Loading...
SC-Coppell HS-LR000308 (2) UTILITY & .:. '. L OW PRE$$U/~E AI/~ TEST/~OR GP, AVITY ~A~IT'ARY'$EW£R ..! .,.~:'~i;:': ' Tes'` Procedure: I ?!i Each seclion o~' sewer shall be tested between sucessive manholes. ~.] .... Air snail be inlroduced into the pipeline until 4.0 psl gauge pressure has been reached. ~'~' . ,e.,~ ',nd; Jime Ina flow of air shall be reduced and the internal air pressure shall be maintamec "~ 9er',;,,ee~ 3 5 and 4 5 ps! gauge lot at least two(2) minutes to allow the air temperalure to come .,.. v~.~...,r.~m wire Ina ~emperature of the pipe walls. Pressure in the pipe shall be cons:an'`h' moq,~oreo by a gaL, ge and nose arrangemem separate Irom the hose used ~o intrco~-ce a.~ ..-.'c. :::e: ';e Press=re :n me p,pe shall no', be allowed to exceed 5 psi. &fie; :ne '.emperalure has stabilized and no air leal~s at the plugs have been found, the a~r pressuce sna,. ~e .;sec ',o de,erin:ne the time lapse required for the air pressure to drop to 2 5 ps'. gauge ~! {ne -'.,me lapse req~,red Ior me air pressure to decrease Irom 3.5 Id 2.5 psi exceeds ,.na~ snc,,.,,.~ ... 'ne.'c:!owmg~ao,e Ihe p~pe shall be presumed to be wilhm acceptablelimil$[oriea~,age · '.ne '.:me a~$ec ,$ less IP, an that shown in the lable, me contractor snail make correc".~on$ .... e :ne ear, age ~o acceptable !:,mits :: ',_,ne ,nlo,'ma ion I J J JTest Results lair Tes', jManore: L;ne Station to Station Pipe Size L.F.Tes~ed Time Passed~ Pas.see 1