Loading...
Stoneleigh P2-LR010321 REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite I00 Dallas, Texas 75229 972/620-8911. 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOP, SPRING VALLEY CONSTRUCTION DATE 03/21101 DALLAS, TEXAS PROJECT STONELEIGH (~ RIVERCHASE OUR REPORT NO. 00652-159 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID o~muuu u~x~uuu L~ ~N ~ ~N ~MCE PERCENT NO. DATE DEPTH'~ NUMBER MOI~-'TURE ~ ~ MO~'TLJRE D~*Y ~gI~I~*'TY COMPACI'"ION COMMENT* % PCF % PCF 323 03/21/01 FG-0.4 2 17.5 108.5 17.9 105 96 1-A 324 03/21101 FG-0.8 2 17.5 108.5 18.8 105 97 I-A 325 03/21101 FG-0.4 2 17.5 108.5 18.2 105 97 1-A 326 03./21/01 FG 2 17.5 108.5 20.4 104 95 1-A 327 03/21101 FG 2 17.5 108.5 18.2 105 97 1-A 328 03/21101 FG 2 17.5 108.5 19.5 104 96 1-A TEST LOCATION: 323 15' WEST AND 15' SOUTH FROM NORTHEAST CORNER OF BUILDING PAD #23 324 10' WEST AND 10' NORTH FROM SOUTHEAST CORNER OF BUILDING PAD #25 325 15' NORTH AND 15' EAST FROM SOUTHWEST CORNER OF BUILDING PAD ~23 326 35' EAST AND 30' NORTH FROM SOUTHWEST CORNER OF BUILDING PAD ~t23 327 60' NORTH AND 30' WEST FROM SOUTHEAST CORNER OF BUILDING PAD ~23 328 30' SOUTH AND 30' EAST FROM NORTHWEST CORNER OF BUILDING PAD ~23 1. FILL 'A. IN PLACE PERC~NT MOIS'RJRE AND P~RCENT COMPACTION COMPLY WITH SPECIFICATIONS ~r/ ~'~ /~' // 2. NATURALSUBGRAD~ B. PERCENTCOMPACTIONDO~SNOTCOMI~.YWFII-I~=EClFICATIONS ~SuJ~lltted~ our te~t ree4d~ & rel~lx~ am ~or the ~u~lve ~j~e of b C~ (~1 thor ~1~ re~ ~ fl~ ~ our ~) - of our name & te~ r#ult~ muat recei~ our ~ apploval. Tm moul~ · ~ aP~lt erdy t~ the .ampl~ ~ an4/or offered, Im:l are n~ IndlcMNe of thel~ualll~ of appare~ly~cal ~ ~lmiar ,~oectmen~. Geotechnical Engineerfng · Construction Mater~als Testing · Envfronrnentel Engineedng · Consulting ALPHA TESTING, INC. 2209 Wl~onsin St., Suite 100 Dallas, Texas 75229 972/620-8911-972/263-4937 (Metro) DAILY FIELD REPORT FAX: 972/406-8023 TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 03/21/01 DALLAS, TEXAS PROJECT: STONELEIGH ~ RIVERCHASE OUR REPORT NO: 00652-160 COPPELL, TEXAS TECHNICIAN: J.S. WEATHER: SUNNY TEMPERATURE RANGE: 60 TO 65 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. THE TECHNICIAN OBTAINED 3 SETS OF 4 CLIENT MADE CYLINDERS PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: BUILDING #23, NORTHEAST CORNER 10' IN SET ~2: BUILDING #23, CENTER OF MIDDLE BREEZEWAY SET #3: BUILDING #23, SOUTHWEST CONRER 5' IN THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED WORK, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting