Loading...
Stoneleigh P2-LR010319 ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911- 972/263-4937 (Metro) DAILY FIELD REPORT FAX: 972/406-8023 TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 03/19/01 DALLAS, TEXAS PROJECT: STONELEIGH @ RIVERCHASE OUR REPORT NO: 00652-155 COPPELL, TEXAS TECHNICIAN: J.S. WEATHER: CLOUDY TEMPERATURE RANGE: 50 TO 55 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. THE TECHNICIAN OBTAINED 3 SETS OF 4 CLIENT MADE CYLINDERS PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: PAVING "E", 40' FROM SOUTH END OF PARKING IN FRONT OF BUILDING #19 SET #2: PAVING "E", CENTER OF FIRE LANE AT BUILDING #20 SET #3: PAVING "E", CENTER OF FIRE LANE IN FRONT OF G1-A THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. ~AT THE COMPLETION OF THE SCHEDULED WORK, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. ~CC: LARRY DAVIS, CITY OF COPPELL LANNY ALLISON, CITY OF COPPELL ~JAN BERTRAND, CITY OF COPPELL ALPHA The use of c~r name a~ test results must re~ive our ~en approval Test results an~ repo~s apply only Io the samples tested an~lor o~se~e~, an~ are not ~nOl~bve of 1~ quehLes of Geotechnical Engineering 0 Construction Materials Testing 0 Environmental E~gineering 0 Consulting