Stoneleigh P2-LR010319 ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
972/620-8911- 972/263-4937 (Metro) DAILY FIELD REPORT
FAX: 972/406-8023
TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 03/19/01
DALLAS, TEXAS
PROJECT: STONELEIGH @ RIVERCHASE OUR REPORT NO: 00652-155
COPPELL, TEXAS
TECHNICIAN: J.S.
WEATHER: CLOUDY TEMPERATURE RANGE: 50 TO 55
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE AS REQUESTED TO
MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED.
THE TECHNICIAN OBTAINED 3 SETS OF 4 CLIENT MADE CYLINDERS
PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: PAVING "E", 40' FROM SOUTH END OF PARKING IN FRONT OF BUILDING #19
SET #2: PAVING "E", CENTER OF FIRE LANE AT BUILDING #20
SET #3: PAVING "E", CENTER OF FIRE LANE IN FRONT OF G1-A
THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING.
LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT.
~AT THE COMPLETION OF THE SCHEDULED WORK, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
~CC:
LARRY DAVIS, CITY OF COPPELL
LANNY ALLISON, CITY OF COPPELL
~JAN BERTRAND, CITY OF COPPELL
ALPHA The use of c~r name a~ test results must re~ive our ~en approval Test results an~ repo~s apply only Io the samples tested an~lor o~se~e~, an~ are not ~nOl~bve of 1~ quehLes of
Geotechnical Engineering 0 Construction Materials Testing 0 Environmental E~gineering 0 Consulting