Loading...
Stoneleigh P2-LR010223 ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 Renort (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-107 ATTN: KELLER WEBSTER Issue Date: 02/23/2001 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project Dssc: STONELEIGH ~ RIVERCHASE COPPELL, TEXAS RELD DATA Placement Location: SLAB: BUILDING 10 UNIT, NORTH OF MIDDLE Date Placed: 1/26/01 Plant Number: 6-3000 Time Placed: N/A Delivery Ticket No.: 6141660 Slump (ASTM C-t43): 5 Made By: CONTRACTOR Air Content: N/A Cured Specification: ASTM C-31 Air Temperature: NIA Specimen Temperature: N/A Date Received: 1129/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: CONTRACTOR Mix Data Submitted Il,/: N/A CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tested: (Day.): Length Width Diameter Sq. In. Load: PSI: 215 LAB C-617 2/2/01 7 12 N/A 6 28.27 73253 2590 216 LAB C-617 2/23/01 28 12 NIA 6 28.27 107539 3800 217 LAB C-617 2/23101 28 12 NIA 6 28.27 109802 3880 218 LAB HOLD HOLD 12 N/A 6 28.27 0 Speclflcetlon$: 28 __ 3000 I Rssults to Date: PASS Notes: CLIENT MADE CYLINDERS Respeclfully Submitted By: /~/~'z.'T, "//. of Alpha Testing, Inc. ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 "P -°e"or* (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-108 ATTN: KELLER WEBSTER Issue Date: 02/23/2001 10950 ALDER CIRCLE DALLAS. TX 75238 Fax Number: (214) 340-9100 Project De,c: STONELEIGH ~ RIVERCHASE COPPELL, TEXAS RELD DATA Placement Location: SLAB: BUILDING 10, NORTH END OF BUILDING CENTER Date Placed: 1/26/01 Plant Number: 6-3000 Time Placed: N/A Delivew Ticket No.: 6141677 Slump (ASTM C-143): 4 Made By: CONTRACTOR Air Content: NIA Air Temperature: NIA Cured Specification: ASTM C-31 Specimen Temperature: NIA Date Received: 1/29/01 Delivery Method: PICKED UP BY ALPHA Field Data Submlttad By: CONTRACTOR Mix Data Submitted By: N/A CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: PSI: 219 LAB C-617 2/2/01 7 12 N/A 6 28.27 88288 3120 220 LAB C-617 2/23/01 28 12 N/A 6 28.27 110298 39d0 221 LAB C-617 2/23/01 28 12 N/A 6 28.27 123257 4350 222 LAB HOLD HOLD 12 N/A 6 28.27 0 · Specifications: 28 3000 i Results to Date: PASS Notes: CUENT MADE CYLINDERS Respectfully Submitted By: ,,/,~', .f~v/~_~,/ of Alpha Testing, Inc. ALPHA TESTINb, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Report (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-109 ATTN: KELLER WEBSTER laaue Date: 02/23/2001 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project Desc: STONELEIGH ~} RIVERCHASE COPPELL, TEXAS FIELD DA TA Placement Location: SLAB: BUILDING 10 PATIO B6 UNIT SOUTH END Date Placed: 1/26/01 Plant Number: 6-3000 Time Placed: N/A Delivery Ticket No.: 6141699 Slump (ASTM C.143): 3.5 Made By: CONTRACTOR Air Content: N/A Cured Specification: ASTM C-31 Air Temperature: N/A Specimen Temperature: N/A Date R~.~iv~l: 1/29/01 Deliv~y Method: PICKED UP BY ALPHA Field Date Submitted By: CONTRACTOR Mix Data Submitted By: N/A CYLINDER COMPRESSION TEST RESUL TS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Typo: Spe~: Tested: (Day~): Length Width Diameter Sq. In. Load: PSi: 223 LAB C-617 2/2/01 7 12 N/A 6 28.27 87885 3100 224 LAB C-617 2/23/01 28 12 N/A 6 28.27 128495 4540 225 LAB C-617 2/23/01 28 12 N/A 6 28.27 118079 4170 226 LAB HOLD HOLD 12 N/A 6 28.27 0 i Resulte to Date: PASS Notes: CLIENT MADE CYLINDERS Respectfully Submitted By: ~ .~.~lr/~' ~? of Alpha Testing, ~nc. ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 enor, (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-107 ATTN: KELLER WEBSTER Issue Date: 02/23/2001 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number:. (214) 340-9100 Project Desc: STONELEIGH ~} RIVERCHASE COPPELL, TEXAS RELD DA TA Placement Location: SLAB: BUILDING 10 UNIT, NORTH OF MIDDLE Date Placed: 1/26/01 Plant Number: 6-3000 Time Placed: NIA Delivery Ticket No.: 6141660 Slump (ASTM C-143): 5 Made By: CONTRACTOR Air Content: N/A Cured Specification: ASTM C-31 Air Temperature: N/A Specimen Temperature: N/A Date Received: 1/29101 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: CONTRACTOR Mix Data Submitted By: N/A CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: PSI: 215 LAB C-617 2/2/01 7 12 N/A 6 28.27 73253 2590 216 LAB C-617 2/23/01 28 12 N/A 6 28.27 107539 3800 217 LAB C-617 2/23/01 28 12 N/A 6 28.27 109802 3880 218 LAB HOLD HOLD 12 N/A 6 28.27 0 i Specifications: 28 3000 I ' Results to Date: PASS I i, NOt.: CLIENT MADE CYLINDERS ~00 // · // ~ Respectfully Submitted By: //~'~//~a~I'/~,~'T',. ~/ of Alpha Testing, Inc. ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 "P -r e"or, (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-108 ATTN: KELLER WEBSTER Issue Date: 02/23/2001 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project Desc: STONELEIGH ~ RIVERCHASE COPPELL, TEXAS FIELD DATA Placement Location: SLAB: BUILDING 10, NORTH END OF BUILDING CENTER Date Placed: 1/26/01 Plant Number: 6-3000 Time Placed: N/A Delivery Ticket No.: 6141677 Slump (ASTM C-143): 4 Made By: CONTRACTOR Air Content: N/A Air Temperature: N/A Cured Specification: ASTM C-31 Specimen Temperature: N/A Date Received: 1129/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: CONTRACTOR Mix Data Submitted By: N/A CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: PSI: 219 LAB C,-617 2D./01 7 12 N/A 6 28.27 88288 3120 220 LAB C-617 2/23/01 28 12 N/A 6 28.27 110298 3900' 221 LAB C-617 2/23/01 28 12 N/A 6 28.27 123257 4350 222 LAB HOLD HOLD 12 N/A 6 28.27 0 Specifications: 28 3000 I i Results to Date: PASS I ;, Notes: CLIENT MADE CYLINDERS Respectfully Submitted By: ~/~',~.~ of Alpha Testing, Inc. ALPHA TESTING, INC. Concrete Compression Test 2209 Wisconsin St., Suite 100 Dallas, Texas '/'5229 Report (972) 620-8911 Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-109 ATTN: KELLER WEBSTER Issue Date: 02/23/2001 10950 ALDER CIRCLE DALLAS, TX 75238 Fax Number: (214) 340-9100 Project De$c: STONELEIGH ~ RIVERCHASE COPPELL, TEXAS FIELD DA TA Placement Location: SLAB: BUILDING 10 PATIO B6 UNIT SOUTH END Date Placed: 1/26/01 Plant Number: 6-3000 Time Placed: N/A Delivery Ticket No.: 6141699 Slump (ASTM C-143): 3.5 Made By: CONTRACTOR Air Content: N/A Air Temperature: N/A Cured Specification: ASTM C-31 Specimen Temperature: N/A Date Received: 1129/01 Delivery Method: PICKED UP BY ALPHA Field Data Submitted By: CONTRACTOR Mix Data Submitted By: N/A CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Spec: Tssted: (Day~): Length Width Diameter Sq. In. Load: PSI: 223 LAB C-617 2/2/01 7 12 N/A 6 28.27 87885 3100 224 LAB C-617 2/23/01 28 12 N/A 6 28.27 128495 4540 225 LAB C-617 2/23/01 28 12 N/A 6 28.27 118079 4170 226 LAB HOLD HOLD 12 N/A 6 28.27 0 : Specifications: 28 3000 Ramulte to Date: PASS Notes: CLIENT MADE CYLINDERS Respeclfully Submitted By: ,~~~/' of Alpha Tes~ng, Inc. ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 ~72/620-8~11-~72/263-4~37 (Metro,) DALLY FIELD REPORT FAX: 972/406-8023 TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 02/23/01 DALLAS, TEXAS PROJECT: STONELEIGH ~ RIVERCHASE OUR REPORT NO: 00652-136 COPPELL, TEXAS TECHNICIAN: a.A. WEATHER: MOSTLY CLOUDY TEMPERATURE RANGE: 40 TO 50 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 3 SETS OF 4 CLIENT MADE CYLINDERS. PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: BUILDING #16 SLAB SOUTHWEST A2 UNIT SET ~2: BUILDING #16 SLAB NORTHWEST B4 UNIT SET #3: BUILDING #16 SLAB NORTHWEST A2 UNIT THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING. LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF THE SCHEDULED TESTING. THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CC: LARRY DAVIS, CITY OF COPPELI_ LANNY ALLISON, CITY OF COPPELL JAN BERTRAND, CITY OF COPPELL Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting