Stoneleigh P2-LR010223 ALPHA TESTING, INC. Concrete Compression Test
2209 Wisconsin St., Suite 100
Dallas, Texas 75229 Renort
(972) 620-8911
Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-107
ATTN: KELLER WEBSTER Issue Date: 02/23/2001
10950 ALDER CIRCLE
DALLAS, TX 75238
Fax Number: (214) 340-9100
Project Dssc: STONELEIGH ~ RIVERCHASE
COPPELL, TEXAS
RELD DATA
Placement Location: SLAB: BUILDING 10 UNIT, NORTH OF MIDDLE
Date Placed: 1/26/01 Plant Number: 6-3000
Time Placed: N/A Delivery Ticket No.: 6141660
Slump (ASTM C-t43): 5 Made By: CONTRACTOR
Air Content: N/A Cured Specification: ASTM C-31
Air Temperature: NIA
Specimen Temperature: N/A
Date Received: 1129/01
Delivery Method: PICKED UP BY ALPHA
Field Data Submitted By: CONTRACTOR
Mix Data Submitted Il,/: N/A
CYLINDER COMPRESSION TEST RESULTS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Spec: Tested: (Day.): Length Width Diameter Sq. In. Load: PSI:
215 LAB C-617 2/2/01 7 12 N/A 6 28.27 73253 2590
216 LAB C-617 2/23/01 28 12 NIA 6 28.27 107539 3800
217 LAB C-617 2/23101 28 12 NIA 6 28.27 109802 3880
218 LAB HOLD HOLD 12 N/A 6 28.27 0
Speclflcetlon$: 28 __ 3000 I
Rssults to Date: PASS
Notes: CLIENT MADE CYLINDERS
Respeclfully Submitted By: /~/~'z.'T, "//. of Alpha Testing, Inc.
ALPHA TESTING, INC. Concrete Compression Test
2209 Wisconsin St., Suite 100
Dallas, Texas 75229 "P -°e"or*
(972) 620-8911
Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-108
ATTN: KELLER WEBSTER Issue Date: 02/23/2001
10950 ALDER CIRCLE
DALLAS. TX 75238
Fax Number: (214) 340-9100
Project De,c: STONELEIGH ~ RIVERCHASE
COPPELL, TEXAS
RELD DATA
Placement Location: SLAB: BUILDING 10, NORTH END OF BUILDING CENTER
Date Placed: 1/26/01 Plant Number: 6-3000
Time Placed: N/A Delivew Ticket No.: 6141677
Slump (ASTM C-143): 4 Made By: CONTRACTOR
Air Content: NIA
Air Temperature: NIA Cured Specification: ASTM C-31
Specimen Temperature: NIA
Date Received: 1/29/01
Delivery Method: PICKED UP BY ALPHA
Field Data Submlttad By: CONTRACTOR
Mix Data Submitted By: N/A
CYLINDER COMPRESSION TEST RESULTS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: PSI:
219 LAB C-617 2/2/01 7 12 N/A 6 28.27 88288 3120
220 LAB C-617 2/23/01 28 12 N/A 6 28.27 110298 39d0
221 LAB C-617 2/23/01 28 12 N/A 6 28.27 123257 4350
222 LAB HOLD HOLD 12 N/A 6 28.27 0
· Specifications: 28 3000
i Results to Date: PASS
Notes: CUENT MADE CYLINDERS
Respectfully Submitted By: ,,/,~', .f~v/~_~,/ of Alpha Testing, Inc.
ALPHA TESTINb, INC. Concrete Compression Test
2209 Wisconsin St., Suite 100
Report
(972) 620-8911
Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-109
ATTN: KELLER WEBSTER laaue Date: 02/23/2001
10950 ALDER CIRCLE
DALLAS, TX 75238
Fax Number: (214) 340-9100
Project Desc: STONELEIGH ~} RIVERCHASE
COPPELL, TEXAS
FIELD DA TA
Placement Location: SLAB: BUILDING 10 PATIO B6 UNIT SOUTH END
Date Placed: 1/26/01 Plant Number: 6-3000
Time Placed: N/A Delivery Ticket No.: 6141699
Slump (ASTM C.143): 3.5 Made By: CONTRACTOR
Air Content: N/A Cured Specification: ASTM C-31
Air Temperature: N/A
Specimen Temperature: N/A
Date R~.~iv~l: 1/29/01
Deliv~y Method: PICKED UP BY ALPHA
Field Date Submitted By: CONTRACTOR
Mix Data Submitted By: N/A
CYLINDER COMPRESSION TEST RESUL TS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Typo: Spe~: Tested: (Day~): Length Width Diameter Sq. In. Load: PSi:
223 LAB C-617 2/2/01 7 12 N/A 6 28.27 87885 3100
224 LAB C-617 2/23/01 28 12 N/A 6 28.27 128495 4540
225 LAB C-617 2/23/01 28 12 N/A 6 28.27 118079 4170
226 LAB HOLD HOLD 12 N/A 6 28.27 0
i Resulte to Date: PASS
Notes: CLIENT MADE CYLINDERS
Respectfully Submitted By: ~ .~.~lr/~' ~? of Alpha Testing, ~nc.
ALPHA TESTING, INC. Concrete Compression Test
2209 Wisconsin St., Suite 100
Dallas, Texas 75229 enor,
(972) 620-8911
Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-107
ATTN: KELLER WEBSTER Issue Date: 02/23/2001
10950 ALDER CIRCLE
DALLAS, TX 75238
Fax Number:. (214) 340-9100
Project Desc: STONELEIGH ~} RIVERCHASE
COPPELL, TEXAS
RELD DA TA
Placement Location: SLAB: BUILDING 10 UNIT, NORTH OF MIDDLE
Date Placed: 1/26/01 Plant Number: 6-3000
Time Placed: NIA Delivery Ticket No.: 6141660
Slump (ASTM C-143): 5 Made By: CONTRACTOR
Air Content: N/A Cured Specification: ASTM C-31
Air Temperature: N/A
Specimen Temperature: N/A
Date Received: 1/29101
Delivery Method: PICKED UP BY ALPHA
Field Data Submitted By: CONTRACTOR
Mix Data Submitted By: N/A
CYLINDER COMPRESSION TEST RESULTS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: PSI:
215 LAB C-617 2/2/01 7 12 N/A 6 28.27 73253 2590
216 LAB C-617 2/23/01 28 12 N/A 6 28.27 107539 3800
217 LAB C-617 2/23/01 28 12 N/A 6 28.27 109802 3880
218 LAB HOLD HOLD 12 N/A 6 28.27 0
i Specifications: 28 3000 I
' Results to Date: PASS
I
i,
NOt.: CLIENT MADE CYLINDERS ~00
// · // ~
Respectfully Submitted By: //~'~//~a~I'/~,~'T',. ~/ of Alpha Testing, Inc.
ALPHA TESTING, INC. Concrete Compression Test
2209 Wisconsin St., Suite 100
Dallas, Texas 75229 "P -r e"or,
(972) 620-8911
Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-108
ATTN: KELLER WEBSTER Issue Date: 02/23/2001
10950 ALDER CIRCLE
DALLAS, TX 75238
Fax Number: (214) 340-9100
Project Desc: STONELEIGH ~ RIVERCHASE
COPPELL, TEXAS
FIELD DATA
Placement Location: SLAB: BUILDING 10, NORTH END OF BUILDING CENTER
Date Placed: 1/26/01 Plant Number: 6-3000
Time Placed: N/A Delivery Ticket No.: 6141677
Slump (ASTM C-143): 4 Made By: CONTRACTOR
Air Content: N/A
Air Temperature: N/A Cured Specification: ASTM C-31
Specimen Temperature: N/A
Date Received: 1129/01
Delivery Method: PICKED UP BY ALPHA
Field Data Submitted By: CONTRACTOR
Mix Data Submitted By: N/A
CYLINDER COMPRESSION TEST RESULTS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Spec: Tested: (Days): Length Width Diameter Sq. In. Load: PSI:
219 LAB C,-617 2D./01 7 12 N/A 6 28.27 88288 3120
220 LAB C-617 2/23/01 28 12 N/A 6 28.27 110298 3900'
221 LAB C-617 2/23/01 28 12 N/A 6 28.27 123257 4350
222 LAB HOLD HOLD 12 N/A 6 28.27 0
Specifications: 28 3000 I
i Results to Date: PASS
I
;,
Notes: CLIENT MADE CYLINDERS
Respectfully Submitted By: ~/~',~.~ of Alpha Testing, Inc.
