [ ~-~
No. Revision J By Dote
~-~ --~= C~TY OF COPPELL
~~ ~~~~~ DALLAS COUNTY. TEXAS
~---=- - DENTONTAP ROAD IMP~VEMENTS'
PAVINO
-' ~' o,~ 95+00 10 STA I00+ O0
' ' GINN INC .... '-'"~
.- Consult~n~ Engineers as, Texas
TO BE RELOCATED
BY OTHERS
93+1510~
TAPER
I04'" 59'40"
98 + 07.6i END TAPER
!
PAVEMENT ''/
SLOPE
EASE MEN
2" H.M.A
CONCRETE
CURB DETAIL AT. RAILROAD
iII _-- ~I
RO.~..
98 +0:5.99
FLAT
98
BEGIN TAPER
6.72 END TAPER
BY OTHERS
OVE AND REPLAC~E I
DRAINAGE SHT. 39
I
N 7'5'/'.~'$5"K
,06
98
FLAT TO
98 + 09.69 R.R
EADER
END TAPER
TO BE RE[
BY OTHERS
NOoO9'34"E
I
98 +3 2.25
96+21.90 BEGIN'
FLAT TO 6
TAP
171
RELOCATE MAILBOX TO
B.C. AS SHOWN.
ITEM I00
PROPOSED SLOPE
E
REPLACE .~- 6" REINF.I
CONC. DRIVE
PAY ITEM 530.1
£xisf. ~
,RAI
REMOVE SPLIT R,
STAGE II CONSTF
WITH THREE STR
CONSTRUCTION 0
OF PAVING AND D
SPLIT RAIL FENC
PAY ITEM I00.
: ~ 505.'
, , ,~r~l~ g~-~ ,.'~L i,.- ·
~-, o ( = /~.,-; :_~_ ....... r.~ ........ ~_~.:~ 500
-- [05, ....
.... ~ ,~ ~- ~.- ~._~ ~ ...... ,
"- 42~
~ ~ ADOED M~IAN OPENING AND LE~ TURN LANE ~ DEM 4/~/~
~ ~ ~l.~ CHA~ED LO~TION OF MEDIAN OPENING DEM 4/4/~
+ ~ ~ No. Revision , By Dote
~ ~ ~ CITY OF CO'ELL
--- DALLAS COUNTY, TEXAS
~ DENTON TAP ROAD IMPmVEME'N~,~
~ PAVING - ' '-"':' '-. '-,. -
~ sTA I~+~ TO STA 105+~
~- - GIN ' "'"'"'
~ . · .:.~
~ ~.; ·
~ ~ ~,i~'~-ALA': ~. ~ BS o~-DEC., 1987 ~°b ...... '"'~
25'
m
MATCH
L IN~-
STA. I00+00
20'
It
IOI+IZO0
I01 + 59.68
34' b-
4,4' b-b
15'
101+87.00
II
tl.I
(,/3
:::)
Z
LU
I--
0
Z
Li= z '-r-