ALPHA TESTING, INC. Concrete Compression Test
2209 Wisconsin St., Suite 100
Dallas, Texas '/'5229 Report
(972) 620-8911
Tested For: SPRING VALLEY CONSTRUCTION Our Report No.: 00652-109
ATTN: KELLER WEBSTER Issue Date: 02/23/2001
10950 ALDER CIRCLE
DALLAS, TX 75238
Fax Number: (214) 340-9100
Project De$c: STONELEIGH ~ RIVERCHASE
COPPELL, TEXAS
FIELD DA TA
Placement Location: SLAB: BUILDING 10 PATIO B6 UNIT SOUTH END
Date Placed: 1/26/01 Plant Number: 6-3000
Time Placed: N/A Delivery Ticket No.: 6141699
Slump (ASTM C-143): 3.5 Made By: CONTRACTOR
Air Content: N/A
Air Temperature: N/A Cured Specification: ASTM C-31
Specimen Temperature: N/A
Date Received: 1129/01
Delivery Method: PICKED UP BY ALPHA
Field Data Submitted By: CONTRACTOR
Mix Data Submitted By: N/A
CYLINDER COMPRESSION TEST RESULTS
Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Spec: Tssted: (Day~): Length Width Diameter Sq. In. Load: PSI:
223 LAB C-617 2/2/01 7 12 N/A 6 28.27 87885 3100
224 LAB C-617 2/23/01 28 12 N/A 6 28.27 128495 4540
225 LAB C-617 2/23/01 28 12 N/A 6 28.27 118079 4170
226 LAB HOLD HOLD 12 N/A 6 28.27 0
: Specifications: 28 3000
Ramulte to Date: PASS
Notes: CLIENT MADE CYLINDERS
Respeclfully Submitted By: ,~~~/' of Alpha Tes~ng, Inc.
ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
~72/620-8~11-~72/263-4~37 (Metro,) DALLY FIELD REPORT
FAX: 972/406-8023
TESTED FOR: SPRING VALLEY CONSTRUCTION DATE: 02/23/01
DALLAS, TEXAS
PROJECT: STONELEIGH ~ RIVERCHASE OUR REPORT NO: 00652-136
COPPELL, TEXAS
TECHNICIAN: a.A.
WEATHER: MOSTLY CLOUDY TEMPERATURE RANGE: 40 TO 50
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE AS REQUESTED TO
MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED.
WHILE ON SITE THE TECHNICIAN OBTAINED 3 SETS OF 4 CLIENT MADE CYLINDERS.
PER THE ON SITE REPRESENTATIVE THE CYLINDERS WERE MOLDED FROM THE FOLLOWING LOCATIONS: SET #1: BUILDING #16 SLAB SOUTHWEST A2 UNIT
SET ~2: BUILDING #16 SLAB NORTHWEST B4 UNIT
SET #3: BUILDING #16 SLAB NORTHWEST A2 UNIT
THE CYLINDERS WERE RETURNED TO THE LABORATORY FOR PROCESSING.
LABORATORY COMPRESSION TEST RESULTS WILL FOLLOW ON A SEPARATE REPORT.
AT THE COMPLETION OF THE SCHEDULED TESTING. THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
CC:
LARRY DAVIS, CITY OF COPPELI_
LANNY ALLISON, CITY OF COPPELL
JAN BERTRAND, CITY OF COPPELL
Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting